In ordinary daily life, there may be some unexpected accidents. In order to improve the awareness of risk prevention and minimize losses, it is necessary to prepare detailed emergency plans in advance. How to write the emergency plan to play a better role? The following is my carefully prepared emergency plan for sudden geological disasters caused by mudslides, which is for reference only and I hope it will help you.

Emergency Plan for Geological Disaster of Sudden Debris Flow 1 1. Strengthening Organization and Leadership

1, Dadigou debris flow disaster prevention and avoidance headquarters was established. In order to facilitate the work and unified command, the Dadigou Debris Flow Disaster Prevention and Avoidance Command was established in the whole county according to the working principle of "government is responsible, on-site early warning, group prevention and group treatment" and the principle of "prevention first, strengthening monitoring, combining with the site and ensuring key points", with the Standing Committee of the county party Committee and the deputy head of the government as the chief commander, the director of the County Water and Soil Conservation Bureau, the director of the Industry and Information Technology Bureau and the secretary of the Chengguan Town Party Committee as the deputy commanders. During the flood control period, the staff and professionals of the relevant units will concentrate on transferring their work and implement a 24-hour rotation duty system.

2, the focus and requirements of the early warning work of soil trench. The duty of the headquarters office is to check before and during the flood season, to ensure the normal operation of instruments and communication equipment at the monitoring points in Dadigou, and to ensure that the water regime is uploaded and issued in time; Strengthen responsibility, clarify system and strict organizational discipline; Do a good job in organizing disaster prevention and avoidance in dangerous areas. All relevant units should also be on duty 24 hours a day, and keep in touch with the office of Dadigou Disaster Prevention and Evacuation Headquarters at any time. The personnel on duty shall ensure that they are on call and shall not shirk their responsibilities under any pretext.

Second, timely and safe guidance.

County Soil and Water Conservation Bureau is responsible for closely monitoring the precipitation and mud surface of debris flow in Dadigou. When the flood level reaches the critical value, the personnel on duty at the monitoring point should report to the Dadigou Debris Flow Disaster Prevention and Avoidance Headquarters and the county flood control headquarters in time, and inform the responsible persons of Chengguan Town, Bureau of Industry and Information Technology and Armed Forces to organize rescue teams, and conduct routine evacuation, emergency evacuation, emergency rescue and disaster prevention for the masses and relevant units in time. Major geological disasters and disaster relief should be reported to the government.

In order to ensure that the debris flow will not be dangerous and know fairly well, according to the predetermined plan, the masses will be organized to conduct an on-site drill every year to familiarize them with the evacuation location and route, and actively cooperate with the unified command of the county flood control headquarters to achieve the purpose of disaster prevention and mitigation.

Third, early warning and alarm methods.

According to the fortification standard (about 37.4 m3/s) and the requirements of early warning and forecast of flood control culvert in Mizoguchi (mosque), the early warning water level of its monitoring section is designed to be 0.85 m and 0.95 m respectively, and the method of grading alarm is adopted. When the water depth of the observation section reaches 0.85 meters, the monitoring personnel immediately report to the county flood control headquarters by telephone, and the headquarters and the Radio and Television Bureau (real-time TV broadcast and wireless broadcast) inform the organs, units and residents in the threatened area of Xiaba to make all preparations for avoiding risks; When the water level reaches 0.95 meters, the monitoring personnel will report to the headquarters quickly and send out evacuation signals and instructions. All relevant units will immediately organize rescue team members to help the people evacuate safely according to the established route.

Fourth, the evacuation and transfer location

According to the regulations of the county flood control headquarters, when catastrophic floods and mudslides occur in Dadigou, the area near the ditch mouth and mosque is the focus, and the residents near Chinese medicine hospitals and drainage channels are the non-key areas; Emergency evacuation and evacuation signals are alarms installed on the roof of Chinese medicine hospital. In case of rainstorm, evacuate the disaster area quickly when the alarm sounds. The evacuation route and location are above the mosque, Cao Jiashan, Dadi Mountain and Potou Mountain.

