Job Recruitment Website - Property management - Shenzhen Metro Line 6 and 10 will be opened soon, and the station entrances and exits will be announced again.
Shenzhen Metro Line 6 and 10 will be opened soon, and the station entrances and exits will be announced again.
The total length of Metro Line 6 is about 49.4km.
The first phase of the project is about 37.6 kilometers long.
From Shenzhen North Railway Station to Songgang Station.
Set up 20 sites
(including 5 underground stations and 15 elevated stations)
The total length of the second phase project line is about11.8km.
Including 7 stops and 7 sections, and 4 transfer stations.
This line starts from Shenzhen North Station.
Leading out of reserved viaduct project
Passing through Longhua, Futian and Luohu District.
Last Science Museum Station
The information of the two stations of Line 6 announced this time.
They are Tongxin Ling Station and Science Museum Station.
Tongxinling station
『? Site information? 』
Tongxinling Station is located on Shangbu Road on the south side of the intersection of Shangbu Road and Lihong Road in Futian District, and it is arranged in a north-south direction. The station is a three-story underground single-column double-span structure, with three entrances A, E and F, and then transfer to Line 3.
Among them, exit A is located at Lihong Road, near Sichuan Building; E port is located on the east side of Shangbu Road, close to Tongxinling Community; Exit F is located on the west side of Shangbu Road, near Shenkan Building.
Science museum station
▲ Schematic diagram of entrance and exit distribution of Science Museum Station
『? Site information? 』
The Science Museum Station is located at the intersection of Shangbu Road and Shennan Avenue to Binhe Avenue, which is arranged in a north-south direction. Transfer to 1 line. The station is a three-story underground single-column double-span reinforced concrete frame structure, with six entrances E and F, and the property entrance 1, 2, 3 and 4. In addition, turn to 1 line.
Among them, the E port is located on the east side of Shangbu Road, facing Nanyuan Road; Property 1 is located on the property floor, near Shangbu Building; 2 properties, 3 properties are located on the property floor, close to Ping An Bank; Port F is located on the west side of Shangbu Road, facing Nanyuan Road; Property 4 is located on the property floor, near Caesar Building.
The subway 10 line starts from Futian Port Station in Futian District.
Zhongzhi Longgang District Shuangyong Street Station
Passing through Futian, Longhua and Longgang districts.
The total length of the line is about 29 kilometers.
All underground laying is adopted.
* * * 24 stations (including 1 1 transfer station).
This time it was announced on the 10 line.
It is two sites in Futian area.
Maling station, Donggualing station
Maling station
『? Site information? 』
Fuling Station is located in Fuling District, Futian District. The station is laid along Caitian Road. The station is a four-story underground (three-story south) double-column three-span island transfer station. The station has seven entrances and exits: A 1, A2, A3, A4, B, C and D.
Among them, port A 1 is connected to Xinhao Du E; A2 is located in the green belt on the south side of the North Ring Road; A3 is located at one side of Caimei Interchange; A4 is located on the west side of Martyrs Cemetery; Port e is connected to Starko building; Port F is currently a temporary entrance and exit; Port D connects Guangdong Meilin Industrial Zone. (d) Entrance A1,A2 and A3 are under construction. )
Donggualing station
▲ Schematic diagram of entrance and exit distribution of Donggualing Station
『? Site information? 』
Donggualing Station is located near Tianwei Video Station in Futian District. The station is arranged in the north-south direction along Caitian Road planned by Futian. The station is a reinforced concrete box frame structure, and there is an island platform on the second floor underground. Station * * *: There are 7 entrances and exits in A, B, C and D, and 3 property entrances and exits (E, F and G).
Among them, a and b entrances are modern electronic plots; C the entrance and exit are close to the Rainbow Pavilion residential area; Entrance D is adjacent to the Great Wall Shi Sheng Home Community; The entrance and exit of Property E is close to Shenye Shangcheng plot; F the property entrance and exit is close to the plot of the Intermediate People's Court; The entrance and exit of Property G is near Tianwei Video Community. Among them, the entrances and exits of E, F and G properties are under construction.
Note: The material and content information of this article come from Shenzhen Metro.
This article comes from car home, the author of the car manufacturer, and does not represent car home's position.
- Previous article:What certificate can I take for a property without foundation?
- Next article:Wuhan cancels real estate differential tax
- Related articles
- Is there a legal basis for asking for supporting facilities fees when buying a house?
- What are the main items of second-hand housing transactions in Shenzhen Tiandi Building, and how to calculate the taxes and fees for new housing transactions?
- How about Shanghai Qunyue Paper Co., Ltd.?
- What is the telephone number of the sales office of Wanxing Arc de Triomphe in Lu 'an?
- Who will pay for the water change meter in the community?
- [Enrollment Scribing] 20 18 Scope of Scribing for Junior High Schools in Lianglu and Konggang New Town, Yubei District, Chongqing
- What is the quality of Fuzhou Weixing Phase III? Will it leak?
- Why is the customer service of the property company easy?
- How to apply for charging piles in Chengbei New Village, Tong 'an District, Xiamen without property or fixed parking spaces?
- How to calculate the transaction process of second-hand housing in Dongchuan Building, Guangzhou, and the transaction tax of new housing?