Job Recruitment Website - Property management - Real estate meeting minutes model essay?
Real estate meeting minutes model essay?
1
Time: 20xx65438+1October 3 1 9: 45 a.m.
Venue: Conference Room of Headquarters
Moderator: Yang Shuan.
Participants: relevant personnel from leading bodies, engineering department, bidding and budget department, sales department, Party and Government Office, environmental safety department and other departments.
Name of meeting: General Manager's Office Meeting
Content:
20xx At 9: 45 a.m. on March 3 1, Yunnan Chengjiang Natural Landscape Real Estate Development Co., Ltd. held a general manager's office meeting in the conference room of the project headquarters. The meeting was presided over by Yang Shuan, general manager of the company, and attended by the company's leading bodies and relevant personnel from various departments. Suggestions can be deleted.
Yang Shuan, general manager of 1. summarized and reviewed the preliminary work of Yang Zonghai's project, and made arrangements for the recent work.
Yang Shuan, the general manager of the company, first emphasized that the Party Committee of the Bureau attached great importance to Yang Zonghai's project and was full of expectations, giving strong support to the company in terms of manpower, material resources and financial resources. The whole project is related to the success or failure of global strategic investment. The whole company should change its mind, change its concept, unite as one, work hard and complete the whole project with high efficiency and high quality.
In view of the unreasonable design of the apartment and the potential safety hazards in the construction process, General Manager Yang Shuan put forward the following three requirements:
First, we should be market-oriented, based on customer needs, based on programs and premise planning. We should make full use of our own advantages, make on-the-spot investigation and elaborate high-quality planning, and build a high-grade garden residential community built on the mountain, which is patchwork and ups and downs. First, it is necessary to change the apartment, form the main apartment, and press the 5 19 square meter apartment to 400 square meters. The second is to adjust the large terrace to make it as close to the sea as possible. Third, we should carefully choose a model house. The fourth is to analyze the seascape, and the viewing area should reach 60% and try to reach 80%. If it can't meet the requirements, change the design unit. Fifth, it is necessary to adjust the apartment type and height difference, and complete all apartment type adjustments within 15 days. This work is led by Deputy General Manager Xin Li, supported by Chief Engineer Zhang and coordinated by Deputy Chief Engineer Jilin, Li Ju. Sixth, the sixth group added two houses and cancelled one house in the first group garden. Seventh, only carry out environmental soil and water conservation projects and stop all earthwork projects.
Strictly implement the division of labor responsibility system. First, the formation of the model area and the main road should be completed within the specified time. Li Jinxing, the executive deputy general manager, is responsible for this work, and Chen Jianmin is responsible for the design. Second, Li Jinxing, the executive deputy general manager, is responsible for completing all the greening parts, and Xin Li, the deputy general manager, and Jilin, the deputy chief engineer, are responsible for providing the basis for the collocation of flowers and plants. Please ask the greening unit to send relevant personnel to the project site for investigation. Three, under the premise of no environmental pressure, complete 100 meters of cup foot greening. The fourth is to improve the clods of basic farmland, and the four groups and other groups can be carried out separately. Fifth, He Jianhua, deputy general manager, is responsible for environmental protection.
Third, plug the loopholes in quality supervision and tracking management. On March 22nd, the concealed work of No.3 dam was not grouted, and there were no managers and supervisors on site. If there is any similar situation in the future, the construction unit will be fined 654.38+10,000 yuan, and the engineering department will be fined 50,000 yuan.
Second, other members of the company's leadership team and the heads of relevant departments discussed and spoke, and reached an agreement on * * * and made a statement:
First, we should deeply reflect on the problems existing in the previous work and find the source.
Second, we should fully realize the decisive role of design planning in the whole project, sum up experience, learn lessons, take customer demand as the ultimate starting point, formulate forward-looking and long-term design planning, create good project quality, and lay a good foundation for sales work.
Third, it is necessary to strengthen the horizontal communication between various departments within the company and the communication with design and construction units.
Fourth, raise awareness of quality and environmental protection issues, strengthen supervision and management, and form a target responsibility system. He Jianhua, deputy general manager of the company, is in charge, and the Ministry of Environmental Protection cooperates with various supervision construction units to complete all environmental protection and water conservation work before the rainy season.
Three. Yang Shuan, general manager of the company, arranged and deployed the recent work.
On April 5, 20xx, 1, members of the company's leadership team went to the planning and design institute to listen to the design report, and clearly put forward the proportion of apartment types according to the site conditions.
2. Within the earthwork bid section, the earthwork construction unit can leave after consultation.
3. Minutes of all environmental protection meetings shall be made, which shall be well documented.
4. Give priority to landscape greening and give way to housing construction, and complete 100m landscape avenue as soon as possible, and complete it before May 15.
5. For the decoration of the model house, invite a design company from Hong Kong or Shenzhen to design and decorate it according to the minimum standard of 5,000 yuan per square meter.
6. Complete the clubhouse construction before the end of July, decorate the lobby and bathroom with exquisite works, and complete the bidding for all residential buildings before the end of August.
2
Minutes of the meeting of XX Real Estate Co., Ltd. X [[〔XXXX〕] No.X.
XX real estate engineering construction
Minutes of XX month work arrangement meeting
At 2: 30 pm on XX, XX, the general consultant of XX Real Estate Investment Co., Ltd. presided over the XX work summary and XX work arrangement meeting in XX conference room, and General Manager Li made an important speech at the meeting. The matters agreed at the meeting are summarized as follows:
1. The sewage treatment project is declared with Zhonghe New Town as the carrier.
Second, the General Department took the lead in coming up with the personnel composition and work plan of the Supervision Department to prevent the wage arrears of migrant workers, and determined the number of required personnel and specific work processes as soon as possible.
