Flood control scheme

In order to ensure the high starting point, high quality and high level of work, it is often necessary to make a plan in advance, and the content and form of the plan should be carried out around the theme, and finally achieve the expected effect and significance. So how should we make a plan? The following is a model essay (6 articles in total) on flood control and flood prevention scheme that I have carefully compiled. Welcome to read the collection.

Flood control plan 1 I. Purpose

Through the simulation exercise of flood control emergency plan, the emergency response ability of employees after the flood occurred was improved, and the emergency rescue organization ability of the branch company after the flood occurred was tested. Evaluate the actual effect of each functional rescue team through drills, improve the professional level of each functional team member, and verify the feasibility and shortcomings of the scheme through drills.

Second, the simulation topic

Assuming early warning, the recent rainfall is too large, which is easy to cause floods. The project department immediately launched the emergency plan for flood control and carried out flood fighting and emergency rescue.

Third, exercise time.

A preparatory meeting will be held on the afternoon of June 6th, 20xx 1: 30 to explain the drill requirements, and the drill will be put into operation immediately at 2: 00 pm.

Fourth, the location of the exercise.

Construction site ofNo. 15 bid section of Shenyang Metro Line 2.

Verb (abbreviation for verb) participant

Subway project department flood rescue team and medical rescue team.

Sixth, the exercise plan

1, call the police

Early warning of flood control is very important. Early warning can make flood control and emergency rescue work start at the early stage of flood, and control the spread and expansion of flood in time. The flood control personnel on duty shall call the police at the first time and report to the project manager, deputy safety manager and safety quality department.

(1) The alarm contents shall include: the time, place (location) of the flood and the flood control measures being taken.

⑵ All personnel on site have the obligation to call the police, and the alarm content should be accurate and clear.

Step 2 receive newspapers

(1) After receiving the report, the project manager, deputy safety manager or safety quality department shall inform the rescue team to make emergency preparations as soon as possible and arrive at the flood control site in time.

⑵ Know the time, place and degree of the accident.

(3) Make records.

(4) notify the rescue team

5] report to the superior departments and leaders.

3. Emergency rescue operations

(1) After receiving the alarm, the flood control emergency command team of the project department should immediately coordinate and command according to the flood category, flood accident procedures and the scope involved, urgently mobilize all kinds of rescue teams to participate in emergency rescue, and invite relevant external forces to be present for support when necessary.

(2) Each person in charge of the command group shall, according to the requirements of on-site command, urgently mobilize corresponding materials, equipment and personnel to carry out emergency rescue or emergency rescue.

(3) If power and electricity are used at the scene of the accident, it should be cut off immediately, and the damaged roads, water and electricity facilities should be quickly restored to ensure the smooth development of emergency rescue work. Prevent secondary accidents and disasters.

(4) Within 5 minutes after entering the flood site, the security team should do a good job in traffic maintenance, guidance and evacuation, prevent and stop all kinds of sabotage activities and maintain public order.

5] After receiving the flood accident report, the medical rescue team should rush to the scene quickly, assemble medical staff and vehicles, and be responsible for sending the wounded to the designated hospital for rescue.

[6] The material and equipment support group ensures that emergency relief materials are transported in place in time according to the command of the on-site commander.

Once other relevant personnel should also actively cooperate with the rescue work according to the command of the on-site commander.

Being in the process of emergency rescue and disaster relief, emergency call equipment, materials, personnel and occupied space, etc. , shall not be stopped or refused for any reason. After the rescue and relief work, reasonable compensation should be given.

Seven. Exercise summary

(1) Main problems found in the drill

⑵ Evaluation of drill subject.

(3) Suggestions for improving the contents of this plan exercise project.

(4) Whether the emergency equipment and facilities meet the emergency requirements.

5] Sum up experience through drills.

[6] How to solve the problems in the drill.

Eight, please participate in the guidance of the site supervision, and report the summary of the exercise to the supervision department.

Flood control and flood fighting scheme 2 It is very important to do a good job in flood control to ensure the property safety of all construction sites and the life safety of construction workers. Combined with the actual situation of our town, this work plan is formulated.

I. Work objectives

Adhere to the flood control policy of "safety first, standing by and giving priority to emergency rescue", strengthen the organization and leadership of production safety work at the construction site in flood season, strengthen supervision and preventive measures, formulate preventive measures and deploy all work as soon as possible, resolutely curb the occurrence of production safety accidents and ensure the safety of flood season.

