Job Recruitment Website - Property management - Annual summary report of quality control work

Annual summary report of quality control work

When writing a debriefing report, we should conscientiously sum up the characteristics of the work in a limited period, grasp the essence, find the typical, and reflect the general with the outstanding and typical events in this period. Next, I'll show you five model articles on the annual summary report of quality control work, hoping to help you!

Quality control work summary report 1

I joined _ _ company on August 5th, 20th. With the correct leadership of the company leaders and the close cooperation of all my colleagues, I love my work, abide by my duties, be pragmatic and determined. I quickly integrated into the company's cultural atmosphere and successfully completed my own work and other tasks assigned by the leaders. I have been constantly adapting to my busy life. Unconsciously, I have reached 20__, gained a lot and felt a lot. Here, I make a summary of my work in the company for half a year.

First, performance.

Constantly understand and master the company's quality control policy and various quality control methods, strictly implement the company's quality policy, set an example everywhere, and constantly improve their awareness of quality concepts. Follow the documents and product standards used by the quality control department for various control operations, and operate in strict accordance with the documents and standardize the operation. Mainly responsible for R&D department's finished product inspection, software testing, sample testing, first article confirmation, external processing factory inspection, external processing site quality supervision and assisting IQC incoming inspection; When problems are found in the routine inspection, the person in charge of the project or the person in charge of relevant departments can be informed in time, so as to solve the problems in time.

Since joining the company, there have been many events, especially some Asian Games events in August and September. During the emergency delivery, it is difficult to guarantee the product quality. During this period, timely complete the procurement and research and development of samples and send them for inspection; I have made many business trips to suppliers for on-site quality monitoring, such as the first piece confirmation of Dongguan Zhonghao P 16 module box, the first piece confirmation of aluminum processing of lamps in Haoersheng Bridge Crossing Project, and the on-site monitoring of material spraying quality in Liwen Factory. These tasks are arduous and arduous, and can be successfully completed with the support of managers and colleagues. The most impressive time was to go to Kuanhong Factory to supervise the processing quality of the driving plate of the CDU box crossing the bridge. This factory is small in scale and weak in quality management. When monitoring the factory, I constantly ask the factory to follow the process requirements of our company, and prepare relevant lamps and instruments to the factory for testing and inspection. In order to ensure the processing quality, I have to commute between Kuanhong and the company every day for more than 2 weeks. Although it is very hard, it is very gratifying to see the final work results.

At work, I do my duty and finish the tasks assigned by the manager in time. At the same time, under these pressures, I am constantly familiar with various products such as lamps and monitors. After each project is completed, conduct long-term aging tests on products of important projects and submit aging reports in time.

In terms of work attitude, strictly abide by and implement the company's rules and regulations and discipline requirements, so as to go to work on time, not to be late, not to be absent from work, and to obey the leadership's work arrangements; Finish the tasks assigned by the leaders on time, don't be emotional, perform your duties consciously, and finish your tasks seriously and actively.

Generally speaking, this year's work is hard and effective, especially during the Asian Games project, due to the shortage of manpower in the department, we actively assisted IQC to complete the incoming inspection to ensure the timely storage and use of materials without affecting the production of the production line; Complete the sample inspection of purchasing and R&D department in time to ensure that purchasing and R&D department know the corresponding materials and products in time so as to take the next step; Complete the first piece confirmation of materials in time, including the first piece sent by the purchasing department to the supplier for confirmation and the first piece confirmation required by the purchasing department from the supplier; Standardize and manage the long-term aging test of products, standardize and manage test methods, tests and reports, and submit inspection reports in time every week; Assist in the preparation and management of departmental documents, so that the company's documents and related records are gradually systematized and standardized, reducing the workload and making it easier to work at ordinary times. In addition to completing their own work and tasks assigned by the manager, actively cooperate with colleagues to complete various tasks and constantly strive to improve the department's workflow.

Second, the main harvest and experience

Joining _ _ company and constantly learning and growing in the busy work can be said to be fruitful. I have a deeper understanding of the company's materials and related products, because I am more and more familiar with the characteristics of these materials by investigating various raw materials and even going to the supplier's site to understand the technology of the materials; I knew little about LED lamps and displays before I joined the company, but now I have a deep understanding of all kinds of lamps and displays in the company. I am familiar with various standards of lamps and displays, as well as relevant inspection methods and instruments. At the same time, I have mastered the use of various inspection instruments in my work and can actually complete the inspection work. I have a more comprehensive understanding of quality management. At work, I have a comprehensive understanding of the company's quality policies and management measures, and at the same time constantly improve my awareness of quality management to promote the improvement of product quality.

