Indoor renovation contract

Indoor renovation contract (4 selected articles)

With the strengthening of people's legal awareness, more and more scenes and occasions need to use contracts. In general, the contract must be signed in the prescribed way. So what are the common contracts? The following is my collection of indoor renovation contract (4 selected articles). Welcome to reading. I hope you will like it.

Entrusting party of indoor renovation contract (Party A) 1:

Organizer (Party B):

Through friendly negotiation between Party A and Party B, Party A decides to entrust Party B to decorate the living room. In order to ensure the smooth progress of the project, this contract is hereby signed in accordance with relevant national laws and regulations for * * * * to abide by.

Article 1: Project Overview

1. Project address: _ _ _ _.

2. Room specification: room type, with a total construction area of square meters.

3. Construction content: See Annex (1) List of Home Decoration Construction Contents and Construction Drawings for details.

4. Entrustment method:

5. Commencement date: xx, xx, completion date: xx, xx, xx, and total project days: days.

Article 2: Project Price

Article 3: Quality Requirements

1. The varieties, specifications and names of the main materials used in the project shall be approved by both parties.

2. The acceptance standard of this project shall be implemented with reference to the relevant provisions of the state.

3. During the construction, if Party A has special construction projects or special quality requirements, both parties shall confirm and sign a supplementary contract for the increased costs.

4. All materials and equipment purchased by Party A shall be borne by Party A; Party B shall be responsible for the quality of the project.

5. If Party A hires a project supervisor, it shall notify Party B before the project starts, so as to facilitate the work connection.

Article 4: Supply of Materials

1. Party B shall clearly price the materials used in this contract in strict accordance with the relevant national price regulations. The materials provided by Party A shall be used in the decoration project specified in this contract, and shall not be used for other purposes without Party A's consent ... If Party B uses them for other purposes, Party B shall compensate Party A at double the price of the misappropriated materials.

2. If the materials and equipment provided by Party B do not meet the quality requirements or have different specifications, they shall be prohibited from being used. If it has been used, all losses caused to the project shall be borne by Party B. ..

3. The materials and equipment that Party A is responsible for purchasing and supplying shall be qualified products that meet the design requirements, and shall be supplied to the site on time. Delayed arrival, postponed construction period and delayed punishment. Pay Party B 10% of the total materials provided by Party A as the management fee. After the materials are accepted by Party B, Party B shall be responsible for keeping them, and Party B shall be responsible for compensating the losses caused by improper keeping.

Article 6: Construction Period

1. If the construction period is delayed due to Party B's reasons, Party B shall pay Party A 1% of the working expenses as liquidated damages every day.

2. If the unqualified materials and equipment selected by Party A affect the project quality and time limit for a project, Party A shall bear the cost of rework, and Party B shall bear the cost of rework for quality accidents caused by Party B's construction, and the time limit for a project remains unchanged.

3. In the process of construction, if work is stopped due to engineering quality problems and disagreement between the two parties, it will not be punished as delayed work or delayed construction period. Both parties should take the initiative to ask the relevant departments for mediation or arbitration to coordinate the handling, resolve the dispute as soon as possible and continue the construction.

Article 7: Other matters

1. Party A's responsibilities

1) The house plan and water, electricity and gas circuit diagram approved by the property management department must be provided, or Party A shall provide the house plan and water, electricity and gas circuit diagram, and make on-site disclosure to Party B. ..

2) Secondary decoration project, in which all or part of the house is vacated and obstacles affecting the construction are removed. Necessary protective measures shall be taken for furniture and furnishings that can only be partially vacated in the house, and all formalities shall be handled with Party B, and the expenses shall be borne by Party B..

2. Party B's responsibilities

1) Assign a staff member as the on-site representative of Party B to be responsible for the performance of the contract, organize the construction according to the contract requirements, and complete the construction task on time with good quality and quantity.

2) Be responsible for the safety, fire prevention and civilized construction of the construction site, so as to prevent accidents such as pipeline blockage, water leakage, power failure and damage to articles caused by construction from affecting others. If it happens, it must be repaired or compensated as soon as possible.

Article 8: Liability for breach of contract

After the contract comes into effect, during the performance of the contract, the party that terminates the contract without authorization shall pay the other party 5% of the total contract amount as liquidated damages. If the actual losses caused by the unauthorized termination of the contract exceed the liquidated damages, compensation shall be made.

Article 9: Settlement of disputes

In case of any dispute during the performance of this contract, both parties shall settle it through consultation without affecting the project progress. If the parties are unwilling to settle the dispute through consultation, or if consultation fails, they may bring a lawsuit to the people's court in accordance with the contract.

