Job Recruitment Website - Property management company - Pipeline maintenance contract
Pipeline maintenance contract
Pipeline Maintenance Contract 1 Party A:
Party B:
According to the Contract Law of People's Republic of China (PRC) and relevant laws and regulations, both parties to the contract reach an agreement on the pipeline maintenance project through consultation on the basis of voluntariness and equality, and sign this contract.
I. Project name:
All public pipeline valves in the community yard
Second, the project site selection:
No.3, Biao North Street/KLOC-0, Pingshan County, Shanshui Qingcheng Community
Third, the way of contracting:
Party B undertakes the work and materials.
Four, the project contract cost:
The tentative fee is RMB eight thousand three hundred and sixty-six Yuan only, and the final total fee is subject to the final audit.
Verb (abbreviation of verb) construction cycle:
Xx, xx to xx, xx, xx. The construction period is xx days; For each day of delay, the construction unit has the right to deduct the project payment from the construction unit according to 3‰ of the total contract price. If the construction period cannot be completed on schedule due to special circumstances, the construction unit shall submit a written notice to the construction unit, and the two parties shall negotiate an appropriate extension.
Six, project quality and acceptance:
The construction unit shall, according to the requirements of the relevant technical data provided by the construction unit, carry out the construction in strict accordance with the relevant technical specifications and standards promulgated by the state and the plans approved by the relevant departments to ensure the construction quality. During the construction period, the construction unit shall appoint on-site supervisors to supervise the construction quality, and negotiate with the construction unit to solve the problems in the construction process and the quality acceptance visa of concealed works. After the project is completed, full-time inspectors from the quality inspection department are invited to participate in the acceptance together with Party A and Party B, and Party B is required to provide inspection reports, certificates and other relevant certificates of materials used in this project during the acceptance.
Seven. Responsibilities of both parties:
Party A:
1. Ensure the construction conditions of "three links" (water, electricity and roads). Provide relevant drawings and technical data, and send on-site supervisors to supervise the project quality progress.
2. Have the responsibility to supervise the transfer of all project funds to the account designated by the construction unit.
3. Handle all supervision and construction procedures except the quality and technical supervision department.
Party B:
1, inspect and supervise the safety of the construction environment, and take timely measures to correct potential safety hazards.
2. Party B's technicians should hold relevant certificates, study drawings carefully, arrange construction progress, ensure quality and safety, fill in construction records every day, clean up the garbage on site every day, and thoroughly clean up the site sanitation before the project is completed.
3. In case of special circumstances, explain the situation to Party A in time to avoid unnecessary losses.
4. Ensure the construction safety of the construction site, and all safety accidents during the construction period shall be borne by Party B. ..
Eight, quality warranty:
The shelf life is two years. During the warranty period, if the components (including equipment and pipelines) repaired, modified or installed by Party B have problems in operation (causing direct economic losses), Party B shall compensate Party A for all losses caused thereby. ) Party B shall repair, replace (or install separately) for free. The accident caused by improper operation shall be borne by Party A..
Nine. Liability for breach of contract:
This contract shall come into effect after being sealed and signed by both parties. Unilateral breach of contract or termination of contract is not allowed.
Contract; In case of unilateral breach or cancellation, 15% of the total contract cost shall be used as liquidated damages to compensate the other party.
X. Ways to resolve contract disputes:
Disputes arising from the performance of this contract shall be settled through consultation; If negotiation fails, both parties agree to submit it to Yan 'an Arbitration Commission for arbitration.
XI。 The original of this contract is in triplicate, with each party holding one copy.
Party A (official seal): _ _ _ _ _ _
Party B (official seal): _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Pipeline Maintenance Contract 2 Party A:
Party B:
Xx Property Management Company (hereinafter referred to as Party A) and xx Owner (hereinafter referred to as Party B) have reached the following agreement on the maintenance of the owner's bathroom fire pipe:
I. Maintenance time: xx, xx to xx, xx.
2. All personnel, materials and expenses required for Party A's maintenance shall be borne by Party A. ..
3. Since Party A's maintenance is carried out after Party B finishes decorating the house, Party A must be responsible for restoring the original appearance according to the original condition after the fire pipeline maintenance is completed.
