Today, we will turn our attention to the urban renewal of Kuiwen District, and the details of 12 are coming.

Based on reality and focusing on the future, Kuiwen District has finally identified 12 renewal areas, including Japanese schools, people's hospitals and talent technology towns. According to the requirements of demolition and construction ratio, the messy garage, furniture market and flea market in the central area will be relocated from south to north, and more than 6,000 mu of land will be vacated by integration and upgrading.

Planning programming

In order to keep the planning in place, Kuiwen District has hired advanced domestic planning and design teams such as China Urban Planning and Design Institute and China Architectural Design and Research Institute to carry out space planning, regional positioning, industrial layout and public facilities design one by one with the concept of overall renewal and system renewal, so that every inch of land can play a greater role in value and social function.

At present, the conceptual planning of 12 area has been initially completed, and China Architectural Design and Research Institute has completed the design of Shangshang School District, Rural Commercial Bank School District and Weifang Middle School District. Relying on the renewal of the district, Kuiwen District strives to realize the sustained release of development space within 2-4 years.

Aerial view of urban renewal project in Taihua area

developmental pattern

In the development mode, for areas that need to be updated, all areas that are close to and connected should be developed in blocks, so as to avoid "scattered plots that are easy to dismantle bloom at many points, and the surrounding plots that are difficult to dismantle are left to the future". At the same time, take state-owned enterprises as the main body of development and construction in the whole region, avoid "long development and construction period and slow speed caused by factors such as enterprise strength and willingness", and ensure the accelerated implementation of urban renewal strategy.

Regional renderings of Beijing Opera Troupe

Expropriation and relocation work

The land requisition and relocation work should be planned as a whole, and promoted step by step, so as to achieve one land and one harvest, and strive to complete the land requisition and relocation work in the region in 2-4 years to prevent the risks brought by "shouting" and "fully spreading".

This year, Kuiwen District started the relocation of 12 large areas. At present, 600 mu of land has been demolished in People's Hospital District and Zhuang Jia Industrial Park, and other areas are also being demolished one after another.

In the first quarter, hengfeng bank Weifang Branch Chengtou Group granted a credit of 210.60 billion yuan to the school district housing project, with a total loan of 800 million yuan. On July 7th, Weifang Bank Area was successfully granted a credit of RMB 800 million from China Bank.

Details of twelve large areas

Xiangri campus

Location: to the east of Beihai Road, to the west of Wenhua Road, to the south of the river and to the north of Minsheng Street.

Idle land: 880.3 mu

Construction orientation: education, culture and business complex

The ratio of industrial land to residential land is 4:6.

Plots on both sides of Xinhua Jiaxiang: covering an area of 476 mu, with a total construction area of 294,886 ㎡.

Xinhua Road Liquor Wholesale Market plot: covers an area of 256. 1 mu, with a total construction area of12044m2.

Kindergarten plot directly under the municipal government: covers an area of17mu, with a total construction area of 4,475m2.

Nanxiahe market plot: covers an area of 13 1.2 mu, with a total construction area of 46,700 ㎡.

People's hospital area

Location: Yu He River in the east, Qian Ying Street in the south, Weizhou Road in the west and Minsheng Street in the north.

Idle land: 1574.78 mu

Construction direction: real estate, medical care

The ratio of industrial land to residential land is 4:6.

Land for bearing factory: covering an area of 25 mu, with a total construction area of 23,776.02 ㎡.

Dormitory area of traditional Chinese medicine hospital: covers an area of 53.2 mu, with a total construction area of 5 1, 328,438+0 ㎡.

Nanle Road South Block: covers an area of 92.3 mu, with a total construction area of 6 1, 307.86 ㎡.

Sakura North Second Floor Plot: covers an area of 290 mu, with a total construction area of 176283.66㎡.

Power plant dormitory area: covers an area of 229.9 mu, with a total construction area of 122873.9㎡.

Xingfu Street plot: covers an area of 527.38 mu, with a total construction area of 466,900 square meters.

South of Jiankang Street and west of Yuan Fei Road: covering an area of 357 mu, with a total construction area of 207,000 square meters.

Nong shop qu

Location: west of Beihai Road, east of Xinhua Road, north of Dongfeng Street and south of Fushou Street.

Idle land: 330 mu

Construction orientation: real estate, high-end services

The ratio of industrial land to residential land is 4:6.

Updated area 1No.: covers an area of 9.42 mu, with a building area of 84 1 1㎡.

The second renewal area: covers an area of 253 mu, with a building area of 268,700 square meters.

Third Third New District: covers an area of 79 mu with a building area of 47,580 ㎡.

Weifang high school bu

Location: Yu He River in the east, Bailang River in the west, Gongbei East Street in the north and Dongfeng Street in the south.

Vacant land: 980.7 1 mu.

Construction direction: real estate, education and culture.

The ratio of industrial land to residential land is 4:6.

Electronic street plot, Weiwan plot, Gongfu street plot, Xinhua plot, Middle School street plot.

Beijing Opera Troupe District

Location: North of Minsheng Street, west of Yu He Road, east of Bailang River and south of Dongfeng East Street.

Vacant land: 705.27 mu.

Construction direction: real estate, finance, business office, cultural tourism.

The ratio of industrial land to residential land is 4:6.

