Regulations on community construction

According to the relevant regulations of decoration control in China, except legal rest days and holidays, the construction time of residential areas is from 8: 001to 12 and 14 to 18, and noise decoration is allowed in completed residential buildings during this time period. If there are illegal regulations during legal holidays or rest periods, the owner has the right to stop them and complain to the property or relevant supervision and management in time. If the coordination still fails, the owner has the right to negotiate with the relevant local urban management departments to solve it.

Legal basis:

Measures of People's Republic of China (PRC) Municipality on the Administration of Residential Interior Decoration

Fifth residential interior decoration activities, prohibit the following acts:

(a) without the consent of the original design unit or the design unit with corresponding qualification grade, changing the main body and load-bearing structure of the building without authorization;

(2) Changing rooms or balconies without waterproof requirements into bathrooms and kitchens;

(3) expanding the original size of doors and windows of the load-bearing wall and removing the brick-concrete wall connected with the balcony;

(four) damage to the original energy-saving facilities of the house, reducing the energy-saving effect;

(five) other acts that affect the safety of building structure and use.

The term "building subject" as mentioned in these Measures refers to the structural structure of building entities, including roofs, floors, beams, columns, supports, walls, connecting nodes and foundations.

The term "load-bearing structure" as mentioned in these Measures refers to the main structural members and their connecting nodes that directly transfer their own weight and various external forces to the foundation, including load-bearing walls, uprights, columns, frame columns, piers, floors, beams, roof trusses and suspension cables.

Sixth decorators engaged in residential interior decoration activities, without approval, shall not have the following acts:

(1) Building buildings and structures;

(two) to change the facade of the house and open the doors and windows on the non-load-bearing external wall;

(3) Dismantling heating pipelines and facilities;

(four) the demolition of gas pipelines and facilities.

The acts listed in items (1) and (2) of this article shall be approved by the competent department of city planning administration; The third behavior shall be approved by the heating management unit; Article 4 The act shall be approved by the gas business unit.

Seventh residential interior decoration exceeds the design standards or norms to increase the floor load, it should be proposed by the original design unit or the design unit with corresponding qualification grade.

Eighth bathroom, kitchen waterproof layer changes, it should be in accordance with the waterproof standards to develop a construction plan, and closed water test.

Article 9 Where the original design unit or a design unit with corresponding qualification level puts forward a design scheme to change the main body and load-bearing structure of the building, or the decoration activities involve the contents of Articles 6, 7 and 8 of these Measures, it must entrust a decoration enterprise with corresponding qualification to undertake it.

Tenth decoration enterprises must be in accordance with the mandatory standards of engineering construction and other technical standards, and shall not cut corners to ensure the quality of decoration projects.

Eleventh decoration enterprises engaged in residential interior decoration activities, should abide by the construction safety operation rules, take necessary safety protection and fire control measures in accordance with the provisions, and shall not use naked fire and welding operations without authorization to ensure the safety of operators and surrounding houses and property.

Twelfth decoration enterprises engaged in residential interior decoration activities, shall not occupy public space, shall not damage public parts and facilities.

Article 17 The property management unit shall carry out management according to the residential interior decoration management service agreement, and immediately stop the decorators or decoration enterprises that have the acts listed in Article 6 of these Measures or violate the provisions of Articles 7, 8 and 9 of these Measures without the approval of the relevant departments; If it has caused factual consequences or refuses to correct it, it shall promptly report to the relevant departments for handling according to law. If a decoration person or decoration enterprise violates the residential interior decoration management service agreement, it shall be held liable for breach of contract.