What are the renovation processes?
1. Determine the decoration method before decoration.
Determine the decoration style, the installation delivery budget and the installation delivery mode (all-inclusive, half-inclusive and clear-inclusive).
All-inclusive decoration: including auxiliary materials, main materials and construction.
Half a package of decoration, auxiliary materials and construction, the owner of the main material will buy it.
Cleaning and decoration, contracting, the owner buys the main materials and auxiliary materials himself.
Main materials: tiles, floors, latex, wallpaper, etc. The main materials are generally finished products.
Fine materials: cement, sand, gypsum, stone machinery, putty, etc.
2. Find a baking contractor (7-8 days)
Companies that rely on routine business.
Number of workers: The so-called gradual renovation team is a courageous worker, not introduced by acquaintances, or an expert in installation and transmission of street stalls in Shanghai, including waterproof, carpentry, electrician and cement workers. The decoration team without business license has uneven decoration level and difficult construction quality.
For protection.
Foreman: Jia Yong is lower than the decoration company. The design, installation and transmission companies are all good. We should compare more and find a reliable one.
Design seminar; Design is more dominant.
3. Go through the commencement formalities (half a day)
In terms of property management, the owner can handle it by himself or entrust the loading company to handle it.
Materials to be brought: decoration drawings, decoration construction scheme, decoration construction contract, qualification certificate of decoration construction unit, person in charge of construction, etc. It is also necessary to pay baking deposit, cleaning fee, perfume and other expenses to the property management party.
4, dismantle (3-7 days)
Demolition and reconstruction means the beginning of formal construction, mainly including wall demolition, wall shoveling, heating removal and replacement of plastic steel windows. Some things that don't need to be dismantled can be ignored!
5, hydropower transformation (5-7 days)
Steps of hydropower transformation: water and electricity disclosure → water and electricity estimation → material entry → pay-off and slotting → strong and weak electricity piping → water supply and drainage piping → strong electricity box layout → site cleaning → inspection.
note:
If you want to install floor heating, central air conditioning, fresh air system, you need to go to the site to measure and negotiate the wiring details before hydropower transformation.
After the decoration construction enters the site and before the hydropower transformation, the company's designers are invited to take measurements to design the specific functions and layout of the cabinet and provide the hydropower map.
6, water and electricity acceptance 1 day)
Hydropower has to be checked and accepted at every stage, after all, it is very troublesome to repair this kind of thing later. Water pipes should be pressed for trial inspection, and the materials of wires and water pipes should be inspected in detail.
Remember to keep the water and electricity circuit diagram and take pictures of every detail when accepting.
7, mud tile construction (6- 1 1 day)
Pipeline construction → wall foundation treatment → brush wall waterproofing → auxiliary wall tiles → brush.
Ground waterproofing → closed water test → floor tile laying → cleaning and protection → marking.
note:
The kitchen floor should be 30cm waterproof, and the floor should be covered with a layer.
The waterproof height of the bathroom wall is 180cm.
It takes 24 hours to close the water and try your face after waterproofing.
8. Woodworking construction (10-2 1 day)
Main projects: hanging dragon erection, wooden door production, unfinished cabinet production, TV background modeling, wood floor installation, plaster line, whole house cabinet, skirting line, floor platform, etc.
- Previous article:Is it easy to enroll students in MCC South?
- Next article:Which district do Huayi Property and Fuyu Industrial Park belong to?
- Related articles
- Why is Xiang Yu Mansion so cheap?
- What about Qiqihar Hengtai Real Estate Development Co., Ltd.?
- Model essay on service pacesetter deeds materials
- What is the treatment of security officers in AVIC Integrated Equipment Co., Ltd.
- What about Qingdao Gankun Jude Real Estate Consultant Co., Ltd.?
- What is the procedure for electing the owners' committee in the community?
- What is the telephone number of Binzhou Wanghai Garden Sales Office?
- How to get to Kumquat Garden on Shangbo Road in Pudong New Area?
- Why is Taizhou Longfeng Home closed?
- What are the requirements for property management research? What certificate did you take just after graduation?