Second, organize and lead.

Set up a leading group for safety production at the construction site in flood season;

Team leader:

Deputy team leader:

Members:

Third, flood control measures

Practical measures must be taken to reduce the losses caused by flood disasters during the construction of various construction sites. We should take the initiative to control, study, arrange and implement early, and nip in the bud.

(A) to strengthen organizational security, clear responsibilities

Each construction site should set up a leading group for flood control and flood fighting, formulate feasible flood control and flood fighting and emergency rescue work plans in light of its own reality, formulate a responsibility system, and implement the responsibilities in detail to individuals.

(2) Prepare materials and set up an emergency rescue team.

According to the specific conditions of the project, each construction site should do a good job in purchasing and storing raincoats, rain boots, flashlights, rescue stretchers, commonly used relief materials, shovels, woven bags, river sand and gravel trucks and other materials. At the same time, it is necessary to organize people who have the ability to work to set up an emergency rescue team to ensure that once an accident occurs, they can be put into emergency rescue work as soon as possible.

(3) Strengthen flood prevention propaganda and carry out emergency drills.

All construction sites should make full use of slogans, radio and television staff meetings and other effective ways to carry out publicity and education on flood control and flood fighting knowledge, enhance staff's awareness of disaster prevention, and organize an emergency rescue drill before the flood season.

(four) to carry out safety inspection in flood season.

All construction sites should carry out self-inspection of safety production in flood season. First, check the implementation of the main responsibility of flood control safety production in the project, and implement various safety production measures and responsibilities to specific posts and responsible persons in flood season; The second is to check the safety protection of temporary sites, dormitories, sheds, warehouses and other facilities on the construction site, and try to avoid areas that may be affected by landslides, collapses, mudslides and other disasters; The third is to strengthen the inspection of key parts and links in the construction site, focusing on the supervision of sub-projects with high risks, such as scaffolding engineering for foundation pit support of drainage and transportation roads in the construction site, high formwork engineering and lifting, installation and disassembly engineering of support system, underground excavation and underwater operation engineering, etc. Fourth, strengthen the monitoring of meteorology and construction during the construction period, timely warn and effectively carry out preventive measures.

(five) the implementation of the duty system to ensure the smooth flow of information.

Each construction site should make arrangements for duty in flood season, ensure the smooth communication equipment for 24 hours, take the initiative to contact the supervision unit of the meteorological department, keep abreast of the rain and water conditions, do a good job of prevention and evacuation before the danger comes, reduce property losses and avoid casualties. In case of danger, report to the town's leading group for production safety at the construction site in flood season, and organize emergency rescue teams to put into emergency rescue and disaster relief, so as to ensure the life safety of construction workers and people in the affected areas and minimize property losses. After the emergency rescue team of the superior unit arrives, all actions should be obeyed.

Fourth, the flood season construction principle

(1) Strengthen the contact with meteorological and hydrological departments, understand the local natural climate, geological conditions and the specific conditions of this project, formulate the construction organization design and technical measures during the flood season, reasonably arrange the construction during the flood season, and prepare appropriate construction materials and protective equipment to avoid affecting the project progress due to difficulties in material preparation.

(2) Vehicles, machines and other production facilities in the resident warehouse should be parked above the flood level, away from the alluvial piles of debris flow ditches, and temporary drainage facilities should be built to ensure that the work site is not flooded and the surface water can be discharged in time.

(3) According to the weather forecast and the actual situation of the project, before the flood comes, the machinery and equipment will be evacuated from the dangerous area in batches, parked in a safe place, and drainage facilities will be built to discharge accumulated water in time to prevent gully collapse caused by heavy rain and ensure safety.

Verb (abbreviation for verb) job requirements

Raise awareness and strengthen organizational leadership.

All relevant units on the construction site should attach great importance to the work of safety in production during the flood season, deeply analyze the situation of safety in production in their own departments, carefully formulate flood control plans and emergency rescue plans, strengthen supervision and inspection on the implementation of responsibilities, and establish and improve the safety risk assessment system, hidden danger investigation and rectification system and accident accountability system. Carry out comprehensive inspection in flood season in time to eliminate all kinds of hidden dangers of accidents and ensure the safety of people's lives and property.

