Job Recruitment Website - Property management - 5 summaries of personal work of maintenance workers.
5 summaries of personal work of maintenance workers.
Maintenance worker's personal work summary 1
Time flies, the sun and the moon fly, and it is the end of the year in a blink of an eye. As the old saying goes, taking copper as a mirror can make you well dressed, taking others as a mirror can make your words and deeds consistent, and taking history as a mirror can make you learn to rise and fall. In fact, the annual year-end summary is like a mirror. Through this mirror, we can see what achievements have been made in the past year, what mistakes have been made, what strengths have not been brought into play, and what shortcomings need to be corrected. Looking back on the work of the past year, we can also clear our minds and make clear our goals for the next year. The maintenance work in 20__ years is briefly summarized as follows:
With the joint efforts of everyone, the maintenance class in 20__ successfully completed the maintenance work throughout the year. On the whole, everything is safe and there are no accidents. But there are also many problems in the work. When workers operate the equipment, the brutal operation has caused great damage to the equipment itself. It is very important to improve the operator's understanding of equipment performance. In addition, the number of personnel and posts for important equipment shall be fixed, and the proficiency in equipment operation shall be enhanced. In this way, he can also maintain the equipment to a certain extent, which will reduce the loss of the equipment itself and reduce the maintenance cost.
The maintenance cost this year is much higher than last year for many reasons. Equipment renovation and lighting renovation in the old workshop are new expenses. There are still many cables that are aging and replaced. The high maintenance frequency of workshop crane is inevitable. Because the utilization rate of our workshop is too high, and some improper operations of workers in use have accelerated the aging and wear of cranes. Some problems were found when replacing the crane remote control handle this year. The worker threw the handle casually, even the accessories on it were lost, and they were not found. Now all five handles for changing the remote control in the workshop are broken. There are reasons for the equipment itself, but there are also some reasons that can't keep up with our usual operation and protection. The service life of crane accessories has a great relationship with our usual operation methods. Maintenance only deals with its pathological changes and cannot change its running state. The wear and tear of equipment in harsh environment is many times higher than usual.
We didn't do well in using special equipment. Non-dilution spraying equipment itself has high requirements for environment, painting, use and maintenance. Moreover, the damage caused by our environment and paint to the equipment has been very miserable. The maintenance cost of non-diluted spray equipment can already buy a new equipment. When painting again in the future, the important parts must be cleaned to avoid paint damage to the equipment. The daily maintenance of CNC drilling machine is not in place, which causes hydraulic waste and slider damage, resulting in the decline of equipment accuracy. The loss of all hydraulic parts in the workshop this year alone is an amazing figure. For equipment, we should have the machine cleaned. It is clean and quiet here. Turn off the power. Stop the no-load operation of the equipment.
The belt and guard plate of the sander are seriously worn, which leads to a certain cost of purchasing accessories and greatly increases the maintenance workload of the sander. During normal production, the product quality is affected, the rust removal is not clean, and the electricity fee is wasted. Broken maintenance takes a long time, delaying the next process. For the sander, it is necessary to train who will maintain it at ordinary times, and check the equipment before starting and after shutting down every day. See if there are any minor problems and solve them immediately. Don't wait until the broken one doesn't work properly, it's time-consuming and laborious.
The maintenance of welding machine is also a big problem. In the case of increasing output, this problem occurs almost every day, which has a great relationship with the quality of the equipment we buy and is not suitable for long-term continuous operation. The damage rate of a single welder module is high, and this component is also expensive. And the circuit board is seriously damaged. If the module is broken, it will damage the circuit board, so pay attention to the daily maintenance of the welding machine in the future. Do not thicken the dust on the welding machine. Wear, adhesion and short circuit of the welding handle wire will also cause damage to the welding machine circuit board, which should be avoided as much as possible in normal work.
Comrades in the maintenance class have worked hard for 20__ years! In order to ensure the normal production of the workshop, we have made painstaking efforts, and thank you for your cooperation. Without your support, we can't successfully complete the maintenance task. In 20__ years, we will make persistent efforts to do a good job in equipment maintenance and reduce equipment loss. For a better multi-dimensional tomorrow, we should do our work well. I hope everyone will have an enterprising heart in the new year! First of all, I wish you all a happy New Year!
