Job Recruitment Website - Property management company - Excuse me, who can send a budget quotation for home improvement (EXCEL format) and the villa in the middle of the building? Thank you very much. Urgent! 67086 164@qq.com

Excuse me, who can send a budget quotation for home improvement (EXCEL format) and the villa in the middle of the building? Thank you very much. Urgent! 67086 164@qq.com

Home improvement budget quotation sheet makes home improvement more transparent.

Serial number Project name Unit quantity Unit price Village quality and process description

I. Foundation transformation and other foundation projects

1 Demolition 120 Brick wall (interior wall) ㎡ 1 30 Demolition of labor, bagging and garbage piling; Does not contain foreign garbage; The engineering quantity is calculated according to the development area.

2. Demolition of 240 brick walls (interior walls) ㎡ 1 45. Dismantling, bagging and stacking garbage; Does not contain foreign garbage; The engineering quantity is calculated according to the development area.

3 brick masonry wall (120 wall) ㎡ 1 120 is built with light brick 1: 3 cement mortar; 1: 3 double-sided pumping of cement mortar; The engineering quantity is calculated according to the development area.

4 brick masonry wall (wall 240) ㎡ 1 145 is built with light brick 1: 3 cement mortar; 1: 3 double-sided pumping of cement mortar; The engineering quantity is calculated according to the development area.

5 gypsum board partition (sound insulation treatment) ㎡ 1 105 adopts 30*40 Chinese fir keel or U75 light steel keel, and the keel spacing is within 400mm; Filling sound insulation cotton, sealing 9mm gypsum boards on both sides, leaving seams, and sealing seams with paper tape or gauze in the later process; Scrape putty and brush latex paint. Are calculated separately; The engineering quantity is calculated according to the development area.

6. Remove the original wall coating ㎡ 1.4. Remove the labor force and bag the garbage; Does not contain foreign garbage; The engineering quantity is calculated according to the development area.

7. The sporadic foundation of the wall is treated with M2 1 35 doors and windows, and the cement mortar is allowed to swing after the wall is dismantled.

8. The doorframe base adopts M 1 40 18mm wood core board base, leveling, excluding doorframe line, convergent line, decorative board and paint, and the quantities are calculated by extension meters.

9. Masonry shall be built with M 1.50 1/4 brick wall, plastered with single powder 1: 2 cement mortar, and manholes shall be reserved. The engineering quantity is calculated according to the extended meter.

Second, the ground engineering

1 ground backfill (depth less than 300mm) ㎡ 1.55 muck/yellow sand backfill compaction, 1.2.5 cement mortar screeding; The quantity of works is calculated according to the projected area (for every increase of depth 100mm, the charge will increase 10 yuan /m2).

2 ground cement mortar leveling (within 40mm) ㎡ 1 35 adopts 32.5# cement and yellow sand; 1︰2.5 Cement mortar shall be leveled, slotted and maintained. If the construction thickness is less than 30mm, the total price will increase by 4 yuan/㎡ for every 5mm increase in thickness. The engineering quantity is calculated according to the projected area.

3 Waterproof water treatment (wall and floor) ㎡ 1.55 Lin Le waterproof coating, clean the base according to the requirements of waterproof construction, the extension wall is 350mm high and the shower faucet is 1800mm high. Brush for three times, and the 24-hour closed water test is up to standard.

4 Floor tiles (below 330*600mm) M2 1 43 labor, cement and sand, excluding the cost of main materials, the construction thickness is less than 40mm, and the excess part is calculated as leveling layer.

5 Floor tile laying (600*600mm or 800*800mm) M2 1 48 labor, excluding cement and sand, the construction thickness is less than 40mm, and the excess part is calculated as leveling layer.

6. Dry paving method of 32.5# cement, yellow sand and 1: 2.5 cement mortar is adopted for paving the threshold marble M 1 30; Within 30mm of construction thickness, the part of cement mortar layer with thickness exceeding 30mm shall be calculated as leveling layer; Does not include the cost of the main material marble; The engineering quantity is calculated by linear meter.