(two) strictly supervise the implementation of law enforcement measures.

All units should check and correct their own production safety responsibilities, such as emergency plans and hidden dangers rectification. For the problems and hidden dangers found in the inspection, we should urge the rectification to eliminate them and "look back" in time. We must resolutely supervise the major hidden dangers found, and resolutely punish projects or units that do not rectify or refuse to rectify.

(3) Strengthen duty and submit information in time.

It is necessary to strengthen the duty work in flood season and strictly implement the 24-hour duty system. The personnel on duty should stick to their posts, ensure smooth communication, and do a good job in analyzing and judging relevant information. In case of emergency, important situation or major emergencies, you should immediately consult the report, take effective measures to deal with it, and timely organize the early emergency rescue work. Enterprises and individuals who report accidents will be severely punished according to law.

Flood control and flood fighting scheme 3 In order to do a good job in flood control and disaster relief of the county's transportation system in 20xx, ensure safety and smoothness, effectively control and relieve dangerous situations, and avoid and reduce casualties and property losses to the maximum extent, according to the spirit of the county government's flood control work conference and the guidance of the municipal flood control bureau, combined with the actual situation of our county's transportation system, a flood control scheme in 20xx is formulated.

I. General requirements

Flood control is related to people's life and property safety, economic construction and social stability. It is necessary to fully understand the seriousness of the flood, resolutely overcome the weak flood consciousness, paralyzed thinking and lucky psychology, and enhance the sense of responsibility and urgency. When an over-standard flood occurs, we should do our best to protect and ensure the safety of major traffic facilities and take emergency measures to minimize the losses caused by the flood disaster. In case of flood threat and damage, complete the emergency repair task to ensure the normal passage of the highway. Adhere to both flood control and waterlogging prevention, flood control and drought relief, and ensure the completion of the flood control and drought relief work tasks of the transportation departments.

Second, the job responsibilities

According to the definition of the responsibilities of the member units of the county flood control headquarters, the flood control responsibilities of each unit of the transportation system are as follows:

Highway Bureau: Responsible for flood control safety of trunk roads such as national highways and provincial highways in the county, and timely organize manpower and material resources to repair damaged roads, bridges and culverts to ensure smooth roads.

Rural Highway Management Office: responsible for the flood control safety of rural highway traffic within the county, timely organize manpower and material resources to repair rural roads and bridges and culverts damaged by water to ensure smooth roads.

Transportation Management Bureau: responsible for organizing and coordinating the transportation of flood fighting, emergency rescue and relief materials and evacuated personnel.

Law enforcement department: responsible for maintaining the order at the scene caused by the flood; Assist the public security department to ensure smooth roads in dangerous sections.

County Motor Transport Corporation and Municipal Passenger Transport Company: responsible for organizing flood control and emergency rescue, disaster relief and transportation of materials for key flood control projects.

Bureau: responsible for the communication between team members and the coordination of flood control management within the transportation system during the flood control period.

III. Organizational leadership and division of labor

In order to clarify responsibilities and strengthen inspection and supervision, according to the responsibilities of each unit, the division of labor among members of the flood control headquarters of our bureau is as follows:

Xxx: Take overall responsibility for flood control work and give unified command to flood control work.

Xxx: Be in charge of the flood control work of the Bureau, be responsible for the daily work of the flood control headquarters of the Bureau, and assist the Director in coordinating the flood control work of the whole system.

Xxx: Responsible for flood control work of Highway Bureau.

Xxx: Responsible for flood control work of traffic development company.

Xxx: In charge of flood control work of Transportation Management Bureau, County Automobile Transportation Corporation and Yunguangshan Company.

Xxx: in charge of flood control work of rural highway management office.

Xxx: in charge of flood control work of law enforcement office.

The chief executive of each unit is the first responsible person for flood control work in this unit.

Four, emergency personnel, vehicle arrangements

System-wide preparation 120 flood control personnel, 40 vehicles. In which: 30 persons from Highway Bureau, 10 vehicles; There are 20 people in Transportation Management Bureau, organizing social vehicles 10; 30 law enforcement offices; County Automobile Transportation Corporation has 30 people, 10 vehicles; There are 30 people in the city transportation company, and the bus 10. In case of catastrophic flood or dangerous situation, the personnel of each unit shall be led by the first responsible person of the unit, and the vehicles shall be led by the leaders in charge of the unit to participate in the rescue mission (the list of rescue personnel of each unit shall be reported to the Bureau's Flood Control Office, which is located in the Bureau's business unit).

