Job Recruitment Website - Property management - When will the floor room in Zhaoxiang Town, Qingpu District be demolished?

When will the floor room in Zhaoxiang Town, Qingpu District be demolished?

In 2023.

In June, 20021year, our bureau and Qingpu Housing Management Co., Ltd. conducted in-depth discussions on the preparation of special renovation plans for disabled workers' housing and thin-walled beam housing in this area. Through on-the-spot investigation, combined with the conditions such as the property of the house, the safety level and the opinions of the local towns, this paper makes a preliminary judgment on various ways of house reconstruction, including internal separation, expansion and reconstruction, demolition and reconstruction, sporadic expropriation and household withdrawal. Initially define the total amount of renovation and the needs of resettlement households. 202 1, 1 1, compiled and completed the special renovation plan for disabled workers' housing and thin-plate housing in Liang Xiao.

It is planned to start construction in 2022 15 sets, with a construction area of 0.84 million square meters, mainly distributed in huaxin town and Zhujiajiao town. The transformation methods are mainly village-in-city transformation and replacement expropriation. It is planned to start construction in 2023 18 sets, with a construction area of 1.27 million square meters, mainly distributed in Zhaoxiang Town and Yingpu Street. The transformation methods are mainly urban village transformation and urban renewal of the old city (Jiangnan Xintiandi). It is planned to start construction in 2024 16 houses, with a construction area of 2 1800 square meters, mainly distributed in Li Antang town, and the main transformation methods are pasting, expansion and transformation (16 houses are plots, and the transformation funds are from the district finance). It is planned to start 84 sets in 2025, with a construction area of 52,700 square meters, mainly distributed in Zhao Xiang, Chonggu, Baihe, Xianghuaqiao, Zhujiajiao, Li Antang and Kanazawa. The transformation methods are internal separation, expansion and reconstruction, demolition and reconstruction, sporadic collection and household extraction (the transformation method is determined in combination with the construction plan during the Tenth Five-Year Plan).