Job Recruitment Website - Property management company - Quality commitment letter
Quality commitment letter
Quality Commitment Article 65438 +0 xx residential community project is located at the intersection of xxxx extension line and xxxx*, which consists of * * floor residential buildings and * * floor residential buildings, and there is no basement.
The total construction area of 1-9# building is xxxx㎡, which is a shear wall structure, and the engineering design purpose is residence. 1 is a frame structure.
External wall thermal insulation material: the first layer is 65 thick reinforced rock wool board. 2- The top floor is made of 80-thick molded polystyrene insulation board (combustion performance B 1 grade). Each batch of materials was sampled and sent for inspection under the witness of the supervisor, and all the results of the second interview were qualified. Meet the design and specification requirements.
Employer (signature): year month day.
Supervision unit (signature): MM DD YY.
Employer (signature): year month day.
Extended reading: common causes of problems in external wall insulation layer;
1, material factors. The density of insulation board for external wall insulation should be 18~22kg/m3, and some construction units will use insulation boards below 18kg/m3, which is not enough and will easily lead to cracking of plastering mortar layer; The natural shrinkage time of insulation board in natural environment is as long as 60 days. Due to factors such as capital turnover and cost control of production enterprises, insulation boards that have aged less than seven days have been put on the wall. As a result, the insulation board continues to shrink after being put on the wall, and the plastering mortar layer adhered to the insulation board cracks.
2. Building technology. The roughness of the base surface is too large, and the adjustment methods such as adhesive layer thickness, multilayer board and surface polishing will lead to defects in insulation quality; Dust, particles and other substances on the surface of the base layer that hinder adhesion are not treated at the interface; The bonding area of insulation board is too small, which does not conform to the specification and can not meet the quality requirements of bonding area; When the rice mortar layer is exposed to the sun or constructed in high temperature weather, the surface layer loses water too quickly, resulting in cracks;
3. Temperature difference change. The thermal conductivity of expanded polystyrene board and anti-crack mortar is different. The thermal conductivity of expanded polystyrene board is 0.042 w/(m k), and that of anti-crack mortar is 0.93 w/(m k), with a difference of 22 times. In summer, when the sun shines directly on the surface of plastering mortar, the surface temperature of plastering mortar can reach 50~70℃, and in case of sudden rain, it will drop to about 15℃, with a temperature difference of 35~55℃. This temperature difference, as well as the influence of day-night temperature difference and seasonal temperature, lead to great differences in the deformation of plastering mortar layer, which is prone to cracks.
Quality Commitment Chapter II Company:
Our company solemnly promises to abide by the following clauses in the process of participating in the procurement activities of * * * * * centralized procurement products:
1. The products provided by our company meet the national or industrial product quality and technical standards, meet the product quality standards agreed in the contract, and have the technical performance that the products should have.
2. The products provided by our company meet the national or industrial standards for protecting human health and personal property safety.
3. If the products provided by our company are restricted products, the production date, safe use period or expiration date can be clearly marked in a prominent position.
4. If the products provided by our company have quality problems, our company will send relevant personnel to repair them within the time stipulated in your company's contract, and replace and install them free of charge within the time limit required by the state or promised by our company. If there are serious quality problems, we will return them.
5. Be honest and trustworthy, and do not forge or fraudulently use quality marks such as certification marks. No adulteration, no counterfeiting, no shoddy, and no passing off unqualified products as qualified products. In case of violation of the above commitments, our company agrees to take measures such as investigating our company's liability for breach of contract, rejecting our company's supply and canceling our cooperation qualification in accordance with the contract. If any personal and property losses are caused to your company or a third party due to the quality problems of the products provided by our company, our company will be liable for compensation.
Commitment party (official seal):
Legal or entrusted agent:
Date, year and month
Article 3 of the Quality Commitment Letter: This Commitment Letter is formulated in accordance with the relevant national regulations and standards in order to strengthen the management of raw materials entering the site, strengthen quality monitoring, improve the code of conduct for the use of materials and ensure the quality of the project:
1. Raw materials used in the construction site, such as steel bars, cement, pebbles, sand and additives used in structural concrete, must be sampled and sent to the testing center for re-inspection before they can be used.
2. When sampling, three parties (owner, supervisor and construction team personnel) must sample and send samples for testing at the same time.
3. If the above-mentioned raw materials that must be reinspected are used without reinspection, the company will be fined at least 20xx yuan for each discovery. And suspend the construction, re-inspection qualified rear can return to work.
4. Materials must be inspected and rechecked before use. For example, in actual construction, other types and specifications of materials are shoddy or used at will. Once found, the company will be ordered to replace the same raw materials and semi-finished products as the original samples, and will also be fined 1% ~ 2% of the partial cost.