Summary of personal work of maintenance workers II
Time flies and 20 years are coming to an end. First of all, I would like to thank the company for affirming my work and promoting me to be the property manager. During this year, under the correct guidance of the group company and project leaders, and with the close cooperation and unity of all departments, all tasks assigned by the company leaders were successfully completed, ensuring the safe operation of all equipment in the park. We have made some achievements and contributed to the completion of the company's quality objectives. In order to sum up experience and push the work in 20__ years to a new level, the year-end summary of property maintenance workers in 20__ years is as follows:
First, complete the daily work
1 and 20 * * years, about _ _ _ _ items of zero maintenance work were completed, including public * * * areas, owner maintenance and merchant maintenance. Get praise and recognition from owners and businesses.
2. Strengthen on-site management, supervise the construction of residential decoration units in accordance with the rules and regulations of the management office, without affecting the city appearance and safety management of the residential area, and construct the central air-conditioning and fire-fighting pipes of shops in accordance with technical specifications to ensure the normal operation of the central air-conditioning system and fire-fighting system.
In March and _ _ month, the post responsibilities and workflow were revised, and on this basis, the work records and equipment operation records were improved, and the post responsibilities were implemented.
4. Copy the water and electricity meter every month, and collect monthly water and electricity billing and management fees in cooperation with finance.
5, _ _ building fire escape reconstruction. The original ring lights and electronic ballasts cost about _ _ yuan, and the energy-saving lamps after transformation cost about _ _ yuan, and the number of transformation is about _ _.
6, _ _ building corridor lighting renovation. The cost of the original _ _ integrated exhaust lamp is about _ _ yuan, and the cost of the energy-saving lamp after transformation is about _ _ yuan, and the number of transformation is _ _.
7, _ _ negative layer pump noise treatment. The vibration and noise in the use of domestic water pump house make many owners in Building A complain that the noise of water pump seriously affects their quality of life. This problem has been solved through the transformation of the environmental protection bureau and the construction unit.
8. During the thunderstorm, timely dredge the garbage in the open ditch pipeline in residential areas, and do a good job in flood drainage and flood control.
Second, the building renovation
According to the company's deployment, with the consent of the group company, the engineering department successfully completed all the construction tasks assigned by the company, saving costs for the company.
1, _ Building Safety Management Department, Engineering Department office decoration.
2. Pour cement on the pavement at the entrance of the underground garage.
3. Laying barrier-free access at the entrance of the sightseeing elevator hall.
4. The green belt in front of the shops in the building has been paved with blue bricks.
Third, the maintenance of equipment and facilities.
At present, the overall situation of community equipment maintenance is still there. All equipment is maintained according to the equipment maintenance instructions, and daily inspection is carried out, and it is in good working condition at present.
1. Complete the operation, maintenance and cleaning of the equipment in the core power distribution room of the building in strict accordance with the requirements of the operation and maintenance specifications of the power distribution system and with reference to the annual work plan. At the same time, the bus duct in the distribution pipeline shaft of each floor should be maintained regularly.
2. Update of elevator inspection method. In view of the frequent elevator accidents, this paper analyzes and summarizes the phenomena not found in the inspection by the engineering department, and improves and perfects the original inspection method. Strengthen the inspection of elevator comfort, stability and noise, and observe the operation of car roof and pit. Supervise the maintenance unit to improve the maintenance level and eliminate hidden dangers.
3. Maintenance of central air conditioning equipment, monthly cleaning of ceiling cooling tower and chilled water pipeline. Investigate _ _ coil fans in _ _ stores every month, and repair _ _ coil air ducts with different problems. In, derusting and painting were carried out on the cooling water pipes in the machine room and ceiling, which improved the safe operation performance of the equipment and ensured the normal supply of refrigeration in summer.
4. The generator should be maintained once a month. During maintenance, it should be turned on for _ _ minutes to ensure rapid power generation in case of power failure.
5. Check the domestic water pump house _ times every day to ensure the safe operation of the equipment and create a good living environment for the owner.
6. Maintenance of weak current equipment, comprehensively clean up weak current tube wells in the building, and cooperate with telecom, China Mobile, China Unicom and other companies for equipment installation, repair and maintenance.
