Job Recruitment Website - Property management - What are the emergency plans for flood control?

What are the emergency plans for flood control?

Give you a sample for reference:

1, the purpose of the plan.

This plan is formulated in order to effectively deal with sudden flood control events and minimize the adverse impact of sudden flood events on the property safety of the group company and its customers in flood season.

application area

It is suitable for emergency preparation and response in case of sudden flood in the property.

Institutional responsibility

3. 1 emergency headquarters Organization Commander: Deputy Emergency Commander: Command Member: Emergency Rescue Team Member: All members of Security Department and Engineering Department are the main ones, supplemented by employees of other departments. 3.2 Command function

Supervise and inspect all departments in a timely and effective manner according to the formulated emergency plan;

Organize to submit emergency information to higher authorities;

All functional departments and institutions of the property are responsible for handling all kinds of emergencies and organizing pre-plan drills according to the principle of grading.

Be responsible for convening the on-site leaders of all departments involved in the on-site work and defining the work undertaken by all departments in case of emergency.

Organize to delimit the scope of the site and implement the necessary control;

Study the on-site disposal plan, formulate specific measures, and decide the dispatch, support and rotation of personnel.

Grasp the progress of work and apply for in-hospital or out-of-hospital support in case of insufficient manpower and material resources. Other departments in the hospital actively cooperate to deal with emergencies according to this plan.

Supervise and inspect all relevant departments to make relevant emergency preparations according to the emergency plan;

4. Responsibilities of each department 4. 1 Responsibilities of Security Department 4. 1. 1 Notify the service center and contact the commanding member; 4. 1.2 contact the park property and control the related facilities; 4. 1.3 Organize emergency rescue in public areas and manage flood control materials; 4. 1.4 Outreach to fire control public security and report to "119"; 4. 1.5 broadcast the evacuation broadcast according to the flood level; 4. 1.6 Identify key parts and organize relief supplies; 4. 1.7 Ensure complete facilities and flood control tools. 5. The responsibility scope of the engineering department is 5. 1, and special personnel are on duty to ensure that the equipment is in good condition; Water and electricity needed for disaster relief, and the project is fully guaranteed; 5.2 Organize emergency rescue facilities and manage flood control materials; 5.3 Provide emergency rescue and rescue valuable materials; 6. The duty scope of Hattori is 6. 1, which is responsible for managing rain gear and assisting disaster relief personnel; 6.2 Cooperate with emergency rescue work and keep emergency supplies; 6.3 Contact medical units to provide rescue environment. 7. The scope of responsibility of the Administration Department is 7. 1, organizing looting of goods and transferring important goods; 7.2 Contact the commander and do a good job of appeasement. 8. Key parts of flood control

8. 1 According to the characteristics of flood control, the key flood control parts of CSR Mansion are determined as power distribution room, elevator shaft, finance room, archives room and office.

9. Flood control facilities

9. 1 The key parts of flood control should have corresponding facilities: drainage pipes, pumps, sandbags, water baffles, etc.

10. Supervision and inspection system

10. 1 the engineering department of the property security department should take various preventive measures as soon as possible before the rain period, and designate special personnel to regularly check the sandbag stock and water pump equipment;

10.2 check whether the three ditches (gutter, open ditch and sewer) are unblocked in time;

10.3 check whether the roof doors and windows are closed;

10.4 during flood control, all kinds of equipment should be prepared, and the water pump should be maintained to make it ready for war at any time;

10.5 when the gale comes, make a surprise inspection of the items that may fall, and immediately rectify the hidden dangers found.

1 1. Flood control procedures

1 1. 1 At any time, the person in charge of the security department shall immediately notify the emergency commander.

1 1.2 When a general flood occurs, the security department advises the large property engineering department to open the manhole cover in time to speed up drainage.

1 1.3 In case of serious flood, the security department shall promptly notify the property minister whether to call the police to 1 19. Notify the big property * * * for emergency rescue.

1 1.4 Organize the flood fighting and rescue team of the Ministry of Security to assist in carrying sandbags to prevent stagnant water from flowing into the machine room, elevator shaft, accounting room, archives room and office.

1 1.5 If there is water that may flow into the elevator, notify the Engineering Department to lift the elevator that may be flooded to a high place;

1 1.6 If water enters the key parts such as the power distribution room \ elevator, start the emergency treatment process of water running accident mainly implemented by the engineering department.

1 1.7 distribution room:

1, set sandbags or take all other effective measures to prevent water from spreading in the distribution room.

2. Turn off the switch in the flooded area to prevent people from getting an electric shock.

3. Organize forces to take various measures, including using brooms and water pumps to absorb water, drain accumulated water, clean up the site, restore cleaning as soon as possible and dehumidify electrical equipment. When it is confirmed that moisture has been removed and the insulation resistance reaches the specified value, the power transmission test run can be carried out (power transmission is carried out according to the switching operation procedure of the transformer room), and the formal operation can be carried out only after no abnormality is observed.

4. Hold a meeting, analyze the cause of the accident, sum up experience and lessons, and take measures to prevent similar accidents. And record the flooding inspection report in detail, and record the reasons, treatment methods, hazards and preventive measures of flooding.

1 1.8 elevator:

1. Set water blocking sandbags on the passage where water spreads or take all other effective measures to prevent water from spreading to the elevator.

2, when there is a small amount of water or water seepage in the pit, the elevator should stop at the second floor above, stop running, disconnect the main power supply.

3, when flooding occurs, should quickly cut off the source of water leakage, try to make electrical equipment without water or less water. When the floor is flooded and the hoistway or pit is flooded, the car should stop at the upper second floor of the water inlet floor station, and the elevator should stop running to prevent the car from being flooded.

4. The flooded elevator should be dehumidified, such as wiping, hot air drying, natural ventilation, pipe replacement, etc., and the flooded elevator can be put into operation only after the test run is normal. For the elevator controlled by microcomputer, check it carefully to avoid burning the electronic board.

5. When the elevator resumes operation, it should be confirmed that there is no water accumulation and no short circuit before use. For those elevators that are eager to use, you can use drying methods (such as using a hair dryer) to remove all the accumulated water that may cause short circuits.

6. Hold a meeting, analyze the cause of the accident, sum up experience and lessons, and take measures to prevent similar accidents. And record the flooding inspection report in detail, and record the reasons, treatment methods, hazards and preventive measures of flooding.