Article 10: Modification and Termination of the Contract

1. After this contract comes into effect after being signed by both parties, both parties must strictly abide by it. If either party needs to change the contents of the contract, it shall sign a supplementary agreement after both parties reach an agreement through consultation. If it is necessary to terminate the contract, the party who proposes to terminate the contract shall do so in writing, and pay a penalty of 65,438+00% of the total contract price, and go through the termination procedures.

2. In the process of construction, if either party proposes to terminate the contract, it shall submit it to the other party in written form. After both parties agree to go through liquidation procedures and conclude an agreement to terminate the contract, the contract shall be deemed to be terminated.

Article 11: Entry into force of the contract

1. This contract shall come into effect after being sealed by both parties.

This contract is made in duplicate, one for each party.

Party A (Owner): Party B (signature and seal):

Xx year xx month xx day

Indoor renovation contract II Party A: (Seal)

Party B: ID number:

In accordance with the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and other relevant laws and administrative regulations. In order to clarify the rights and obligations of Party A and Party B, ensure safe and civilized construction, ensure the quality of the project, and complete the construction task on schedule, the principles of equality, voluntariness, fairness, honesty and credibility shall be followed. In combination with the actual situation of this project, both parties have reached an agreement on matters related to the construction of this project through consultation.

1. Project name: renovation project of the fourth and seventh districts of xx tourist market town.

2. Project Location: Dashanbao Town, Zhaoyang District, Zhaotong City

Three. Scope of contract and work content:

1. Contract scope: the scope of the construction drawing and construction contact list of this project.

2. Work content: Construction shall be carried out according to the requirements of the project department or drawings, and plastering and cleaning before acceptance of each batch of this project shall meet the acceptance requirements.

4. Contract method, unit price and payment and settlement method.

1. Contract method: no material contract.

2. Unit price:

(1), Engineering Press

3. Payment and settlement methods:

(1), the quantities are calculated according to the actual construction area. See the ruler at the door once, except once, the facade door doesn't count. Look through the window. Pull the ruler once and divide it once.

(2) Project progress payment: Pay the project progress payment according to the amount of work completed last month. Before 25th of each month, Party B will report the quantities completed in that month to Party A's project department. After the completed quantities are checked and accepted by Party A's on-site management personnel, Party B will pay the project funds, and Party B will attach the monthly salary table to Party B according to the project payment form.

(3), all the work content of this project is completed, and xx% of the total project payment is paid after the completion acceptance requirements are met; After the settlement by the owner, Party A shall settle all the project funds.

Verb (abbreviation of verb) quality standards and requirements

1. Project quality: the interior wall shall be leveled at one time, the wall surface shall be smooth, and the angle of yin and yang shall be vertical, which meets the requirements of function and use.

2. Project quality requirements: Party B must obey the unified deployment of Party A and carefully organize the construction according to the requirements of construction drawings, contact sheets, construction specifications and technical disclosure of Party A. ..

3. After each part is completed, self-inspection must be organized and reported to the project department for inspection. If unqualified quality is found, it must be rectified or reworked in time, and the project department has the right to punish Party B accordingly. All expenses for rectification or rework and all losses arising therefrom shall be borne by Party B. ..

Six, time limit for a project and requirements

1, duration:

2. The number of Party B's construction personnel must meet the needs of the project progress and ensure that the construction tasks can be completed on schedule or ahead of schedule.

3. Party B must obey the project schedule of Party A, and there is no reason for Party B to postpone the project schedule confirmed by Party A (including general schedule, monthly schedule, divisional schedule, etc.). ..

Seven, safe and civilized construction

Party B must obey Party A's management, unified command and deployment, and abide by various safety rules and regulations and civilized construction requirements on the construction site. In case of violation, the Project Department will impose a fine of 1000- 10000 depending on the seriousness of the case.

1. Party A shall provide equipment and facilities that meet the requirements of safe construction at the construction site. If Party B finds any hidden danger, it must immediately stop the construction, and report it to the management personnel of the project department for rectification, and the construction can be started only after it meets the requirements.

2. Party A is responsible for the command, supervision and management of engineering quality, progress, safe production, civilized construction and materials used in the construction site.

3. Party A is responsible for checking the quality, progress, safety and civilized construction of Party B's project, and has the right to ask Party B to strengthen management or even stop work for rectification and punishment when finding the quality and safety problems of the project.

4. Party B must ensure the ideological quality, physical quality and technical strength of the workers entering the site, and conduct safety technical education for the construction personnel. Party B's construction personnel must take all safety protection measures when entering the site, and personal safety protection articles shall be borne by Party B. ..