Summary of personal work of maintenance workers 3
The work of the equipment department was completed in 20__. Looking back on the new year, the Equipment Department has fully implemented the company's policy of TS 16949 to improve management, knowledge and professional ability. Under the guidance of the annual goal of "increasing output, reducing defects and saving costs" of the Manufacturing Department, the equipment management work put forward in the work deployment has been earnestly implemented and efforts have been made. Looking at the 20-year work of the Equipment Department, with the support of leaders at all levels and the cooperation of other departments, the tasks assigned by the company have been well completed. This year, with the increase of new equipment and the redistribution of departmental work, many special projects are involved in 1 1, and many difficulties have been encountered in practical work, but there are also some problems. However, all the staff of the equipment management department learn from the problems that arise through careful summary and analysis, exercise their abilities in difficulties, improve themselves in reflection, stress principles on major issues and style on minor issues. In the past 20 years, the usage of machine gold thread in Kenzo brand of Equipment Department has decreased by 3%, and the cost has been reduced by about 2 million yuan every year. Reduce equipment failure rate and improve equipment operation rate. At present, there is zero stock of welding wire.
First, save costs.
1. Disassemble and repair damaged and expensive parts, so as to make the maintenance work meticulous to the parts, narrow the fault range, maintain the equipment at the lowest maintenance cost, and avoid directly replacing new parts.
2. Reduce the number of external repairs of equipment and increase the intensity of internal repairs.
Second, reduce bad ones.
1. Control the quality abnormality in production, analyze it in time, find out the solution, and avoid the same mistake from happening again.
2. Authentication of internal parameters of equipment.
3. Maintain and control, organize the overhaul of high-fault equipment, and reduce the bad production caused by equipment failure.
Third, increase production.
1, inspect the line in time, and handle the problems in time when found.
2. Make equipment maintenance plan, arrange and implement equipment maintenance work, ensure equipment performance by changing maintenance frequency, reduce machine failure and downtime, and ensure normal production and operation of the machine.
Fourth, employee mobility.
The Equipment Department has ***7 welding wires this year, of which the welding wire is white. There are 2 night shift technicians, 3 maintenance personnel and 2 newly promoted personnel, and the personnel are stable, successfully completing the 20__ target set by the company for the equipment department.
Verb (abbreviation of verb) team building
1, we constantly educate employees through the actual situation encountered in our work, and formulate corresponding countermeasures and treatment methods, systematically train new employees, give lectures by special personnel, and conduct practical drills at work at the same time, so that every employee can realize the importance of improving technical quality. At the same time, strengthen the cultivation of employees' collective sense of honor, improve employees' mutual cooperation ability, and make the organization more United and more fighting.
2. Be responsible for the daily maintenance of the welding machine, and assign special personnel to regularly confirm the usage of the equipment to ensure the normal operation of other equipment in daily production; And be responsible for the confirmation of special products (processing machinery parts, samples, sizes), and actively and flexibly participate in equipment repair as the main maintenance force when organizing equipment overhaul.
Six, shortcomings in the work
1, not active enough when dealing with work that is not in his charge. The reason is that I am afraid of overstepping my authority and offside, and sometimes I don't take the initiative to put forward my own work ideas, which leads to a slow pace of work.
I don't learn new things enough. I often do things by experience in my work and deal with problems with previous work routines, which shows that bold innovation in my work is not enough.
3. The team management is not meticulous enough, and the employees' awareness of safety and quality is not strong enough, which leads to safety accidents 1 this year. Although the parties were educated and dealt with afterwards, corresponding countermeasures were also made. However, it is necessary to give priority to prevention, increase the usual education, improve the safety awareness of employees, and fundamentally reduce the occurrence of hidden dangers of safety accidents.
4. The spare parts inventory and on-hand quantity of common equipment parts are not confirmed enough. We should strengthen our own learning and communicate with management personnel to ensure the replacement of spare parts in equipment maintenance and reduce the time of production delay.
Seven. abstract
We will overcome the above shortcomings through continuous learning, strive to improve our working ability and level, improve ourselves, contribute to the development of the company's cause with full enthusiasm and full enthusiasm, and contribute to the equipment management of the company's fixed assets. Looking forward to 20__ years, the main work focus is to ensure the good momentum of normal operation of equipment in 20__ years, and at the same time strengthen the management and construction of the department, so that the management and work of the equipment department can be upgraded.