Four. Before maintenance, Party A shall check, count and sign the usage of Party B's household articles (furniture, household appliances, etc.). ) (see annex). Household goods (furniture and household appliances, etc.) from Party B.. ) has been installed in place. During the maintenance period, Party A is responsible for the safety of personnel and should avoid unnecessary damage to Party B's household items (furniture and household appliances, etc.). During the maintenance period, Party A must compensate Party B for any loss caused by Party A's maintenance.
Verb (abbreviation of verb) Matters not covered in this contract shall be settled by both parties through friendly negotiation.
6. This agreement shall come into effect after being signed by both parties, in duplicate, with each party holding one copy.
Party A (official seal): _ _ _ _ _ _
Party B (official seal): _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Pipeline Maintenance Contract 3 Party A: (hereinafter referred to as Party A)
Party B: (hereinafter referred to as Party B)
In order to ensure the safety of people's lives and property and the normal operation of fire fighting equipment, once a fire breaks out, it can really play the role of automatic alarm and automatic fire extinguishing. According to the relevant national fire laws and regulations, Party A hereby entrusts Party B to maintain all the company's fire-fighting facilities ... In order to clarify the responsibilities, division of labor and cooperation, and mutual cooperation, this contract is hereby concluded through negotiation between both parties as follows:
Article 1: Name of fire fighting project to be maintained.
Fire maintenance project of Langting Building.
Article 2: Address of maintenance fire fighting project.
Wen Bin Road, Binjiang District.
Article 3: Scope of maintenance fire fighting works.
1, automatic fire alarm system;
2. Fire fighting linkage system;
3. Fire hydrant system;
4. Automatic sprinkler system;
5, carbon dioxide fire extinguishing system (including concentration alarm system);
6. heptafluoropropane fire extinguishing system;
7. Emergency lighting and evacuation indication system;
Article 4: Project duration, expenses and payment methods
The maintenance period of this fire protection system is 20 days, from xx to xx, xx, and the maintenance unit price is paid according to the original contract unit price. Payment method: 80% will be paid after the completion and acceptance of the project, and the remaining 20% will be paid three months after the completion and acceptance, if there are no quality problems.
Article 5: Entry into force of the contract
This contract is made in duplicate, one for Party A and one for Party B, and shall come into effect after being signed by the representatives of both parties and stamped with the official seal of the unit. The validity of this contract is from xx years to xx years.
Party A:
Party B:
Date:
Pipeline Maintenance Contract 4 Entrusting Party (hereinafter referred to as Party A):
Service Party (hereinafter referred to as Party B):
According to the Contract Law of People's Republic of China (PRC), through friendly negotiation, Party B is entrusted with the maintenance of Party A's fire-fighting equipment, and the following terms are reached, which please * * * abide by.
I. Project name:
leave out
Second, the project location:
leave out
Three. Entrust content:
Party A entrusts Party B to repair the automatic fire alarm/fire fighting linkage system (contract and materials).
Four. Date of commencement and termination of the agreement:
This agreement shall come into effect as of the date of signature and seal by both parties, and shall be dissolved when the maintenance fee is settled.
Verb (abbreviation for verb) Obligations and responsibilities of both parties:
1. Party A shall provide a complete set of fire protection system completion data. If the completion information is incomplete, it shall provide the fire plan or building structure diagram to ensure the smooth maintenance of Party B, including the system plan and plan of fire water system and electrical system, and the information of main fire products, etc. In the process of maintenance, if Party B needs relevant information from the original design and construction unit, Party A shall take the lead in coordination.
2. During the maintenance of some concealed works, Party B shall try its best to protect the original facilities. If it is inevitable to change the original decoration, Party A and Party B shall settle it through consultation.
Six, maintenance costs and payment and settlement methods:
1. Through negotiation between both parties, the maintenance cost of this work is xx yuan.
2. Pay the maintenance fee of% of the agreed amount within one week after the signature and seal of both parties come into effect, that is, xx yuan.