Verb (abbreviation for verb) job requirements

1, strengthen the awareness of flood control. All units should earnestly strengthen their leadership over flood control work, carefully organize and actively prepare, fully perform the duties and obligations of the flood control law, enhance flood awareness, firmly establish the idea of being prepared for danger in times of peace, and actively do a good job in flood control work.

2. Strictly implement the flood control responsibility system. We will fully implement the responsibility system for the top leaders of the administration, and ensure that our thinking, work, command and input are in place. Team members and related personnel should have clear responsibilities, clear tasks, carry out their duties and cooperate closely.

3, strict flood control work discipline. The responsibility of flood control work is great, and all units should fully understand the importance of flood control work from the perspective of the overall situation and the safety of people's lives and property, strictly abide by relevant regulations, obey orders and obey orders. Dereliction of duty, slacking, shirking responsibility and other losses. , we must resolutely pursue the responsibility of the relevant leaders and parties.

4. Before the flood season comes, all units should comprehensively investigate the safety conditions of their infrastructure, roads, bridges, production workshops, yards, stations, construction sites, vehicles, etc., find hidden dangers, rectify them in time, nip potential accidents in the bud, and closely combine flood control with "safe production month", "safe production year" and special rectification activities for safe production, so as to ensure the correct production of flood control and the safe crossing of the flood season.

5. During the flood control period, the top leaders of all units must ask for leave from the main leaders of the bureau when they go out for business or personal reasons, otherwise they will be dealt with in violation of discipline. All units should adhere to the 24-hour duty system. Once in distress, rescuers and vehicles should be on standby at any time to ensure foolproof.

Flood control and flood fighting scheme 4 Our town is located in a mountainous area with complex terrain and many reservoirs in Shantang. In addition, the decline of forest coverage in recent years has affected the ecological balance of forests, caused serious soil erosion and even frequent floods, endangering people's normal life and life and property safety. In order to do a good job in prevention and reduce losses, the militia flood prevention and rescue plan is formulated.

First, improve the organization and strengthen leadership.

The town set up a flood control headquarters, with mayor xxx as the commander and director of the town's armed forces xxx as the commander.

As the deputy commander-in-chief, he established the leading group of Boyang Town Flood Control Headquarters, which is composed of the heads of the town water conservancy station, broadcasting station, post sub-office, telecom sub-office and town supply and marketing cooperative, and is mainly responsible for the command during flood control and the flood control work in peacetime.

Second, raise awareness and take precautions.

All units should put flood control and emergency rescue work on the agenda and rely on the masses to do a good job in flood control and emergency rescue. First, understand and master the topography of the region and the changes of flood disasters over the years, formulate flood prevention and rescue plans and action plans in light of the actual situation, make emergency preparations, and reduce the losses caused by floods; The second is to strengthen the management of Shanchang Reservoir, determine the person in charge, strictly abide by the reservoir management regulations, implement the reservoir safety inspection system, and report and deal with problems in time.

Third, flood control and emergency measures.

1, with urban wired communication as the main communication tool and mobile phone as the auxiliary communication tool when necessary. During the flood season, the telecom sub-bureau will open a special telephone line to ensure that special personnel are on duty and timely grasp and report the flood disaster;

2. As a sharp knife force for emergency rescue and disaster relief, the town militia emergency detachment should always obey the command of the town flood control command post. The militia emergency detachments in the four villages of xx, xx and xx, after receiving the order from the town command post, should quickly reach the designated assembly area and accept the emergency rescue task. Need to confirm the transport vehicles, once the traffic is blocked, walk to the assembly area. Other villagers mainly undertake the task of flood control and emergency rescue in the village group.

3. Strengthen flood control and emergency rescue work for important targets. Xx, xx villagers soldiers (including emergency teams) should not only undertake the disaster relief tasks in their villages, but also undertake the rescue and disaster relief tasks of the township subordinate units.

4. Emergency procedures in case of disaster. Town leaders organize personnel transfer, and then rescue important targets and warehouses.

5. Be vigilant to prevent criminals from taking the opportunity to destroy.

6. Make good living arrangements for the victims after the disaster, and actively organize post-disaster production to help themselves and rebuild their homes.

Fourth, requirements:

1, all militia should put the interests of the country and the people first, have the idea of caring for everyone, and be ready to invest in emergency rescue and disaster relief at any time;

2. Obey orders and commands;

3. Villages, especially those with emergency teams, should ensure that there are special personnel on duty during the flood season and villagers' battalion commanders are in place.

Flood control and flood fighting plan 5 In order to ensure the normal development of flood control work in the jurisdiction, create a safe social environment, maintain stability, development and serve the overall situation, the annual flood control plan (arrangement) is formulated as follows:

First, raise awareness, overcome paralyzed thoughts, and seriously prepare for flood control.

According to the unified deployment of the district flood control office, based on flood control and Taiwan resistance, we should do all the preparatory work as soon as possible. Adhere to both flood control and waterlogging elimination, take the initiative to prevent and highlight key points. 6 18 drains all flow through our jurisdiction, and the water level is high in flood season over the years, which is a great threat to our jurisdiction. In addition, the drainage pipeline in the jurisdiction is not smooth, the river siltation is serious, and the flood control project is not perfect. Therefore, the street flood control work is under great pressure and the task is arduous. Villages, communities, enterprises, institutions and government departments in villages must overcome their paralyzing thoughts and fluky psychology, and make full preparations ideologically, organizationally and in terms of measures, so as to be ready at any time and be prepared.

Two, clear tasks, implement measures to ensure safety in flood season.

This year's street flood control work resolutely implements the policy of "safety first, constant vigilance, prevention first, and all-out rescue". The specific tasks and measures are:

1, villages, communities, resident enterprises and institutions, and street departments should conscientiously implement the responsibility system for flood control leaders in accordance with the requirements of the Flood Control Law, and the main leaders should take overall responsibility for the flood control work of their own units.

2, according to the unified deployment of each district, combined with the situation of my street, the village (community) as a unit, in the village (community) area by the village (community) is specifically responsible for, all units in the region are responsible for the flood control work in this area. Street flood control office is responsible for organizing the preparation of flood control and emergency materials. Street judicial offices cooperate with Tan Jia police station to maintain flood control order, organize people to evacuate and transfer, and severely crack down on criminals who steal flood control materials and destroy flood control projects and communication lines.

3. It is necessary to establish the principle of "prevention first, prevention is more important than looting" and carry out a pre-flood inspection: (1) All villages, communities and resident enterprises and institutions should conduct a pre-flood inspection of flood control facilities, school classrooms, material warehouses and workers' houses. (2) The leaders of Baocun (community) in the street take overall responsibility for Baocun (community). (3) government departments should conduct a comprehensive inspection of villages (communities) and rectify the problems found within a time limit. All units are required to clear and dredge drainage facilities in time to ensure smooth drainage. For low-lying and waterlogged plots, it is necessary to strengthen the management of drainage facilities, arrange special personnel to be responsible, and give full play to their drainage capacity. Leaders and units in charge of division of labor should not only do well the inspection and preventive measures before flood season, but also be responsible for the whole process of flood control.

Third, organize rescue teams and make good material reserves.

Street organization a militia flood control emergency detachment, militia emergency camp personnel ***40 people, directly by the street armed forces unified organization and command, responsible for the rescue work; Villages and communities are also dominated by security defense team members. According to the village (community) scale, a rescue commando team with no less than 10 people will be set up, and the street flood control office will deploy and command it uniformly. All units in the street should set up flood control offices and rescue commandos according to the unit size and task weight. Street defense office is responsible for organizing 10 rescue team, medical rescue work in flood fighting and emergency rescue, and organizing health and epidemic prevention work.

Before the flood season, all units should carry out necessary technical training to ensure that they can pull, grab and defend in case of danger, and make preparations for flood fighting and emergency rescue.

Villages, communities and resident units need flood control materials and emergency equipment, adhere to the principle of self-reliance and local materials, combine collective reserves with mass reserves, reserve them as early as possible and keep them by special personnel; Take it with you and don't miss the rescue.

Four, the establishment of duty system, strengthen the information contact and instruction system.

All villages, communities, resident enterprises and institutions will be on duty day and night from now on, and the duty arrangement will be reported to the street flood control office. Heavy rain is an order. During the flood season, the rainstorm lasted for more than half an hour, and all the rescue team members of all units were on duty. If the situation is in distress, ask for instructions in time and report in time.

Five, strengthen the organization and leadership, establish and improve the flood control institutions.

Flood control is related to the overall situation, and the responsibility is more important than Mount Tai. Villages, communities and resident units should proceed from the overall situation of stability, development and service, earnestly strengthen their leadership over flood control work, and conscientiously implement the flood control responsibility system with the responsibility system as the core. Street flood control leading groups and offices shall be established to do a good job in street flood control. Villages, communities and resident units should also set up leading groups for flood control, headed by the main leaders.

Six, strict discipline, flood control according to law

All units should establish the concept of the overall situation, strictly enforce the discipline of flood control, obey the dispatching command, make full cooperation and close cooperation, unite to fight floods, and never allow them to go their own way. In case of emergency in flood season, the street flood control office has the right to call materials, equipment, means of transportation and manpower according to the needs of flood control and flood fighting, and take other necessary emergency measures. It is necessary to further implement flood control laws and regulations such as the Water Law, the Flood Control Law and the Regulations on River Management. Direct leadership and responsibility shall be investigated for those who disobey gathering people to disturb project management and flood control order, refuse to clear obstacles or set up new obstacles, dig sand and borrow soil in dangerous river sections without authorization, do not listen to dissuasion, destroy or steal flood control projects and flood control materials and facilities, embezzle and misappropriate flood control and relief materials and funds, neglect their duties and operate illegally, resulting in losses. Units or individuals that have made contributions to flood control and disaster relief work shall be commended.

Flood control and flood control scheme 6 I. Guiding ideology of flood control

Attach great importance to it, strengthen leadership, closely monitor it, forecast it in time, and strike it accurately, with the aim of ensuring the safety of state property and people's lives, and spare no effort to rescue and rescue the disaster and reduce the losses caused by the disaster to a minimum.

Two, this year's flood control work objectives and main measures

The goal of this year's flood control work is: to implement the prevention policy of "safety first, prevention first, being always ready, and doing all-out rescue", and to formulate plans, countermeasures and measures from the aspects of organization, system, personnel and materials in view of various possible flood disasters. Main measures taken:

(a) to raise awareness and further strengthen the leadership of flood control work.

Our bureau should fully realize that flood is a devastating natural disaster, which not only destroys the achievements of natural forest project and returning farmland to forest project, but also damages the ecological environment, and causes huge economic losses and people's lives and property losses, affecting social stability and the realization of the national sustainable development strategy. In accordance with the requirements of the party's mass line education and practice activities and the spirit of being highly responsible to the people, and starting from the overall situation of reform, development and stability, flood control work should be included in the important agenda.

(two) do a good job in flood control propaganda, and effectively improve the awareness of flood control.

All forestry stations should regularly go deep into forest areas, pastoral areas and villages, carry out various and rich publicity activities in combination with the Flood Control Law, Flood Control Regulations and other laws and regulations, and adopt the publicity methods of combining centralized publicity with decentralized publicity, fixed-point publicity with mobile publicity, so that flood control can penetrate into the hearts of everyone in forest areas and make the cadres and masses in forest areas improve their enthusiasm and consciousness in flood control.

(3) Strengthen inspections to eliminate hidden dangers of flood control.

Cadres and workers of forestry stations and township rangers should earnestly perform their duties, increase the efforts to eliminate the rivers and mountains prone areas under their jurisdiction, and make early warning and forecasting to prevent floods and landslides.

(four) to strengthen the duty and flood control reporting system.

During the flood control period, our bureau should adhere to the 24-hour duty system, and the leaders should personally lead the class, handle related affairs in a timely manner, effectively enhance the sense of mission and responsibility, stick to their posts, and make the situation clear and the data accurate.

(five) to further improve the supply of timber for flood control and disaster relief, and actively improve the ability to cope.

Our bureau will do a good job in timber supply for flood control and disaster relief, and reserve a certain amount of timber. In case of flood, the timber transportation place will be arranged in Jintang Wood Processing Factory, and the required timber can be provided to the disaster area at any time.