Summary of personal work of maintenance workers 4
How time flies! It has been nearly half a year since I turned away from the power distribution room in a blink of an eye. Over the past six months, with the correct leadership and care support of the factory department and various departments, I have been working hard and learning new knowledge with a positive working attitude and enthusiastic service spirit. I have done some tangible things for electromechanical groups and departments and achieved certain results. But there are still some shortcomings, which need to be improved. The related work in the past six months is summarized as follows:
I. Work content
My work is roughly divided into mechanical and electrical group work and equipment department work.
Electromechanical group work:
1, organize team members to do a good job of inspection, maintenance and repair of workshop equipment;
2. Participate in patrol inspection and key maintenance work;
3. Responsible for on-site specification and management of electromechanical group and distribution room.
Department work:
1. Safety work: fill in safety inspection records, safety rectification records, monthly safety reports and quarterly safety reports;
2. Quality work: sorting out and maintaining equipment files; Collect and sort out the operation records of ice maker, boiler, power transformation and distribution, equipment oil consumption records and workshop equipment maintenance records; Statistics of equipment integrity rate and efficiency of monitoring and measuring devices;
3, complete other work arranged by the leadership.
Second, the main achievements
1. The placement of personal items, such as teacups and work shoes, is standardized in the electromechanical group.
2, public tools, spare parts and materials should be arranged by special personnel;
3. Organize members of electromechanical group to complete the inspection, maintenance and repair of workshop equipment in time, so as to ensure the normal operation of workshop production equipment;
4. Organize teams and groups to participate in the installation, pay-off, wiring and debugging of new equipment in the workshop in hot summer, so as to prepare for the early production of new equipment;
5. Participate in the local maintenance of energy group equipment to ensure the operation of energy equipment;
6. When the liquid level control system of q 10 machine failed, the liquid level control system of Q10 machine was reformed and the original liquid level controller was repaired. After the liquid level is controlled by the original controller, it runs normally and there is no abnormality so far.
7. Participate in the installation of electrical parts for the transformation of homogeneous cooling water system in pretreatment section;
8. Participate in the installation and debugging of electrical and pneumatic components in the system transformation of cip central station;
9, complete the change of workshop equipment inspection table, increase the intensity of equipment inspection;
10, various records and reports of safety work;
1 1, maintain equipment files and collect equipment operation, equipment oil and workshop maintenance records; Do a good job in the statistics of equipment integrity rate and efficiency of monitoring and measuring devices.
Third, experience
1, improve professional skills in a down-to-earth manner.
As a technician, professional and technical level is fundamental. There is no end to learning technology, and we should carry forward the spirit of hard work and hard work. We should not only learn theoretical knowledge from books, but also explore and accumulate in practice in combination with reality. At the same time, we should also consult modestly and master all kinds of relevant professional knowledge.
2. Study hard and improve management ability.
For me who just engaged in the management of electromechanical group, everything I face is brand-new and full of challenges. I need to enrich myself. In my spare time, I often read some books related to management, or look up some management information and previous management experience on the Internet. It is most important to apply these management knowledge to my work, otherwise it is "an armchair strategist". I have done enough in this respect, and I need to work harder.
Pay attention to thinking, sometimes encounter the same problem, some people handle it properly, and some people handle it hastily. As a manager, to form the habit of being diligent in thinking is to be diligent in thinking when encountering problems at ordinary times and lead the team to solve problems with new solutions.
At the same time, we should communicate with the staff in the class regularly and encourage members to put forward their own views and problems in the department. In order to improve in time!
3. Pay attention to details and grow up gradually.
In the work, any minor mistake may lead to the failure of the whole work. So we should pay attention to every link and do it meticulously. Learn to record everything, every important link, and provide materials and basis for future study and review.
Four. Existing problems and deficiencies
1, sometimes a little careless and careless;
2. Insufficient professional and technical research;
3. Insufficient organization and management.
In view of the above problems, in the future work, we should overcome carelessness, strengthen the study of professional technology and skills, and strive for greater progress. At the same time, we should strengthen the application of management knowledge in our work, give full play to the strength of the team, and make our work by going up one flight of stairs.
In short, half a year's work, there are achievements and shortcomings, joy and bitterness, but harvest is the theme. Although I didn't do anything earth-shattering, I reflected the meaning of work and the value of life in every little thing. In order to exercise myself and grow into a useful person. In the future work, I will work harder, constantly improve myself and improve myself.