We often encounter difficulties in our work. The deepest experience is not to be afraid of difficulties, and you can't finish the task because of difficulties. The most correct attitude is to face the difficulties, list them one by one, and come up with proper solutions. When we need the cooperation of other colleagues and other departments, we should pay more attention to communication skills so as to get help from others.

Third, the shortcomings and areas that need improvement.

This year, I have done some work and made some achievements, but there are still some gaps from the requirements of leaders and colleagues. For example, the company's main products are Led lighting and display screen, but I don't know enough about the commonly used specifications and testing standards and have insufficient experience. This will accumulate experience in the follow-up work, master the testing methods and specifications, and further master the key quality control points of the company's products.

At the same time, it is also found that some inspection and testing specifications are not perfect, and there is no set of standardized methods for reference, but they all need to be inspected according to work experience, which is often prone to loopholes. I hope it can be improved in the follow-up work.

Determined to redouble our efforts in the follow-up, carry forward achievements, overcome shortcomings, do all the work with a highly responsible attitude towards work and career, be down-to-earth, be conscientious, consult more old employees and colleagues, learn from their good work experience, use their spare time to learn more about lamps, constantly improve their work skills and work ability, and strive to become employees satisfied with the company, leaders and colleagues.

Quality control work summary report II

In a blink of an eye, 20___ years have passed, and I have gone through three spring and autumn periods with "_ _" * *, and then look back at the past year. Different from the past, I became the manager of quality control department this year. This year, I have been growing up under the guidance, support and help of company leaders and colleagues in the quality control department, and my management ability, team awareness and professional level have been greatly improved, and I have served as the quality control department. In the past year, as the assistant manager of the quality control department, I have experienced ups and downs. My management experience is insufficient, the professional knowledge of the employees in the quality control department is not proficient, the quality of the personnel is uneven, and the work is not attentive, which leads to frequent quality accidents. These returns not only brought huge economic losses and immeasurable reputation losses to the company, but also brought relatively large economic losses to the leaders of the manufacturing headquarters and individuals in the quality control department.

Behind every quality accident, we have learned a great lesson. I led all the staff in the quality control department to summarize the experience and lessons of every quality accident, which laid the foundation for avoiding the occurrence of quality accidents for 20 years. This year, my team members and the production department repeatedly had some minor inspections because of product grading, which made our quality control department leave a bad impression on the production department, but we didn't flinch. I have always insisted that "being responsible for product quality" means being responsible for the leader and the company. This year, I really matured a lot, learned a lot, learned to be strong, learned how to get out of confusion, learned to dare to face everything and so on. But I also know that I also have many shortcomings, such as "being too gentle and not good at communicating with subordinates". On 20__, I will correct my own shortcomings and those of my team.

20___ A new year means a new starting point, new opportunities, new challenges and a new beginning. In 20 years, our company has built many new production lines, which need us to learn and learn more. Therefore, I made the following work plan:

1. Take advantage of the off-season after the Spring Festival to organize all personnel in the quality control department to learn the new national standard knowledge and new production line detection methods.

2. Communicate with subordinates, understand employees' ideas, and fully mobilize the enthusiasm of employees in the quality control department.

3. Improve their professional knowledge, judge the product grade fairly and justly, improve the quality awareness of the employees in the quality control department through words and deeds, apply the dogma of "quality is life" to every product, and stick to it unswervingly.

4. Make full use of the pre-shift meeting in the off-season to find out the solutions to the problems encountered by employees in their daily work in time and convey them to every employee in the quality control department. With our 20-year experience and lessons in product quality, and the confidence of all the staff in our quality management department in product quality management for 20 years, I believe that the product quality of our manufacturing headquarters will reach a higher level in 20 years.

Quality control work summary report 3

Over the past 20__ years, the technical quality department of our company has continued to abide by the company's quality policy of "keeping promises, pursuing perfection, and bringing expected projects and services to users", and has worked hard and contributed all its strength to the steady development of the project management department. This year, we have overcome various technical problems, strictly implemented product quality standards, carefully studied and applied under the guidance of the company's refined management, and successfully fulfilled the requirements of the project department for our department. The following is a summary of this year's work.

First, co-ordinate and make plans.