Third, the wall engineering

1 basic treatment and putty scraping M2 1 14 plastering putty for the yin and yang corners of the wall shall be leveled, and waterproof putty shall be scraped twice, and then polished and leveled. According to the white top white wall, such as cement mortar wall with 5 yuan /m2(80 1 environmental protection glue, gypsum powder or environmental protection finished putty); The engineering quantity is calculated according to the development area.

2 Dulux "Jia Lian" M2 1 6 latex paint for three times, and the price is limited to a set of two colors in the living room. For each additional color, the color matching fee and loss are 150 yuan.

3 Dulux "Jia Lian" pure flavor M2 1 8 latex paint is used for three times, and the price is limited to a set of two colors in the living room. Each additional color increases the color loss of 150 yuan.

4 Dulux "Five in One" M2 1 13 latex paint is used three times, and the price is limited to a set of two colors in the living room. Every time a color is added, it is necessary to add 150 yuan color matching and loss.

5. Brush moisture-proof paint M2 1 12 moisture-proof varnish on the wallpaper base; Does not contain wallpaper and wallpaper glue.

6 M2 1 43 labor, cement, sand, excluding the cost of main materials, and the labor cost of oblique paving, staggered joints or wall tiles below 300*300mm is increased 1.5 yuan/m3.

Four, smallpox project

1 gypsum corner line M 1 18 finished gypsum corner line, gypsum is bonded with powder, and latex paint is not included.

3. Flat-topped M2 1 90 30*40 Chinese fir keel gypsum board, 9mm countersunk tapping screws for fixing gypsum board, nail heads brushed with antirust paint, joints filled with gypsum putty, and joints sealed with cowhide or fiber bandage.

4 gypsum board ceiling 1 1 15 30*40 Chinese fir keel, 9mm gypsum board countersunk self-tapping nail fixed, nail head brushed with antirust paint, joints filled with gypsum putty, sealed with cowhide or fiber bandage.

5 Aluminum gusset ceiling M2 1 100 0.8mm thick aluminum gusset (limited price 55 yuan /m2) and its installation, including supporting keel, excluding corner line, and the quantities are calculated according to the developed area.

6 paint internal angle M 1 14 paint internal angle line (limited price 7 yuan/meter) and its installation.

Verb (abbreviation of verb) furniture engineering

1 TV cabinet (less than 30CM in height) M 1 360 18mm wooden core board frame, 15mm wooden core board cabinet door, Jiuli board back board, veneer veneer veneer, wood thread closing, excluding hardware, paint and interior decoration.

2 Door-less wardrobe (less than 60cm) M2 1 390 18mm wooden core board frame, nine-board back board, veneer veneer veneer, wood thread closing, excluding hardware and paint, interior decoration.

3-door wardrobe M2 1 460 18mm wood core board frame, 15mm wood core board cabinet door, nine-board back board, veneer, wood line closed, excluding hardware, paint and interior decoration.

4. Shoe cabinet M2 1 480 18mm wooden core board frame, 15mm wooden core board cabinet door, Jiuli board back board, veneer veneer veneer, closed wood line, excluding hardware, paint and interior decoration.

5 Decorative cabinet/wine cabinet M2 1 420 18mm wooden core board frame, Jiuli board back board, decorative board facing, partially pasted with 5cm silver mirror, 8 transparent glass laminated board, closed with wooden lines, excluding hardware, paint and interior decoration.

6 bookcase M2 1 420 18mm wooden core board frame, nine-board back board, veneer veneer veneer, closed wood line, excluding hardware, paint and interior decoration.

7 Desk M 1 360 18mm wooden core board frame, nine-board back board, veneer, wooden line closed, excluding hardware, paint and interior decoration.

8 Cabinet interior furniture treasure M2 1 18 imitation wood grain color thickened furniture treasure, and the engineering quantity is calculated according to the developed area.

9 The interior of the cabinet is decorated with red beech plank M2 1 35 red beech plank, excluding paint, and the quantities are calculated according to the developed area.

Six, paint engineering

1 M2 1 25 The varnish in the cabinet is brushed by hand, with one bottom and one side, and the quantities are calculated according to the developed area.

2. Polyester varnish M2 1 65 Hand brush, manicure, polishing, three-bottom and two-sided varnish, and the quantities are calculated according to the developed area.