Three, the comprehensive department, the project office to declare all kinds of project funds should focus on doing a good job, so as to strive for funds.
Four, the road should be completed and accepted. The General Department takes the lead and Gong Li is in charge.
Five, the determination of secondary school teaching materials, released by the technical procurement department.
Six, the service center exterior wall coating need to determine the brand.
Seven, the progress of middle school construction should still be placed in the first place of all project management. All departments should work together.
Eight, XX district building coatings along the street to increase the construction team to speed up the construction.
9. The windows in 9.XX area are installed by Party A ... The stair railings are stainless steel, and the technical procurement department will inform the construction unit after making an inquiry.
Ten, the school elevator is not installed temporarily, and the project is completed.
Eleven, south of the city industrial zone low-cost housing projects, the original change and demolition need to apply for a visa. Vigorously promote new projects and lay a solid foundation.
Twelve, service center, middle school electric power team should seize the time to build.
Thirteen, underground water source heat pump, natural gas construction team on Monday, Unicom mobile construction team as soon as possible to determine.
Fourteen, XX road dug up the excess earthwork away, XX road on the east side of the earthwork leveling height on the basis of pavement leveling.
15, the engineering department reported the shutdown of the construction team, and the contract was terminated due to serious problems. The treatment measures determined by each construction team shall be notified in writing.
Sixteen, middle school equipment by the city and county education bureau is responsible for. Middle school construction projects must be completed XX years ago. The engineering department should reverse the construction period to prevent the disaster weather from affecting the construction period.
Seventeen, the southern district accounts by the Wang Wenhao General Office is responsible for urging Zhengzhou to bid. Final account method: give a standard base price for the same building. If the construction unit has any objection, it can review the budget. After the standard is issued, hold a meeting with the construction unit to inform the price.
Eighteen, XX area was originally scheduled to be delivered at the end of XX, and now the house has been sold, and the project construction must be completed ahead of schedule.
19, the road should be clean and tidy, and the leader should check the route with image, and try not to pile up materials.
Twenty, property management owners reflect the problem to timely maintenance. The existing problems should be signed by the construction team and the engineering department for confirmation. Clear maintenance time limit.
Twenty-one, I hope everyone will work actively, actively and consciously. Do a good job and bring the team of your own department.
Twenty-two, require all departments to seriously implement the October work plan.
List of participants
join
XXX、XXX、XXX、XXX、XXX、XXX、XXX、XXX、XXX、XXX、XXX、XXX、XXX、XXX、XXX、XXX、XXX
This issue: Office of General Manager of XX Group
F: All departments of the company.
Issued by XX Real Estate Investment Co., Ltd. on XX, XX, XX.
Recording: XXX proofreading: XXX *** printing 15 volumes.
three
Time: XXXX, xx, xx, xx, xx.
Venue: XXXX Project Department
Moderator: XXX
Attendance: XXX, XXX, XXX, XXX
Content:
I. Last week's completion:
1. Sales office: piling construction will be completed on XX day, and static load test will be completed on XX day. XX month XX day to complete the withdrawal of pile drivers and concrete block detection, complete the field elevation grid survey, and complete the handover of the site to the general contractor. Construction of overlay cushion began. On XX, XX, XX, the general contractor should start foundation construction as planned, but the earth-digging equipment and materials did not enter the site and the construction personnel did not break ground.
2. Plot XX: The earthwork excavation of Building XX and Building XX started in XX, but the progress was slow due to the unloading area, insufficient investment in excavator equipment and lack of survey technicians on site.
3. Others: The construction of enclosure foundation of XX and XX plots has been completed.
Second, this week's planned work:
1. sales office: earthwork excavation, pile cutting, small strain detection pile cap, ground beam cushion, pile core concrete and setting-out of the sales office will be completed before XX.
2.XX plot: XX completed the earthwork construction of 1# building, XX started the pilot hole construction, and XXXX φ 500 piles. The earthwork construction of X# building will be completed on XX, and the cushion construction will be completed before XX.
3. Others: Start enclosure construction.
Three. Problems that the company needs to solve as soon as possible:
1. Provide the paper version of the construction blueprint of the sales office and model room as soon as possible.
2. Provide the blueprint for earthwork excavation and support of XX plot as soon as possible.
3. Draw the construction blueprint of XX plot as soon as possible.
4, sales offices and XX plot planning control points.
5. Contact the water supply company and cooperate with the temporary water use.
6, the construction unit of the construction contract.
XX real estate group XX real estate co., ltd.
- Related articles
- Is the Red Star Haiyuan Villa floor heating?
- Ye Wei Xingcheng, OK?
- Application conditions for public rental housing subsidies in Hangzhou
- Where is Changshu Zhongnan Lin Yue School District?
- How about the International Port Building? OK or not? Is it worth buying?
- Will Nanzhang Huazhong Green Valley continue to recruit people?
- 2010165438+1October 15 A fire broke out in a 28-story teacher apartment in Jiaodong Road, Shanghai, killing 58 people. The cause of the accident was that the workers violated the rules and ignited spa
- How about Guangzhou Yingqiao Property Management Co., Ltd.
- Has Country Garden Property stopped paying wages?
- How to protect property rights