In the overall coordination and continuous access to relevant information, in the serious preparation work, strictly abide by the requirements of design technical documents, formulate targeted construction organization design and various schemes in combination with the characteristics of the site environment, and continuously provide technical training and technical disclosure to workers. On the one hand, the technical director is familiar with the construction drawings and thoroughly understands every detail in the construction drawings, so as to know fairly well. On the other hand, they carefully studied the specifications and relevant acceptance quality standards, and used these standards to guide the actual construction process on site, so that all the projects we did were qualified and stood the test.

Judging from the attention, profundity, perfection and presentation effect of the technical quality department data, I think our technical quality department has made obvious progress than before. On the basis of improving the handover data of previous projects and the technical quality control of projects under construction, the Technical Quality Department began to focus on the refined management of the company this year, seize the main line of accelerating the transformation of economic development mode, grasp the direction of becoming stronger and better, unswervingly take the road of "new, special and refined" and strengthen construction management.

Second, the work performance

In quality management, the qualified rate of pipeline flaw detection is controlled above 96%, which requires the joint efforts of managers and construction teams to achieve this goal. Refine the management method of system pressure test package and strictly implement it to avoid cutting, repair welding and design change after pressure test, and improve the engineering quality and construction progress. Supervise the construction team to carry out self-inspection seriously, and each technical director shall continuously check the job number or area he is responsible for every day.

In order to strengthen the construction team leader's attention to quality, a construction team leader or a technician from the technical quality department will be arranged to lead the team to conduct quality inspection tour every Thursday. At the same time, cooperate with the supervisor and the owner to conduct safety and quality inspection every Monday. Through regular meetings, feedback the inspection results, and ask all construction teams to seriously rectify the problems. Through such an uninterrupted inspection method, we strive to find and rectify the corresponding common faults and quality problems as soon as possible. Promote quality inspectors to continuously enhance quality awareness and improve initiative and purpose.

In terms of quality report and data management, we will further improve the project quality responsibility system in different disciplines and regions, and designate special personnel to fill in, track and feedback the quality report to ensure its integrity and authenticity. Strengthen the role of the reference room, and the librarians will collect, classify, number, submit, feedback and archive all the project data to ensure that all the processes are well documented and improve the efficiency of project completion data acceptance.

On the training and management of technical and quality personnel, on the one hand, strengthen the training of technical personnel in the Technical Quality Department, be responsible for the construction plan, quality control and engineering quantity accounting of a work number or an area, and communicate with the supervisor and the owner to deal with the problems arising in the construction; On the other hand, strengthen the training of construction workers, arrange workers to take relevant examinations, and require special operations personnel to hold relevant certificates.

Through planned training, the quality awareness of relevant personnel has been strengthened and the occurrence of quality problems has been reduced. Through refined quality management, the construction team of the project department further improved the quality of finished product protection. More importantly, the professional technicians in the Technical Quality Department realize the importance of fine management and consciously learn and apply the knowledge of fine management, which will surely bring immeasurable results to the long-term development of the project department.

Third, there is insufficient work.

Most technicians are freshmen and lack work experience. In order to speed up the improvement of the comprehensive level of the department, we must strengthen the training work and take the lead in guiding, so that they can grow rapidly and contribute their own strength to the development of the project department. In the construction, we should continue to think about the interaction between the front and back processes, not just pay attention to the front and ignore the back, but comprehensively consider and adopt reasonable construction technology. Should continue to strengthen the management of the corresponding construction personnel, presided over by the project manager to prepare a reasonable, scientific and feasible quality reward and punishment system. According to the construction quality of the project, rewards and punishments shall be carried out according to the system to convince the construction team of the quality. During the construction, technicians should constantly strengthen on-site learning, so as to combine theory with practice, discuss specific problems, promote each other and learn from each other.

There are still some shortcomings in refined management, mainly in the current personnel training and management, especially the operators. Due to the limitation of conditions, it is impossible to train technicians and operators continuously and systematically. Some people have a weak sense of quality, and their work efficiency is low, so they can't handle emergencies well, which directly affects the construction progress and increases the cost, especially in the use of covered electrode, resulting in great waste. In the next step, we will strengthen the implementation of fine management and urge everyone in the technical quality department to consciously learn and apply the concept of fine management.