5. If unqualified materials, semi-finished products and equipment are found to cause engineering defects and accidents, the company will be fined more than 20xx yuan 10000 yuan.
Remember this, don't have any leisure addiction!
Please rest assured the leaders of your unit!
(company name)
20xx April 10
In order to ensure the normal use of the comprehensive service building within a reasonable service life, Nantong F Cheng Jian 'an Company made the following commitments to the owner Haimen Yuelai Funeral Home during the project quality warranty period:
A, the scope and content of engineering quality warranty
The scope of quality warranty includes foundation engineering, main structure engineering, roof waterproof engineering, external wall leakage prevention, electrical pipeline and water supply and drainage pipeline.
Second quality guarantee period
The quality warranty period is calculated from the date of actual completion of the project. The quality warranty period shall be calculated separately for the projects that have passed the completion acceptance.
The warranty period is as follows:
1 Foundation and main structure engineering, that is, the reasonable service life of 50 years specified in the design style.
2. Roof waterproofing works, rooms and external walls with waterproof requirements shall be impervious for 5 years. The installation of electrical system, water supply and drainage pipeline and equipment is 2 years.
4. The renovation project lasts for 2 years.
Three guarantees quality warranty responsibility
1 For the project that belongs to the warranty scope and content, the contractor shall send someone to repair it within 7 days after receiving the repair notice. If the contractor fails to send someone to repair it within the agreed time limit, the employer may entrust other personnel to repair it, and the warranty cost shall be deducted from the quality warranty fund.
2. In case of emergency repair accident (such as running water), the contractor shall immediately arrive at the scene of the accident for emergency repair after receiving the accident notice. Accidents and rescue expenses caused by non-contractor construction quality
It shall be borne by the employer.
3. The contractor shall ensure the quality of the foundation project and the main structure within the reasonable use period of the project stipulated by the state. If the project causes damage to life and property within a reasonable use period due to the contractor, the contractor shall be liable for damages.
In addition to the foundation and main structure engineering, the contractor shall perform the warranty obligations for the items and contents within the quality warranty scope, and pay the warranty money. The project quality warranty fund is 3% of the project price paid to the warranty fund.
5 After the quality warranty expires 14 days, the employer shall return the remaining warranty money and interest to the contractor.
Quality commitment 5 1. Project name: Yan Dou New Town Phase II New Residential Building 1-3#7- 14# Project.
2. Project scope: Indoor elevator installation
3. Project address: east of Beijing-Tianjin Highway and north of South Ring Road.
In order to ensure the personal and equipment safety in daily maintenance and construction, this agreement is signed by both parties through consultation in accordance with the Regulations on Safety Supervision of Special Equipment and the National Measures for Elevator Safety Supervision and Management, in order to clarify the safety responsibilities of both parties, ensure the construction and personal health and safety, and prevent the occurrence of various safety accidents.
I. Responsibility of Party A
1. Establish and improve the elevator equipment safety management system and equipment technical files.
2 accept the safety supervision of special equipment implemented by the safety supervision and management department according to law.
3. Formulate emergency measures and rescue plans for elevator accidents.
4. Set up safety management personnel. In case of emergency, you can decide to stop using the elevator and report to the superior leader in time.
5. "Elevator Ride Instructions" should be installed in a prominent position that passengers can easily pay attention to.
6. Regularly conduct safety education and operation procedures and relevant safety rules and regulations training for property elevator maintenance personnel.
7. According to the regular inspection requirements of safety technical specifications, put forward regular inspection requirements to special equipment inspection and testing institutions one month before the expiration of the validity period of safety inspection.
2. Party B's responsibilities
1. The maintenance personnel of this unit must be seriously educated in safety technology, strengthen the concept of legal system, and improve the safety awareness and self-protection ability of employees.
2. Must implement the national laws and regulations on elevator safety, and formulate the corresponding safety management system, abide by various rules and regulations, strictly implement operating procedures and maintenance standards, and strictly prohibit illegal operations.
3. In elevator maintenance, strict safety protection measures should be taken according to relevant regulations, otherwise, if accidents are caused by inadequate safety measures, Party B will solve the responsibilities and expenses arising therefrom by itself.
4. Provide effective safety supplies for elevator maintenance personnel, such as personal protective equipment such as safety helmet, safety belt, eye mask and insulating gloves. If any accident occurs due to non-compliance, Party A will not be responsible, and Party B will bear all economic responsibilities arising therefrom.
5. The quality of tools, construction machinery and protective equipment used in this project must meet the needs of construction, and be inspected by qualified inspection units to meet safety regulations. Personal injury and equipment damage caused by improper use of tools shall be borne by Party B..
