The preparation of decoration is an important part of decoration and the key to the success of decoration. This article will introduce the process of preparation before decoration to help you better understand the preparation before decoration.

Design measuring room

If you are looking for a decoration company, the designer will go to the blank room to measure the room; If you don't find a decoration company, you need the owner to measure the house himself. The size of the measuring room should be accurate to centimeters, and the drawing of the measuring room should be drawn and marked.

Property filing

As long as it is decoration, you must go to the property for the record to avoid being discovered. If it's a new house, the property will charge a garbage disposal fee, which can save a lot of things. If it's not a new house, ask where the nearest construction waste station is and find a car to pull it over.

Demolition and construction

Demolition of the wall, including the whole wall and half wall (make the wall thinner). Some walls need to be built after being demolished, and some places have not been demolished, but new walls need to be built in the open space.

Hydropower building materials

Communicate with the plumber and ask the workers to make a purchase list and take it to the market for purchase. Including water pipes, wires, electrical pipes and corresponding accessories.

grade

Slot the wall so that the water and electricity pipelines can be installed normally.

pipe laying

When installing water and electricity pipelines, line clamps are needed in the pipeline laying process, which is also the installation at this stage.

Preliminary acceptance of hydropower

This acceptance is mainly to record the direction of the pipeline. Fortunately, there is a mobile phone now, so just take pictures in time.

backfill

Masons enter the site, backfill with gypsum or cement or putty and level the grooves and openings.

Manufacturing level

Leveling the ground, so that the follow-up work can proceed smoothly.