Summary of personal work of maintenance workers 5
In the busy work, 20 years passed quickly. In a year's time, with the care and help of leaders and colleagues, I have given full play to my work skills, and my work and business level have made great progress through my continuous efforts. Continuously improve working methods and improve work efficiency. Summarize the past and learn good work experience. Below I will make a summary of all the work in 20__ years.
1, working conditions
Our main job is to cooperate with maintenance, emergency rescue, spare parts collection, or garbage, scrap steel and old spare parts left by on-site production and maintenance. Can complete the tasks assigned by the leader, check spare parts quickly and safely, and clean up. Sometimes equipment maintenance can actively cooperate with maintenance work. When the equipment maintenance is busy, most of them are fighting in the workplace for more than 14 hours a day. Because the car use plan is not standardized and the demand is tight, they have to run back and forth in the workshop hundreds of times every day, sometimes it takes a long time to fix it, and they can't rest after working overtime. In addition, my car is noisy, the cab temperature is high and the heat dissipation is poor, so the whole person is like taking a bath. Moreover, under the working environment of narrow road surface and poor road conditions in our workshop, we all have no complaints, can treat them correctly, work hard and complete various tasks seriously.
2. Security aspects
At work, we can be strict with ourselves, consciously abide by labor discipline and safety operation rules, study traffic regulations seriously, and strictly abide by traffic regulations and factory rules and regulations. Earnestly complete their own work, so as to achieve the safety production policy of sounding the alarm, putting safety first and putting prevention first. It plays a preventive role. There was no violation of discipline and discipline and no liability accident in the whole year. Under the condition of ensuring driving safety, we have achieved: study hard and constantly improve safety quality. As a driver, when the motor rings, I concentrate and turn the steering wheel, I try my best to ensure safety. Although the driver's job is monotonous, he needs a strong sense of responsibility and cannot be careless when driving. He should concentrate on driving a good car, always want to be safe, prevent accidents everywhere and be safe.
3. Respect discipline and discipline
Strictly abide by the rules and regulations formulated by the company, do not fight, steal, do anything that will damage the corporate image, respect leaders, unite colleagues and work hard. Concentrate on work, do not violate labor discipline and factory rules and regulations, take the factory as the master and safeguard the interests of enterprises.
4. Main problems and next steps.
I. Main problems
1, lack of serious work, lack of initiative, and little understanding of unsafe factors in the workshop.
2. Due to the poor road conditions, narrow roads and many intersections in our workshop, there are overspeed behaviors caused by unsafe factors.
3, vehicle maintenance, maintenance, repair and other work is not in place.
Second, the next step.
1. In the new year, we will face the production of two engines, which is twice as busy as this year. Then we must do our job well, do not overspeed, overload and other illegal acts, ensure safe production, and strengthen the maintenance, inspection, repair and maintenance of vehicles. Only good maintenance can ensure safe driving. Provide favorable conditions for production and maintenance.
In the new year, we should study traffic laws and regulations harder and strengthen our safety awareness. We should correct our shortcomings, unite as one, do our own work well, strive to better complete the tasks assigned to us, and strive for a higher level of military work.
Summarize 5 articles about personal work of maintenance workers:
★ The personal work summary of the maintenance worker is 5 articles 202 1
★ Summary of personal work of repairman
★ Personal Annual Work Summary of Maintenance Workers in 2020
★ Five personal work summaries of equipment maintenance
★ Maintenance worker's annual work summary model essay 5 2020
★ Personal year-end summary of maintenance workers in 2020 with 5 essays.
Taken the annual work summary of 5 articles, 2020 equipment maintenance man.
★ Summary of personal maintenance work in the first half of the year
★ Personal summary of property maintenance worker
★ 2020 Maintenance Team Personal Annual Work Summary 5 Selected Articles
- Related articles
- Qingyuan Oriental Yaju is a middle school district.
- City-Advanced Standard of Property Management
- On New Year's Day, how many days off does the state stipulate?
- How about the second-hand house in Daqing Hu Ming Garden?
- How much does it cost to travel from Jilin to Yunnan 10 day?
- Delivery time of Huangpu home in Kunshan
- Who knows the details of Huatian Holiday Hotel in Futian District, Shenzhen?
- What do Yucheng and Garden stand for respectively?
- How to deal with unreasonable water charges in property?
- Where is the capital of Ruzhou Park?