3. Polyester ready mixed paint M2 1 95 adopts machine spraying, putty or transparent putty spraying and polishing, and ready mixed paint has three bottoms and two sides. The engineering quantity is calculated according to the development area.

Seven, water circuit engineering

1 hydropower project (comprehensive) ㎡ 1 85 calculated according to the construction area ×85 yuan /m2.

2 Wuhan No.2 Electric Wire Factory's circuit wiring (high voltage) M 1 20 inspection-free single-core copper conductor (lighting1.5mm2, socket 2.5m㎡, air conditioner 4m2), Aikang color-separated flame-retardant conduit; Elastic line positioning, slotting, pipe burying, fixing, testing, 1:2.5 cement mortar powder slotting, and standard bottom box embedding. Switch socket panel and lamps are not included.

3 loop wiring (weak current) M 1 18 akihabara weak current wire, Aikang color-separated flame retardant conduit; Elastic line positioning, slotting, pipe burying, fixing, testing, 1:2.5 cement mortar powder slotting, and standard bottom box embedding. Switch socket panel and lamps are not included.

4 laying M 1 45 "Jinniu" PP-R pipe and its special fittings in the water inlet pipe; Comprise that following step: laying, slotting and sealing seal materials and pipelines; According to the actual construction quantity, the engineering quantity is calculated according to the water pipe extension meter; Sanitary ware, valve nozzles, hoses, emitting materials and installation are not included.

5. Laying M 1 36 "United Plastic" PVC pipes and their special fittings for drainage pipes; Comprise that following step: laying, slotting and sealing seal materials and pipelines; According to the actual engineering quantity, the engineering quantity is calculated according to the length of the drainage pipe; Anhydrous materials and installation.

Top 6, weak box 1 150 Relocate and dismantle the original distribution box, fill it with bricks, plaster it with cement mortar and shave it. Wall positioning, drilling, installation of finished distribution box (excluding distribution box and box front door line) and cement mortar powder repair.

Eight, installation project

1 installation of lamps and switch panels 1 340 net manual installation of various lamps, switch socket panels, distribution boxes, air switches, etc. (excluding the installation of crystal chandeliers)

2 sanitary ware installation item 1 220 net manual installation of various sanitary wares, faucets, valves, water meters, etc. Does not include large sanitary wares installed by dealers.

3 Hardware installation items 1 150 net manual installation of towel rack, towel rack, bathtub handle, soap box, cup holder, cupboard door handle, floor drain, clothes rail, etc.

IX. Other projects

1 material transportation fee project 1 400 The direct cost of the project is more than 40,000 yuan 1%, and the project within 40,000 yuan is 40,000 yuan. It does not include the freight of materials purchased by customers.

2. The direct cost of the material item 1.400 project is more than 40,000 yuan, which is charged as 1%, and the project within 40,000 yuan is charged as 40,000 yuan. If there is no elevator handling for more than five floors, this item shall be calculated at an increasing rate of 20% for each floor. Does not include the cost of materials purchased by customers.

3. Garbage cleaning fee 1.400. The direct cost of the project is 1% if it is more than 40,000 yuan, and the project within 40,000 yuan is 40,000 yuan. The garbage is cleaned, bagged and transported to the designated location of the property department on the first floor for stacking.

Project direct cost ∑ (I-IX)

B management fee ∑A* 10%

C total project cost ∑A+B

D tax ∑C*3.69% is paid when the tax bill is issued.

Supplementary explanation:

1. This quotation does not include the management fee and deposit (refundable) charged by the property management company, and the customer shall bear this fee by himself. The water and electricity costs during the construction period shall be borne by the customer.

2. When the project is settled according to the facts, when calculating the area of latex paint, the doors and windows shall be calculated according to 50% of the actual area.

3. If the actual engineering quantity is inconsistent with the budget, everything will be subject to the actual occurrence. The increase or decrease of decoration cost shall be calculated and paid in the third phase of the project.

4. This budget does not include sanitary ware, lamps, tiles, stones, floors, kitchen cabinets, hardware (hinges, handles, drawer slides, clothes hangers, etc. ), switch socket panel, air leakage protection, craft glass, wallpaper.

5. Considering the preparation work of Party B, if the customer wants to cancel a single project, Party B can only return it to the customer according to 90% of the single quotation.

User message: