Job Recruitment Website - Property management - Three professional work reports of construction engineers
Three professional work reports of construction engineers
?
The first article: model essay on engineer's business work report
Over the past year, under the leadership of the company, I have worked in XX Engineering Department with plans, measures, inspections and summaries. I have a tacit understanding with the comrades in the department and complete all the work step by step according to the company's work objectives and tasks. Looking back on my work in the past year, I thank all the leaders for their support and trust, and all my colleagues for their help and concern, so that I can make continuous progress. Here, I would like to express my heartfelt thanks!
This year, I work in XX Engineering Department. According to the arrangement of the company leader, I was originally responsible for the civil management of the second phase project. Later, because the second phase of the project did not start, the company leaders made adjustments and arranged for me to be responsible for the property management of the first phase. As for the adjustment of work, I can adjust my work style in time, devote myself to the company, be serious and responsible, work hard and complete the task wholeheartedly. Implement the attendance system every day, so as to arrive early at work and not leave early after work. In the first stage of project property maintenance management, we should strive to grasp the following four links:
First, do a good job in property maintenance management and try our best to satisfy the owners. According to the national property management standards, do a good job in housing maintenance technology and housing maintenance construction management. In response to every owner's complaint and the property company's report on housing quality problems, I can thoroughly understand the relevant situation, actively communicate with the property company and the owner, and coordinate in time to prevent the contradiction between the owner and the real estate company from escalating. At the same time, timely notify the construction unit personnel to come over for maintenance, and follow up and be responsible for on-site supervision until the project construction is completed and the owner is satisfied.
The second is to strengthen the management of property equipment to ensure that the property equipment managed mainly includes water supply and drainage equipment, gas equipment, fire fighting equipment, ventilation equipment and electrical equipment can operate normally.
3. Property environmental management: Property management companies have the obligation to manage the environment of residential quarters, so that it can meet the standards set by the state, including pollution prevention, environmental cleaning and environmental greening.
Fourth, property management safety: property companies should take various measures to ensure the personal and property safety of owners and users of houses, manage community security, manage community fire safety, and manage vehicles and personnel entering and leaving the community. If the above four items are not in place and the measures are not effective, I will put forward them in time and coordinate with the property management company to solve them. If it can't be solved, I will report it to my superiors until the rectification is in place.
The drawings of the second phase project have been approved. Look at the second phase drawings as soon as you have time, so that you can understand and be familiar with the drawings as soon as possible, find and record the problems existing in the design of the drawings, and put forward opinions to lay a good foundation for the second phase construction.
According to the requirements of the group company, employees in XX area need to consciously look for shortcomings, vacancies, deficiencies and their work contents. The theme activity of correcting ideological and behavioral style is to establish? Are courage and slowness really like iron? Thought and macro-control? Worried? Consciousness. At present, it is a critical period for macro-control of the domestic real estate market. The key is that different subjects have different understandings of the market, so they adopt different behaviors and strategies. The key period lies in the different goals, behaviors and strategies of market players, so the game between the parties will become more and more fierce. In particular, the game between the central government, local governments and real estate developers may become increasingly fierce and incandescent.
We can see that for the domestic real estate market, with the gradual opening of the stagflation and price reduction situation that lasted for one year, not only the risks of the real estate market have been released, but also the interests of the main bodies of the real estate market have begun to differentiate. Facing the huge risks of the real estate market (such as banking risk, financial risk, economic crisis risk, social contradiction risk, etc.). ), the central government is becoming more and more aware of this, the macro-control attitude is becoming more and more determined, and the goals to be achieved and the policy tools adopted are becoming more and more detailed. For example, in his recent speech on real estate regulation, Premier xx reiterated for the first time the country's basic policy on the decline of housing prices, and the return of housing prices to rationality must be acceptable to the vast majority of residents, or it can be solved if they have the ability to pay. This is not only the short-term goal of the current macro-control of real estate, but also the bottom line, and it is also the basis for the healthy development of the real estate market in the future.
Judging from the current situation, the central government's goal is not only to increase the construction of affordable housing, but more importantly, how to transform the entire China real estate market and guide the domestic real estate market to truly become a consumer-led market. In this sense, the central government should learn from the lessons of the financial tsunami in XX. At that time, in order to stimulate economic growth, a series of excessively preferential credit and tax policies were adopted for real estate through document 13 1, which led to the uncontrolled rise of real estate prices and a huge real estate bubble. Therefore, in the critical period of domestic real estate macro-control, the central government will not repeat the same mistakes, and the macro-control situation will be more firm and specific. For example, in order to curb and crack down on real estate speculation in an all-round way, it is estimated that the government has many strict policy reserves, including speeding up the real estate property tax and implementing strict tax policies on investment houses, so as to demonstrate the central government's determination to macro-control real estate.
With the determination of the state to macro-control the real estate, our company should also slow down the pace of real estate development. Talking about the diversion and development of human resources is one of the most basic, important and precious resources of modern enterprises. Human resources impact the turbine of the enterprise with its continuous vitality, thus affecting the production and operation of the whole enterprise. Without the support of human resources, enterprises can't live for a day. However, if the human resources are surplus and allowed to overflow, enterprises will also face extinction. This is a difficult problem that many enterprises have to face at present.
The scientific management of human resources must be a dynamic management. If the human resources of an enterprise are in a static state for a long time, it will accumulate into a pool of stagnant water over time, and the enterprise will have no vitality at all. The vitality of enterprises lies in the vitality of human resources, and the vitality of human resources lies in its diversion, reorganization and development. The significance of human resources diversion is by no means a simple downsizing, but a streamlining of the main business channels and opening up new channels to revitalize resources. After all, human resources are a kind of resources. Resources should not be a burden. It is a great waste of resources to throw them away as a burden. Of course, the diversion and reorganization of personnel and means of production is not a simple matter of course. This reorganization requires not only the renewal of ideas, but also the re-development and re-combination of people and means of production, which may be a difficult running-in process. To a great extent, diversion means separating some human resources from channels and importing them into some non-main channels, which also means that some people will be imported from familiar positions to unfamiliar positions. An important way to develop human resources is business training. Without training, there will be no reorganization and rebirth of human resources.
Although the real estate market is in a downturn, consumers are holding money and watching, and real estate in some first-and second-tier cities is declining, I believe that the ice and snow in the real estate market will come again, and the cold days will not last long: warm days will come. It will be sunny after the storm. Company leaders have firm confidence and the ability to resist risks calmly, and the development of our company will be brilliant.
While summing up this year's work, we should conscientiously understand and focus on building a work pattern promoted by * * *; Improve the dynamic working mechanism; Innovative and effective work carrier; Strive to achieve perseverance and unremitting work style. In view of the shortcomings in their own work, strive to overcome, continue to strengthen theoretical study, and firmly establish? Service first? Concept, constantly strengthen business learning, be an expert in business, improve work efficiency, and make the work to a new level.
?
The second part: the model essay of the engineer's business work report
I have always been very supportive of the party's principles and policies, concerned about and studied the country's current affairs and politics, and insisted on strict demands on myself with high standards. I can adhere to the Four Cardinal Principles, Marxism-Leninism, Mao Zedong Thought and Deng Xiaoping Theory, and study and discuss them carefully? Eight honors and eight disgraces? Socialist concept of honor and disgrace, earnestly study and experience the party's? Building a harmonious society? The spirit of. I can strictly abide by laws and regulations, and can establish and maintain a correct outlook on life, values and socialist concept of honor and disgrace. In recent years, I have been insisting on reading news reports, xx daily and other news columns or newspapers and magazines, so as to better study and implement the line, principles and policies of the party and the country and maintain political consciousness by understanding state affairs and people's voices. Keep pace with the times? .
Second, in terms of professional ethics, while paying attention to improving ideological and moral character, we should also pay attention to the cultivation and improvement of personal cultivation and professional ethics. I always insist on studying the laws, regulations, rules, systems, norms and standards related to construction projects, so as to be loyal to my duties, abide by the law, be honest and self-disciplined, work hard and constantly strive to improve the quality of work. I have always been modest, studious, dedicated, conscientious and responsible, have a good professional ethics, and can strictly abide by it? Honesty, law-abiding, fair and scientific? Principles of implementing supervision and management of construction projects. Be able to respect the post and love the industry, abide by the law, be down-to-earth, and work diligently and meticulously; Help others in life, unite and be friendly, and care for others. Can lead the team, unite as one, give full play to the collective wisdom and strength, and devote yourself to the work. Can actively guide and lead comrades who have just joined the work, let them always feel that someone cares, loves and helps them, change their roles as soon as possible, and urge them to continuously improve their professional level and be better qualified for their work as soon as possible.
Third, professional skills: I studied in the civil engineering major of China Central Radio and TV University from March 20XX to March 20XX, studied the professional courses of construction and management of construction engineering, and mastered the theoretical knowledge of construction engineering, which laid a solid foundation for mastering the professional skills of construction engineering in the future. During the work, I constantly refueled myself, participated in the training and assessment of safety officers, and continued the re-education of budget officers.
Seriously studying relevant laws and regulations and professional technical knowledge can make theory closely linked with practice, guide practice with theory, and sum up work experience in practice, thus enriching one's theoretical level and achieving twice the result with half the effort. In 20XX, he was qualified as a second-class constructor, and municipal engineering in 20XX will soon be evaluated as an addition. In recent years, by systematically studying professional theoretical knowledge, insisting on the front-line work in construction engineering, and paying attention to integrating theory with practice, I have mastered a number of professional skills in construction engineering. I am proficient in office application software such as office, AutoCAD architectural drawing, construction engineering, municipal budget and final accounts, garden engineering budget and final accounts, have the professional level of compiling construction organization design, can independently complete the compilation of a set of bidding documents, and can skillfully use bidding skills according to the actual situation of the project to improve the probability of winning the bid and the income after winning the bid. Master the skills of on-site construction and quality management of construction projects, and be competent for on-site construction, quality management and overall responsibility of large and medium-sized buildings. In the future work, I will continue to study, supplement my knowledge and improve my professional skills, so as not to fall behind in this society with updated knowledge.
Four. Work performance and performance since I joined the work, I have always insisted on participating in a number of construction projects in the front line of construction projects, including some representative building community projects in xx, such as Jiahe Garden, Today Star City, Sheng Xing Jiayuan, Xinyuan City Garden Demolition and Resettlement Community in Xinzhuang Street in the east of xx, and people's demolition and resettlement projects at Jinghu Lake under construction. In practical work, I always maintain a serious and responsible, rigorous and pragmatic working attitude, study hard with an open mind, constantly strengthen theoretical knowledge and improve my professional level. After six years of training, I have grown into an engineering and technical backbone. During the period of 20XX~20XX, I worked in XX Hongda Construction Consulting Co., Ltd. as the project director of Jiahe Garden, Today Star City and Sheng Xing Jiayuan. These projects are massive, including brick-concrete structures, frames, shear walls, raft foundations and so on. In these projects, I can combine theoretical knowledge with practice and guide practical activities with theoretical knowledge. Cooperate with the construction unit to successfully complete the project on the premise of ensuring the quality and safety of the project. After delivery, it was well received by users and supervised by relevant units.
?
The third part: the model essay of the engineer's business work report
Since I joined the work; Strictly abide by national laws and regulations; Never participated in various illegal and disciplinary activities. Firmly support the leadership of the China * * * production party and adhere to the party's reform and opening up, right? Theory of Three Represents theory? Spirit is the action program of our work, making due contributions to the construction of Socialism with Chinese characteristics. I strictly abide by the rules and regulations formulated by the unit, be strict with myself and be lenient with others, and play an exemplary role. At work, I have been studying, researching and summarizing the experience and lessons of a construction industry. Amateur? Up to now, the project manager has comprehensive and mature professional technical ability and management ability, independently undertakes the construction of housing construction, bridges, roads and drainage projects, and has made great achievements in political thought, professional ethics and professional level. The summary is as follows:
I. Political thoughts
In my work, I am very supportive of the party's policies and guidelines. I insist on watching news broadcast TV programs every day, caring about and studying the current affairs and politics of the country, applying the party's political thoughts and principles to engineering construction, often having discussions with project department personnel, and organizing project department personnel to learn and publicize the party's policies and principles. Going to the party? Representative of Sanquan? And then what? XX big? Spirit, I seriously study and experience, let go? Theory of Three Represents theory? As the criterion of your own work, put? XX big? As the goal of our own struggle, spirit should be built in all directions? Xiaokang? Social life, make your own contribution? Add bricks and tiles? The reason.
Second, work attitude and career path.