Verb (abbreviation of verb) reward and punishment measures

Those who have made significant contributions to the monitoring and early warning and the organization of emergency rescue work may refer to the provisions of the "County Mountain Flood Disaster Prevention Plan" and the "First-class Station Incentive Measures" for implementation and cash. Criminal responsibility shall be investigated according to law for acts that destroy the monitoring instruments and equipment of debris flow in Dadigou and soil and water conservation measures and facilities and hinder the rescue and disaster relief work.

Emergency plan for sudden debris flow geological disasters 2 1. general rule

1.65438+

1.2 This plan is formulated according to the principles of "safety first, prevention first" and "protecting people, factories and dams".

1.3 Landslide and debris flow are a kind of fluid mixed with soil, stone and water. The content of solid cuttings in this fluid is 15%~80%. It is different from ordinary mountain torrents, and its scouring and impact ability is much greater than that of mountain torrents, which often causes great harm to people's lives and property and industrial and agricultural production. According to the severity of the incident, the emergency treatment of this accident should organize some or mobilize the strength of the whole factory. The factory director is the first person responsible for the crisis management of our factory, and is fully responsible for the crisis management of our unit. The head of each department is the first person responsible for the crisis in this department. Secondary departments and individuals have the responsibility and obligation to participate in the handling of crisis events.

2. General situation

2. 1xxx The prone parts of landslide and debris flow are Qingyaling landslide, dangerous rock behind the factory building, hillside near the entrance and dam road, and hillside behind the residential building.

2.2 Qingyaling landslide is located xx kilometers upstream of the dam, and its stability directly affects the reservoir flood control and dam safety. Dangerous rocks behind the factory building, access roads and dams affect safety production and flood control. Especially the hillside behind the staff residential building, which affects the personal safety of the family members of the staff and workers in the whole factory. Doing a good job in the prevention and rescue of landslides and mudslides and making emergency plans are of great significance to the life, normal production and flood control of our factory and downstream people and units.

3. The contents of the emergency plan

3. 1 Composition and responsibilities of emergency agencies:

3. 1. 1 emergency command organization:

Team leader: factory director

Deputy Head: Party Secretary and Deputy Director of Production.

Members: plant-level leaders, deputy chief engineers, and the first person in charge of secondary units in the plant.

3. 1.2 responsibilities of emergency command organization:

1) After the landslide and debris flow accident, the emergency plan shall be ordered to start immediately according to the accident report and the procedures specified in this plan.

2) Be responsible for reporting the accident situation and accident handling progress of our factory to China Datang Power Generation Group Company.

3) After the landslide and debris flow accident, all emergency teams should immediately rush to the scene, organize emergency rescue according to their duties, and closely monitor the development of the accident to ensure the personal safety of emergency rescue personnel.

4) During the accident handling, all posts are required to be conscientious and the communication channels are unimpeded; Contact the language specification and carefully record the relevant information.

5) All units in the whole plant must clearly record the accident location, degree of harm, casualties, damage to facilities and equipment and accident handling process for future reference.

6) Termination of accident emergency treatment.

All dangers are eliminated, and normal life and production are the termination points of landslide and debris flow emergency treatment.

7) Organize and provide spare parts needed for accident recovery. Organize production vehicles required for accident recovery (excavators and bulldozers are particularly important). Organize and implement the temporary measures that must be taken for accident recovery.

8) Complete the compilation and reporting of the investigation report on landslide and debris flow accidents (causes, treatment process, equipment and facilities damage, personal injury, social and economic losses).

3. 1.3 Establish a professional emergency team.

1) militia emergency detachment (dealing with multiple accidents in groups, with individual rescue as the main task);

2) Emergency rescue commandos (handling multiple accidents in groups, mainly ensuring traffic and production facilities);

3) Emergency teams for transport vehicles, excavators, bulldozers and cranes;

4) emergency group for material support;

5) Logistics and Medical Support Group;

6) security group;

7) Communication Support Group.

3. 1.4 emergency report and communication guarantee

3. 1.4. 1 Arrange personnel to regularly inspect the parts prone to landslides and mudslides, especially during long-term rainfall and rainstorm (at least two inspectors). The front production area is the responsibility of the hydraulic branch, and the living area is the responsibility of the property department company of Longjiang Company.

