Decorative process sequence diagram
The sequence diagram of decoration process shows that the house is a place for people to relax as a rest place, and warmth and comfort are the most important requirements. Therefore, the decoration of the house should be carefully understood to avoid being fooled. Here, I will share with you the sequence diagram of the renovation process.
Decoration process sequence diagram 1 I. Detailed explanation diagram of decoration process steps
1, preliminary design
Pre-design is a key link in the whole decoration process. If the design is not good, it will have an impact on all links. Therefore, before the design, we must first make a detailed measurement of the house, including the area to be tiled, the area to be wallpaper, and the wall size to be equipped with furniture.
2. Demolition and transformation of the main body
The main demolition and reconstruction is to complete the framework of the house, which is the first project in the whole reconstruction process, including demolition of the wall, construction of the wall, shoveling of the wall skin, replacement of plastic steel windows and so on. It should be noted that every house will have a load-bearing wall, and it must not be moved during decoration, otherwise it will easily leave potential safety hazards.
3. Hydropower transformation
Hydropower is indispensable in our life, so in the hydropower transformation, we should not only choose professional installers, but also choose good wires and water pipes, otherwise it will be difficult to change after moving in. In addition, at this stage, the owner can make an appointment for the first measurement of the cabinet. Although the cabinet designer will not give the specific size, he will point out the approximate location of the socket. It is suggested that the owner can reserve two more sockets as a backup when installing sockets.
4, carpentry, bricklayer, painter
The appearance sequence of these three construction links is wonderful, following the principle of "whoever is dirty comes first", so the first one is carpentry, the second is bricklayer, and the last one is painter. In a sense, the construction links such as ceiling and plastering line made by carpenters can also be counted as part of the main demolition and reconstruction, so it is meaningful to appear first.
5, water heater installation
When carpenters, bricklayers and painters have finished construction, they can install water heaters. If it is a gas water heater, it can be installed directly in the kitchen. If it is a water heater, it should be installed in the bathroom. When buying a water heater, the owner had better choose a brand, which will be more secure and have better energy-saving effect.
6, kitchen and bathroom ceiling
After the water heater is installed, the kitchen and bathroom ceiling can be carried out. At present, there are many ceiling materials on the market, and the kitchen and bathroom are special spaces, so besides looking good, waterproofing is also an important part. Especially when installing the bathroom ceiling, you should first buy materials such as exhaust fans and yuba, and install them together when installing the ceiling.
7. Installation of cabinets and protective covers
It is best to install cabinets and range hoods on the same day, so that the position can be better adjusted and it will be more convenient to use. But before installation, the owner needs to go to the property in advance to turn on the gas. After the gas stove is installed, it can also be tested.
8, wooden door installation
The wooden door can be measured after the main body is removed, and the wooden door can be installed after the cabinet is installed. Generally, the production cycle of customized wooden doors takes one month, so the owner must control the time and better connect the construction period.
9. Floor installation and wallpaper laying
The floor installation is very complicated. First level, then clean, and finally dry the floor, so as to create a more practical floor. After cleaning the floor, you can start to spread wallpaper. Like the floor, you must clean the wall first, but pay attention to keep it dry. If possible, it is suggested to protect the floor first, so that the later development and cleaning will be easier.
10, switch socket installation, lamps installation, hardware sanitary ware installation, curtain rod installation.
The position of the switch socket has been fixed during the hydropower transformation. It should be noted that the switch and socket in the bathroom must be waterproof with a cover, which will be safer. In addition, the installation of lamps, hardware sanitary wares and curtain rods can be carried out at the same time.
1 1, pioneering cleaning
Although curtain rods have been installed, it is best not to install curtains before pioneering and cleaning, so as not to get dirty.
In order to ensure a more thorough cleaning, we should put as few items as possible and keep them "flat".