3. The agreed maintenance items are operating normally, and Party B shall pay the balance within one week.
Seven. Maintenance plan and warranty period:
Party B shall carry out corresponding maintenance work according to the maintenance standards of Party A's company to ensure the normal operation of the system; The project warranty period within the scope of Party B's maintenance is one year (in case of man-made damage, Party A will charge the main equipment fee); The quality guarantee is 5% of the maintenance cost.
Eight. Liability for breach of contract and dispute resolution:
1. Both parties shall strictly abide by their respective terms and responsibilities, and those who fail to abide by the terms shall bear corresponding responsibilities.
2. This Agreement is made in quadruplicate. For matters not covered in this agreement, both parties shall negotiate separately and sign a supplementary agreement.
3. This Agreement and its annexes are an integral part of this Agreement and have the same legal effect. Matters not covered in this Agreement, its annexes and supplementary agreements shall be implemented in accordance with relevant laws, regulations and policies of People's Republic of China (PRC).
Party A:
Party B:
Date:
Pipeline Maintenance Contract 5 Party A:
Party B:
Through negotiation between both parties, on the basis of equality and mutual benefit, Party A has reached the following agreement on contracting the fire pipe installation project of the new dormitory building and training building of Jiang Yan Vocational and Technical School, which will be constructed by Party B (this project is only contracted, not including all materials):
1, construction scope:
Party B is responsible for all fire-fighting pipelines, including installation of fire hydrants and boxes, roof ring network, roof test fire hydrants and roof water tanks, contact with school main water pipes, installation of outdoor fire truck connectors, pipe hole sleeves, etc. Party B is responsible for the excavation and backfilling of the sub-floor and reserved holes in the box.
2, quality requirements:
It must be accepted by the relevant departments.
3. Calculate the unit price:
The total cost of this project is 20,000 yuan at a time.
4. Payment method:
After the dormitory building is completed, two-thirds of the project cost of the building, 80% of the total project cost of the training building and all projects will be paid, and the balance will be paid after it is qualified.
5. Party B shall be responsible for accommodation and safety. In addition, Party B will not operate illegally during the construction of the school and will abide by all the rules and regulations of the project.
Both parties shall abide by the above five clauses. In case of violation, the breaching party shall pay the other party a penalty of 3,000 yuan. This agreement is made in duplicate and shall come into force as of the date of signature by both parties.
Party A:
Party B:
Date:
Pipeline Maintenance Contract 6 Party A:
Party B:
The installation contents of Party A's fire sprinkler pipeline contracted by Party B include: pipeline installation, nozzle installation, pipeline painting and pressure test. Repairs and openings are not included. Fire hydrants, filling sleeves and hanging holes are installed in the fire box as follows:
1. Party B must carry out the construction according to the specifications and drawings to ensure the fire control acceptance.
2, the construction process must be safe, no illegal operation, listen to the arrangement of the site construction personnel, shall not waste materials.
3. Party A is responsible for the machinery, tools, labor protection and accommodation required for the construction.
4. Labor cost: Party A shall pay Party B 20 yuan per meter for the pipeline installed by Party B, and the total amount shall be subject to the actual length of the site.
5. Specific payment method: 80% of the monthly installation progress is paid in advance, 90% of the total payment is paid after all pipelines are installed and pressure tested, and it is paid to Party B within 15 days after passing the fire control acceptance.
6. If it is necessary to modify, it must be put forward before Party B carries out the construction, and a change notice will be issued. If Party B has installed it, Party A will be responsible for the change. ..
This contract is made in duplicate, one for each party, with the same legal effect.
Party A:
Party B:
Date:
- Previous article:Basic situation of No.9 Donghai Road
- Next article:Where is Yongdeng Longshang International SOHO Assembly?
- Related articles
- Quarterly work summary (common to all industries)
- Is the first store in Xi 'an University decorated?
- Without a store, can I join the take-away platform such as Meituan?
- The omen of dreaming of Dongxing bamboo
- Where to buy Tianmen bidding?
- How about Qinhuangdao Branch of Jinbi Real Estate Co., Ltd.?
- When was Huaibei National Shopping Plaza built?
- Where is the property address of Shi Jia in Meishan Nanhu?
- Is it necessary to start with Wanda Hongjingyuan?
- What is the telephone number of the sales office of Qingyuan famous landscape garden?