Fourth, the work plan for next year

Learn professional technology, try to cover everything, from civil engineering and installation to electrical instruments, and make every effort to keep up with the development of the project and become a compound talent. Strengthen the training of new employees, formulate a perfect management system, and let them grow up as soon as possible. Organize training and study, conduct technical exchanges, raise awareness and make progress at the same time. After the scheme is completed, conduct technical review, discuss the feasibility in the form of meeting, and finally determine the construction scheme. Avoid and reduce mistakes that should not be made and delay the construction period. Data is an indispensable part of the project handover process, so in terms of data management, we must start from the source.

More than 20 years' work has given us a lot of enlightenment and lessons. Next year will be another challenging year for us. All the staff of the technical department must take project management as the core, pay attention to quality and efficiency, comprehensively promote the development of all work, and do their bit for the company to achieve greater glory!

Quality control work summary report 4

Time flies, 20__ years have passed in a blink of an eye. Looking back on the work of 20 years, with the correct leadership of the company and the strong support of various departments, the quality control department has made great progress. This year, with the changes and changes in jobs and work contents, a series of adaptations and adjustments were made to work ideas and methods, and the joy of harvest was also integrated into all work. This year, we carried out our work closely around the service tenet of "careful management and caring service", fully performed our duties, highlighted the key points of work, and paid close attention to the construction of service quality management, and successfully completed the annual objectives and tasks.

I. Main achievements and 20-year review:

(1) Strengthen employees' ideological education, stabilize employees' working mood, and ensure the normal development of all work. The year of 20__ is a year of all-round development of the company, and it is also a year when the quality control department has just started. As the guiding department of the company's business development, how to standardize the company's internal construction and business development and supervise the effective and smooth completion of all the work has become a systematic work of the quality control department, so we deeply realize the importance and arduousness of the work of this department. As a quality manager, you must have good ideological quality, excellent business knowledge and certain management innovation ability. In the face of pressure, we carry out in-depth ideological education for employees.

Call on all employees to recognize the status quo, update the service concept and other activities, actively participate in various meetings and trainings of business departments, and gradually make everyone calm down, unload their ideological burdens, and build up their confidence, so as to mobilize the enthusiasm of employees and improve the service quality, which is well received by company leaders and departments.

(2) In order to meet the development needs of the company and the timeliness of work, ISO900 1 quality management system is gradually introduced. With the vigorous development of the Group's real estate industry, property management has also maintained a sustained and stable development trend, and its development scale has expanded rapidly. In order to maintain the competitive advantage in the market, the company began to pay attention to the introduction of international quality standards, hoping to establish and operate a quality management system by implementing ISO900 1 international quality standards, and effectively improve the quality level of property management services. At the same time, it will lay a good foundation for future quality system certification, gain market recognition of our management service quality, and enhance the market competitiveness and market development ability of enterprises. As a newly established department, Quality Control Department earnestly studies the professional knowledge of quality management system, actively explores the working methods and ideas of introducing ISO900 1 quality management system, collects and sorts out the documents of property management quality system in the same industry, gradually standardizes the daily management service quality records of various departments, establishes the management service quality inspection mechanism, and carries out quality inspection on a regular basis. Timely put forward rectification opinions on the problems existing in the inspection and complete them within a time limit. Although we often encounter resistance, we resist pressure, are not afraid of difficulties and cynicism, and insist on quality inspection, which makes the management of Cui Li Jiayuan Project Office chaotic.

The misplacing of articles in the reference room has completely changed. At the same time, pay close attention to the implementation of the work, timely check the implementation of unqualified rectification items in daily management until the rectification is qualified, and further standardize the property project management service system.

(three) due diligence, communicate with the outsourcing unit of the property subcontracting service project, and complete the review and signing of various contracts. Contract review is the basic means to protect the rights of both parties, and it has legal effect once it is signed and takes effect. Contract is the source of economic activities of suppliers, and it is also an important basis for our management of service activities. Whether the supplier can fulfill the contract requirements directly affects our reputation, so it is very important to do a good job in contract evaluation under the contract environment. Before the contract is formally signed, in order to ensure that the quality requirements and the economic responsibilities of both parties are reasonable and clear, we require suppliers to conduct a comprehensive review of the draft contract, which is also an important measure to prevent quality risks. Since the contract cannot be changed unilaterally after it takes effect, both the supplier and the supplier should bear the economic responsibility and risk. Therefore, although contract review is the responsibility of the supplier, it is necessary for both the supplier and the supplier. Therefore, the Quality Control Department strengthened communication and coordination with suppliers, frequently exchanged opinions, organized contract review activities, and adjusted the contract contents in time, so that the suppliers could clearly understand our requirements, and finally the two sides reached an agreement until the contract was formally signed, which effectively guaranteed the interests of the company.