12, Introduction to Furniture, Installation of Home Appliances, Home Accessories
In fact, it is almost completed after pioneering cleaning, and then furniture, household appliances and various accessories are purchased according to the owner's own needs. There is no fixed practice, but when choosing home appliances, it is better and more secure to choose brands.
Decoration process sequence diagram 2 1, field measurement
Before the decoration workers start work, it is best to personally measure every corner of the house, write it down with a ruler book, measure it well, mark it well, and don't be lazy. The main measurement contents are:
1. Determine the area involved in the decoration process, especially the tile area, floor area, wallpaper area and wall paint area.
2, the wall size should be clear, especially the design and placement after home use.
2. House design
Be sure to communicate with the designer in the early stage and have a certain understanding of your home.
3, construction preparation
Handle relevant formalities with the property, including decoration deposit, work card and other matters.
4. The main body is demolished and changed
This is the first project to be started, and its main contents include demolishing walls, building walls, demolishing heating and replacing plastic steel windows. After completion, the garbage should be cleared out in time to keep the room clean, which is also convenient for later construction.
5, wooden door manufacturer measurement
6. The first measurement of cabinets
At this time, you can choose the door and learn about cabinets, range hoods and cookers. , and determine it, so that manufacturers can take measurements at home.
7. Hydropower transformation
Once the water and electricity are installed, there will be no regret medicine. Cover it with bricks and put a ceiling on it. It is difficult to add sockets. Therefore, we must carefully determine the number of switches, lights, bathtubs, washing machines and other locations.
Before the hydropower transformation, the cabinet designer should go to the door to measure and make clear the location of the plug and waterway transformation. Serious people can ask the decoration master to design the position of power supply and interface according to the size of the water heater set by themselves.
Friendly suggestion: ① It is best to leave a plug under the basin to facilitate the installation of kitchen treasures in the future.
② The position design of the air conditioner is best placed at the bedside position to avoid the air conditioner blowing at people in the future.
③ Keep a distance of 20cm between strong current and weak current, for example, keep a distance of 20cm between socket and network port.
8, bathroom waterproof
Toilet waterproofing should always be careful, and the 48-hour closed water test is best verified by the owner himself.
9, the main material comes into play
Wall brick, cement, plate and other materials come into play, and the owner shall be present for inspection and acceptance and sign.
10, bricklayers stick bricks.
Please buy a floor drain before tiling. The floor drain should be specially used for shower and washing machine, which has the function of deodorizing.
It's best to ask the cabinet designer to check and determine the location of the faucet and bathtub.
1 1, woodworking comes into play.
Carpenters mainly make ceilings, cabinets and some wall shapes.
12, partition, sliding door, measuring ruler
The customization period of the sliding door is about 20-30 days, which needs to be prepared in advance.
13, secondary measurement of cabinet
After tiling and ensuring, you can ask the cabinet designer to make another home measurement, and the measured size will be more accurate and fine.
14, painting the wall
The effect of the wall depends largely on the skill of the oil workers.
It should be noted here that if the wall is to be painted in color, the color must be lighter than the color card, because when painting the wall, at least two topcoats are usually applied, so the color of the upper wall is getting darker and darker, and the same color or deeper will lead to the color of the upper wall being darker than the color card.
15, kitchen and bathroom ceiling
Install the water heater and yuba first, and then install the ceiling edge sealing. The water heater with ceiling edge sealing and half cover is also more beautiful.
16, kitchen and toilet installation
At this time, you can ask the cabinet manufacturer to send the range hood, cooker and the like together. These things cost a lot of money. You can ask the manufacturer to pack a water pipe or something, which is always useful.
17, gas
After the cabinet installation is completed, you can contact the property to install gas.
18, wooden door installation
I contacted the carpenter to install the door, but I couldn't change it before coming down, otherwise the size of the door wouldn't match.
If the finished door is installed, it should be installed before the floor. There are many tools such as hinges and locks, in order to avoid hitting the floor tiles.