5. The constructors of Party B must strictly abide by the safety technical operation rules at work.

6. On-site construction and domestic electricity consumption must be maintained and installed by certified electricians, and non-electricians are not allowed to install stay wires and cables without authorization. Problems and failures must be reported to the project department or electrician for handling.

7. When working high above the ground, you must fasten your seat belt and take various safety protection measures.

8, after the completion of each assignments section must do a good job of cleaning, do clear the site after work.

9, field workers are strictly prohibited to drink and mount guard, the construction site shall not fight.

10. If any quality or safety accident occurs during Party B's construction, and it is caused by Party B, Party A shall assist Party B in handling relevant matters, and Party B must bear all economic losses and legal responsibilities, and the Project Department has the right to give corresponding punishment.

Eight. Other agreements

1. Party B is responsible for organizing and implementing the engineering construction within the subcontracting scope, and carrying out the construction according to the requirements of the contract, with one person as the person in charge and one person as the person in charge. Telephone:

2. Stealing, robbing and beating are strictly prohibited, and a fine of 2000-5000 yuan is imposed each time. It is strictly forbidden to gather people to gamble and make trouble. If it happens, for any reason, each party will be fined 5000 yuan each time. Any contradictions and disputes on the construction site must be reported to the project department in time, and properly handled in consultation with * * * to prevent the situation from expanding.

3. All construction workers must participate in the safety education and publicity activities organized by Party A, and Party B shall not arrange minors, the elderly and the infirm to enter the construction site for construction.

4. If Party B leaves midway without completing the agreed workload, for whatever reason, the completed part shall be settled at 30% of the contract price.

5. Party B shall not damage the on-site equipment and facilities. If there is any damage, Party B shall compensate according to the market price.

6. If an industrial accident occurs during the construction period, Party B will solve it by itself, and Party A will not bear any responsibility.

10. Matters not covered shall be settled by both parties through consultation. If negotiation fails, it shall be settled by the labor department.

1 1, this contract is made in duplicate, each party holds one copy, which will come into effect after being signed by both parties, and will be terminated after all the project funds are settled after the project is completed.

Representative of Party A (signature): Party B (signature):

Tel: ID number:

Contact telephone number:

Date of signature: xx, xx, xx, XX.

Entrusting Party (Party A) of Indoor renovation contract: Undertaker (Party B):

I. Project Location: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

II. Form and Structure: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

3. Project: (attached with construction description, construction drawing and project quotation).

4. Contracting method: Party B contracts the building and auxiliary building materials, and Party A brings the main materials.

Verb (abbreviation of verb) quality standard: the construction quality meets the safety requirements, and the decoration quality is not lower than the decoration standard of the same building type. Both parties agree that the Code for Quality Acceptance of Building Decoration Engineering (GB502 10—200 1) is the minimum standard for quality evaluation; The indoor environmental standards are 10 mandatory national standard for the limit of harmful substances in building decoration materials and the indoor environmental pollution control standard for civil construction projects.

Intransitive verb contract sum: (in words) _ _ _ _ _ _ _ _.

After the review is completed, it shall be settled according to the facts □; The contract payment is a one-time payment.

Seven. Payment method: after the contract is agreed, Party A shall pay 35% of the project price in advance _ _ _ _ _ _ _ _; Pay 40% of the project cost _ _ _ _ _ yuan after the concealed works such as water and electricity are qualified; Pay 20% _ _ _ _ _ yuan after the acceptance of the bricklayer's carpentry intermediate project, and pay the balance of 5% _ _ _ _ _ _ yuan within 5 days after the project completion acceptance.

Eight. This agreement is made in duplicate, each party holds one copy, which has the same effect. This agreement shall come into effect as of the date of signature by both parties.

Party A: Party B:

Tel: Tel:

Xx year xx month xx day

Indoor renovation contract 4 Party A:

Party B:

In order to ensure the construction quality and progress of plastering the basement wall and stairs, Party A and Party B sign this contract through consultation and abide by it jointly.

1. Project name:

2. Contracting method: contracting workers and drinks.

3. Unit price: plastering of basement per square 9 yuan, latex paint of stairs per square 17 yuan.

4. Building area: calculated according to the actual area.

5. Party A shall provide water and electricity, and Party B's construction personnel shall take care of their own accommodation.

6. Payment method: Party A shall pay 80% of the progress payment to Party B according to the monthly progress of the project, 90% after the completion of the site, and within one month after the acceptance.

7. This contract is made in duplicate, and Party B is not responsible for any mistakes.

8. Party A shall not delay Party B's construction, and Party B shall not bear any responsibility for it.

Party A: Party B:

ID card: ID card:

Tel: Tel:

Xx year xx month xx day