Second, the problems existing in the work in the past twenty years.

Generally speaking, in the next year, the quality control department also cooperated with other relevant departments to complete the annual review of the company's qualifications, the upgrade of charging software, and community publicity.

The opening of 1, business contact of power supply department, survey of opinions of business households and other related work. Looking back on the past year, although we have done a lot of work and achieved gratifying results, there is still a certain gap with the company's requirements:

(A) coordination and communication with individual departments is not coordinated enough.

(B) quality supervision and management is not strong enough, management is not bold enough.

(3) The knowledge of ISO 9001system is not enough, and the ability to write quality system documents is not available.

Three, 20__ year work plan and specific measures

In the new year, the quality control department will carry forward the past and earnestly do the following work:

(1) Do a good job of monthly inspection, strengthen communication with all departments of the company, and strive to assist relevant departments to improve service quality.

(two) conscientiously do a good job in the verification of the implementation of the monthly work plan of each department, and actively urge all the work to be implemented on time.

(three) do a good job of special inspection, and urge all departments to operate according to the system.

(4) Do a good job of verification and provide authentic materials for leaders.

(5) Continue to explore the operation of compiling and importing ISO900 1 quality system documents.

(VI) It is very important to study hard on quality system knowledge, carry out quality system knowledge training in a timely manner, and use employees to understand and understand the standardized quality management system.

Quality control work summary report

Over the past year, as an electrical worker in a power plant, I have worked hard to learn professional and technical knowledge with full enthusiasm, strictly abide by various operating procedures, humbly seek advice, unite my colleagues, constantly improve my working ability and do my job well. Now let me sum up my work in the past year.

A, serious and responsible work, dedication.

Use the company's philosophy to demand yourself, treat others honestly, do things practically, obey the arrangement of leaders, overcome physical discomfort, and always treat work with a positive and serious attitude. Carry forward the style of hard work, so that the project can proceed smoothly.

Second, study hard in technology and memorize operating procedures in theory.

Self-purchased electrical learning materials; In practice, strictly abide by the operating rules, cultivate the ability of independent operation, ensure that no misoperation accidents occur, write down the problems encountered in work, experience gained and matters needing attention at any time, and humbly ask the master and Commissioner for advice. Although I have been able to work independently, I know that it takes time to hone and accumulate knowledge, step by step, and don't forget to read books on chemical engineering, so that my body and mind can not work.

Third, the improvement of ability.

Ability includes coordination ability and accident handling ability. If "technology" is compared to "intelligence quotient", then "ability" can be compared to "emotional quotient", and so can electrical specialty. A high IQ does not necessarily mean a high EQ, because technology is dead and ability is alive. Only by learning and using can we do better.

Fourth, accumulate work experience and implement the company's "energy saving and consumption reduction"

On the basis of qualified water quality, excellence and safe operation are the first, and economic operation should also be taken into account. Understand the load change, try to open the exhaust port of Dalian at low load to ensure the steam quality and make the boiler water qualified and stable as soon as possible, while at high load, the exhaust port is too large, and the pollution discharge effect is neither obvious nor wasted. Therefore, on the basis of opening Dalian platoon as much as possible, we should try our best to save resources and grasp the balance between the two. In order to kill three birds with one stone, it is more about careful measurement, careful monitoring, worrying about equipment and patient communication.

Verb (abbreviation of verb) work suggestion

Can the safety facilities be more perfect and detailed, set up protective measures for equipment misoperation, prepare failure drill plans to prevent problems before they happen, update the traditional concept of electrical supervision, and change passive disposal into active foresight and prevention? Strengthening the degree of microcomputer automation can make full use of network resources, make them make the best use of, and make electrical supervision more sensitive and efficient; Improve the automatic operation and maintenance of electricity and instruments, and make the electrical results more scientific and accurate.

Articles related to the annual summary report of quality control:

★ 2020 year-end summary report of quality management department

★ There are five model essays on the work summary report of the Quality Department.

★ Quality Control Personal Work Summary in 2020

★ 3 personal work summaries on quality control.

★ Five selected quality supervisors' annual work summaries.

★ Work summary report of quality director

★ 3 Model essay on quality control year-end summary

★ Work Summary of Quality Department in 2020 5

★ Collection of Personal Work Summary Models for Quality Controllers in 2020

★ Five selected year-end summary reports of the Quality Department.