Kuiwenmen plot, Zhongheyuan plot, Xueyuan street plot and Minsheng street plot.

Relay station area

Location: Xinhua Road in the east, Dongfeng Street in the south, Wenhua Road in the west and Qing Yu Street in the north.

Idle land: 298 mu

Construction direction: real estate, finance, business office, cultural tourism.

The ratio of industrial land to residential land is 4:6.

Wolong Street is unblocked, the Academy of Agricultural Sciences, the original well drilling team, Weifang Road Construction Machinery Factory and the relay station area.

Affiliated hospital area

Location: Dongfang Wenhua Road, Dongfeng Street in the south, Yuan Fei Road in the west and Wolong Street in the north.

Idle land: 233 mu

Construction direction: real estate, medical care

The ratio of industrial land to residential land is 4:6.

The plot to the north of Beiyu Village covers an area of 39.6 mu, involving ① 17 houses with 534 households; ② Datuo Hospital has an office building 1, a dormitory building 1, a second floor 1, 42 bungalows and 6 gatehouses. The building area is about 42,498 ㎡.

Reconstruction of the village in Beiyu Village: It covers an area of about 77 mu, with 2 residential buildings, 13 rows of bungalows and 225 households.

Sheet Metal Factory: Covering an area of about 43 mu, there are 4 residential buildings with 65,438 households and 4 units, with a building area of about 1, 965,438+0,965,438+0 ㎡.

Zhongjie plot: covers an area of about 60 mu, with 38 houses, bungalows 12 rows and 739 households, with a construction area of about 45,899 ㎡.

Huafeng residential plot: it covers an area of about 10 mu, with 4 residential buildings and 134 households, with a construction area of about 8400㎡.

Bus stop area

Location: East of Bailang River, west of Weizhou Road, south of Minsheng Street and north of Ji Jiao Railway.

Idle land: 833 mu

Construction direction: real estate, modern commerce, intelligent (cold chain) logistics.

The ratio of industrial land to residential land is 3:7.

Xinghe project area: covers an area of 120 mu.

Wei Chai old factory: covers an area of 530 mu.

Crossing the project area: covering an area of 430 mu.

Huangjia Project Area: covers an area of 2 18 mu.

Talent science and technology innovation town plate

Location: North of Gong Bei Street, south of Yin Qing Expressway, west of Yu He River and east of Bailang River.

Idle land: 2 12 1 mu.

Construction orientation: intelligent building, science and technology innovation center, garden club and dynamic business circle.

The ratio of industrial land to residential land is 3:7.

The plot of Ruiyuan Project in Juntai City covers an area of 2 13.79 mu, with a total construction area of about 294,800 ㎡.

Juntai Business Center Project Plot: It covers an area of 79 13 mu, with a total construction area of about 192700㎡.

Juntai Garden Phase II project plot: covers an area of 29 mu, with a total construction area of about 78,900 ㎡.

Plot of Gas Company: covers an area of 28 mu, with a total construction area of 65,000 ㎡.

Wolong residential area: covers an area of 188 mu, with a total construction area of 360,000 square meters.

Supply and marketing cooperative dormitory plot: it covers an area of 6 1.93 mu, with a total construction area of 1.5 million ㎡.

Juntai Plaza Project Plot: It covers an area of 3 16.28 mu, with a total construction area of 744,200 ㎡.

Weifang High-level Talents Science Park Project Plot: covers an area of 555 mu, with a total construction area of 500,000 square meters.

Dingjiaxinyuan Community covers an area of 98 mu with a total construction area of 247,500 ㎡.

Land along Weizhou Road: covers an area of 33 mu, with a total construction area of 62,000m2.

Hongyang Times Fenghua Project plot: covers an area of 239 mu, with a total construction area of 489,000 ㎡.

The plot of Juntairuiyuan Pension Apartment Project: covers an area of 57 15 mu, with a total construction area of133,000m2.

The project plot of Zhierzhuang Comprehensive Industrial Cluster Area covers an area of 38 mu, with a total construction area of 1 1.9 million ㎡.

Plot of Wei Chai Luyitz Factory: it covers an area of 187 mu, with a total construction area of 394,500 ㎡.

Zhuang Jia industrial park

Location: East of Yuan Fei Road, south of Sakura Street, west of Wenhua Road and north of Bao Tong Street.

Idle land: 924.4 mu

Construction direction: real estate, modern commerce, intelligent (cold chain) logistics.

The ratio of industrial land to residential land is 4:6.

West camp block: covers an area of 402.4 mu, with a building area of 28,066 ㎡.

Sakura Garden plot: covers an area of 282 mu, with a building area of 238,035 ㎡.

Zhuang Jia Industrial Park plot: covers an area of 240 mu, with a building area of 57,000m2.

Wangsan Yima Section

Location: East of Bailang River, west of Yuan Fei Road, south of Ji Jiao Railway and north of Bao Tong Street.

Idle land: 724.6 mu

Construction direction: real estate, modern commerce, intelligent (cold chain) logistics.

The ratio of industrial land to residential land is 4:6.

West King, North King, Ma Shaoye.

1532 industrial park section

Location: West of Yu He River, north of Fenghuang Street, east of Weizhou Road and south of Bao Tong Street.

Idle land: 936 mu

Construction direction: real estate, cultural tourism and urban leisure.