19, wallpaper paving
Don't open the window for ventilation within 48 hours after pasting the wallpaper, let him dry slowly in the shade, and tell the master that if there are some places, let him help mend them.
20. Floor installation
Before installation, the ground should be leveled to prevent dust pollution. If it is not laid in time, the ground should be closed when it is to be treated, and the surface dust should be removed.
2 1, switch socket installation
This part of the installation usually takes half a day.
It is best to choose the switch function, especially in the kitchen, such as electric appliances such as rice cookers and microwave ovens. We can use the switch to control, without plugging and unplugging.
22, lamps and lanterns installation
23, hardware sanitary ware installation
24, curtain rod installation
25. Pioneering cleaning
The biggest thing is to clean the glass and wax the floor. Waxing must be bought by yourself, which is cheap and easy to use, but you must choose a clean waxing machine, which is faster than manual 10 times or even 100 times.
After they finish cleaning, you'd better do another thorough cleaning test, go to the supermarket to buy a bag of "Wu Jie powder" (the advertising fee is confiscated), dip Wu Jie powder in two towels, and clean every room from the door to the door, from the tiles to the kicking. Don't be lazy. The result will surely make you proud.
26, furniture comes into play
27, home appliance installation
At this time, beds, TVs, air conditioners, etc. can be installed and placed.
At this time, in order to protect the floor, you can buy disposable shoe covers before this, which are of better quality and will not break when you step on them. There is also a floor protective film to protect the floor during the handling of household appliances.
28, home accessories
Finally, buy some ornaments, ornaments, picture frames, etc. A warm and perfect home becomes.
Decoration process sequence Figure 3 Although decoration is a very tiring process, we must pay attention to the following details for the beauty and comfort of our new home:
1, the design layout should be reasonable: design is the first step of decoration, first of all, the plane layout should be reasonable and suitable for your living habits; Remember not to follow suit in design style. Other people's products may not be suitable for your home, and the products of online celebrities may not bring you the expected surprises.
2, hydropower materials and construction technology should pay attention to: hydropower materials can not be saved, do not buy wires that can not meet the national standard or save money with smaller wires. Generally, it is recommended that ordinary sockets should be at least 2 and 5mm, and kitchen and bathroom should be 4mm alone.
3, waterproof can not be saved: generally we say that the bathroom is waterproof, but the kitchen and balcony are still recommended, waterproof is to let yourself worry, more is better than less.
4. The flue should be wrapped: this is a structural detail. The flue left by developers is generally sealed with plates. It is best to build a layer of red brick outside for insulation and nail the hanging cabinet.
5. The anti-crack treatment of the wall surface should be in place: if there is a new wall or a slot in the wall surface, it must be treated with anti-crack wall cloth and kraft paper.
6. The latex paint process cannot be urgent: latex paint construction is the most urgent process. If it is winter or rainy, putty will dry slowly. If it is not thorough, the next process will lead to cracking and peeling of latex paint in the later stage.
7. Furniture such as colored paint will be painted with a second topcoat after entering the market: Now many people will choose colored latex paint, but once the colored paint has been knocked and repaired, it will have obvious traces, so attention should be paid to the installation and entry of furniture. In order to avoid leaving traces, you can also leave a second coat of paint at the last brush.
- Related articles
- Shanxi Lantai Property Management Co., Ltd. Resignation Provisions Resignation Process
- Address of Zhenxing Elevator Apartment in Zhuhai
- Which community does Gouzhuang Jiayuan belong to?
- Summary of Ten Personal Work of New Employees during Probation Period
- Where is Wuhan Chen Long Liwan Phase II?
- Is there a place where I can exchange mink coats in Nong 'an County?
- Excuse me, how to inquire about the housing personal maintenance fund? Does the property company have the right to use the personal maintenance fund?
- What if it's no use calling 12345 to complain about the property?
- Where is the address of Guangzhou Yihe Center (Business)?
- Who is the torchbearer of the Xiamen Olympic torch relay?