3. 1.4.2 After the inspectors found the landslide and debris flow accident, they immediately reported it to the production supervisor, who issued an order according to the situation and began to implement this emergency plan. First, the production director gives the order to start the emergency plan to the relevant secondary units, and the emergency teams of various disciplines take their positions to organize emergency treatment of accidents.

3. 1.4.3 The factory director shall report to the factory director and secretary, notify the factory leaders, and organize the departments under his jurisdiction to start this plan urgently. After receiving the order, the personnel of each unit will quickly arrange their own personnel to be in place.

3. 1.4.4 The telephone number for communication shall be in accordance with the telephone directory issued by our factory. After the accident, the communication emergency team made every effort to ensure the smooth national direct dial telephone in the factory director's office.

3.2 Prevention of major events

3.2. 1 During and after the landslide and debris flow accident, the possible consequences of the accident development should be analyzed and predicted in time according to the accident investigation regulations and the requirements of our factory's measures to prevent the landslide and debris flow accident, and targeted measures should be taken in advance to prevent it.

3.2.2 Strengthen the inspection of landslide and debris flow accident-prone parts.

3.2.3 Leaders and technicians of all departments should work together with Qi Xin to take the overall situation into consideration and take timely measures to prevent the accident from expanding.

emergency response

The Group determines the focus and center of accident handling, and puts rescue and personal safety first.

3.2.5 After the accident, keep in touch with the superior department, report the accident and the progress of emergency rescue, and ask the superior department for assistance.

3.3 the start of the emergency plan

3.3. 1 Qingyaling landslide and dangerous rocks behind the powerhouse are related to reservoir flood control and dam safety, endangering the downstream and powerhouse management and the personal safety of production personnel, so daily inspections and inspections should be strengthened. Strive for the engineering treatment of dangerous rocks behind the factory building and take precautions. When dangerous stones are found slipping or falling behind the factory building, they should be reported to the production supervisor or chief engineer, who will order the employees to evacuate to a safe place according to the actual situation and start the emergency plan according to the plan start-up procedure. If personal safety is threatened, the staff can report it when evacuating.

3.3.2 The roads in the factory area and the roads on the dam affect the safety production and flood control. In particular, the hillside behind the No.6 staff residential building affects the personal safety of the family members of the staff and workers in the whole factory. These situations usually occur during the continuous rainstorm. Therefore, in the case of long-term rainfall or heavy rain, we should strengthen patrol observation and do a good job in landslide and debris flow prevention and emergency rescue. When landslide or debris flow is found, report to the production director or chief engineer immediately, and the production director or chief engineer will start the emergency plan according to the actual situation. When personal safety is endangered, the family members of employees who endanger safety can be evacuated first, and people can be evacuated to a safe place in an emergency.

3.4 Emergency response

3.4. 1 Improve family members' understanding of landslide and debris flow accidents, master the basic knowledge of the causes, characteristics, symptoms and prevention of landslide and debris flow, and improve the success rate of prevention and rescue.

3.4.2 Requirements for emergency rescue personnel, funds and materials.

After the landslide and debris flow accident, according to the severity of the situation, the emergency leading group will organize personnel to rescue or organize the whole factory personnel to rescue. Before the flood season, the production director led a team to organize the heads of various departments and technicians to carefully check the prone parts of landslides and mudslides and improve the measures. We should also prepare enough life, medical care, ambulance vehicles and other urgent needs, and all expenses will be charged as special items from the production cost.

3.5 production, life maintenance or recovery plan

3.5. 1 After the landslide and debris flow accident, the production personnel should stick to their posts without endangering personal safety, so that production and life can proceed normally.

3.5.2 The propaganda department should do a good job of propaganda in time, and the logistics department should take necessary measures to ensure the supply of materials and food, especially medical supplies.

3.5.3 According to the site recovery situation, the production supervisor announced the termination of emergency treatment of accidents, and the production order and living order returned to normal.

;