Since I joined the work, I have loved the construction industry and worked hard. I always insist on the successful completion of projects no matter how hard or tired, and make achievements, never caring about personal gains or losses. I often work overtime all night to grab the construction period. Whether in the cold wind, the scorching sun or the rainstorm, I stick to my post and command the smooth completion of each project. Looking at the completion of high-rise buildings and silver-gray avenues, I feel extremely proud and glorious in my heart. I have paid countless hardships and sweat, and I have been well received by the society. I have no regrets and am satisfied.
Third, knowledge level and professional ability.
At work, I keep learning cultural knowledge and professional knowledge, and strive to improve my knowledge level and professional ability. I began to take the national self-taught examination for electronic specialty from XXXX 65438+ 10, and now I have obtained the certificates of six courses, taking computers as a compulsory course for work, and I have been able to use computers to do office work. For the new norms, standards and quotas of the construction industry, every time they are introduced, I will buy them and study them carefully, master them, apply them to engineering construction, and constantly sum up experiences and lessons. Every time the project is completed and accepted, I carefully record the project acceptance, compile it and store it in my own project completion acceptance record file. I often analyze and study the completion acceptance records to find out what problems I have in the project construction, what aspects are worth improving and what aspects are worth carrying forward.
Some technical treatment measures in project management are summarized as follows:
1. Cracking of precast slab in brick-concrete structure. Preventive measures are as follows: clean the joints of precast slabs, dry them, then set a bottom die under the joints, wipe the joints with plain cement slurry, and then fill the joints with cement mortar1:2,5, with the height of mortar being 1/3, and vibrate for compaction. The sand is preferably coarse sand, and finally, the joints are filled with fine stone concrete, and compacted by vibrating. Strengthen maintenance. In this way, the plate seam is not easy to crack.
2. In bridge construction, the design of concrete closure groove and concrete pouring sequence: the closure groove of bridge should be designed at the top of the bridge arch and one third of the span, and it is forbidden to design it at arch support. When pouring concrete, the arch concrete should be poured first, then the bridge arch concrete in the arch frame should be poured symmetrically, then the arch concrete should be poured symmetrically, and finally, when the concrete strength reaches more than 70%, the closed channel concrete at this temperature should be poured.
3. Treatment method of expansion joints in road construction: The traditional treatment method of expansion joints is to set dowel bars, which will often lead to the fracture of concrete pavement and affect the appearance and use function. What I introduced is the expansion joint of vibrating beam, which does not need dowel bar. The method is as follows: dig a groove at the bottom of the expansion joint, the size is long? Wide? How long is the expansion joint? 50cm? 20cm, after trench excavation, c30 concrete is poured, and its surface is flush with the base, then two layers of linoleum are laid on the concrete surface, and finally pavement concrete is poured, and the expansion and contraction places are separated by 2cm wide wooden boards or foam boards, and asphalt flax and ointment are poured at the joints.
Fourth, the project management
Construction project management is a complex and changeable work, and the quality of management is directly related to the economic and social benefits of the project. Engaged in management for many years, I think project management is a system of overall arrangement, rational utilization and comprehensive management. Personnel, materials, machinery and articles should be carefully organized, deployed and rationally utilized. Maximize the management of safe production and adhere to? Safety first? Policy, ensure the quality of the project, adhere to? Quality for survival? Principle, strictly control the project quality, strive for rapid progress, abide by the construction contract, reduce the project cost, and create the best quality, the safest production and the lowest project cost in the shortest time.
The construction industry is an industry with profound knowledge and a wide range of knowledge. Can it be said that? Never too old to learn? In my future work, I will study cultural knowledge and professional knowledge harder, practice constantly, do my job well and make more contributions to society.
?
- Previous article:How about Yi Lin Yuan in Tianjin?
- Next article:Is there an accounting system for property management?
- Related articles
- Where is the community with the highest property management fee in China?
- What are the advantages and disadvantages of Hongxi County in Yuanyang, Tianjin?
- How to get to Suzhou Zongbao Building?
- Is the traffic convenient in Gaoming Country Garden? How should I get there?
- What about Hua Ting, the hero of Zhengzhou Yingdi?
- Shopping mall property recruitment safety information
- What's the full name of DTZ? What is the full English name?
- How to become a real estate agent
- Rich people in most areas are famous for their extravagant consumption. Why are the richest people in Guangdong most famous for flip-flops?
- How to alleviate the psychological pressure of epidemic situation