6. Elevator maintenance personnel must hold the post certificate of special equipment personnel and submit a copy to Party A for filing and preservation within the validity period.
7. In the process of maintenance, if there are casualties, electrical equipment accidents or unsafe conditions that endanger the normal operation of the elevator, you should immediately report to Party A (elevator administrator) and actively cooperate with the investigation.
8. Accept the supervision and inspection of Party A, and effectively solve the security risks raised by Party A within the time limit specified by Party A.
9. During the construction, the site shall be cleared after the work is finished, so as to ensure safe and civilized construction.
10. Be responsible for the safety performance of the elevators it maintains. After receiving the failure notice, you should immediately rush to the scene and take necessary emergency rescue measures to solve the problem.
1 1. The elevator maintenance personnel stationed at Party A's site must appoint a safety manager, who is specifically responsible for the public security and safety management of the personnel stationed at the site, and implement various fire prevention and electricity safety measures.
12. Without Party A's approval, it is strictly prohibited to carry out any form of naked flame operation without authorization.
13. It is forbidden to bring inflammable, explosive, polluting and other dangerous goods into the community.
3. This Agreement is made in duplicate, with each party holding one copy.
4. This security agreement shall come into force as of the date of signing.
Party A: Party B:
Date: Date:
Quality commitment letter 6 commitment letter
In order to further strengthen industry self-discipline, consciously standardize business practices, and effectively protect the health of the broad masses of the people, I (the unit) promise as follows:
First, strictly abide by national laws, regulations and rules, engage in business activities within the scope of permission, and bear corresponding responsibilities according to law to ensure product quality and safety.
Two, to ensure that the legal representative of the enterprise and the main management personnel to effectively raise awareness, and constantly strengthen and implement the awareness that the enterprise is the first responsible person. Take the initiative to accept the supervision of government departments, consumers and society, and improve the safety and security level of this unit.
Third, improve the management system, improve the rules and regulations, strive to improve the management level, abide by the business ethics of "honesty and trustworthiness", and ensure that the procurement channels are formal and legal, and the product quality is qualified. Put an end to unqualified products and toxic and harmful substances flowing into the society through this unit.
Fourth, adhere to the concept that consumers' personal health and safety are above everything else, always follow the value concept of "reputation is character, quality is life", do not exaggerate the facts to mislead consumers, and do not sell such goods as other commodities.
Five, establish a traceability system for purchase, acceptance and sales, and recall products in time when they may endanger personal health or safety, so as to minimize the harm.
6. Ensure that all employees have valid health certificates and training certificates.
Seven, seriously deal with consumer complaints and suggestions, to meet the requirements of consumers to the maximum extent, to be honest and trustworthy operators.
Eight, the above commitments, please supervise the community.
Commitment unit:
Person in charge of the unit:
date month year
Chapter VII Quality Commitment The products produced by our company are inspected in strict accordance with the requirements of national standards, industry standards and enterprise standards from design, raw materials, production, testing to product packaging, transportation and after-sales service, and unqualified products will never leave the factory. Invite relevant experts to the company from time to time to supervise and guide the work and strictly control the quality.
1. Raw material procurement
In order to ensure the quality of raw materials, our company purchases from qualified suppliers after strict evaluation. The incoming raw materials can be put into storage only after passing the inspection, so as to ensure that the qualified rate of storage reaches 100%. All major materials should be given priority in purchasing high-quality products from national key and designated enterprises, and the system of layer-by-layer inspection and audit and the unique batch number system of raw materials of our company should be implemented.
2. Production
In order to ensure the quality of products and strictly control all aspects of production, the quality tracking card system and production batch number system are implemented in the process of tooling. When there are quality problems in product quality, they can be traced back to teams and individuals, and corrective and preventive measures can be taken in time to make the qualification rate of the next product reach 100%. At present, our company has introduced advanced equipment and production technology, which has laid a solid foundation for ensuring the production of high-quality products.
check
The company strictly controls the inspection of products to ensure that the products that have not been inspected are not put into use and leave the factory. Our products have passed the third-party certification (CTI) of technical personnel testing and quality testing center of quality inspection department. Our inspectors check the product design drawings, the company's products and the relevant standards and quality specifications of our products from time to time every day, and issue corresponding inspection reports and relevant records after passing the inspection. At the same time, our company regularly goes to CTI testing center to test products every year.
4. Control of nonconforming products
Control of nonconforming products Our company implements three inspection systems (self-inspection, mutual inspection and special inspection) to prevent the occurrence of nonconforming products. Take effective corrective and preventive measures to eliminate actual and potential unqualified factors and prevent similar quality problems. And the quality inspection department has technicians to analyze the unqualified products in the production process, formulate preventive measures and sort out solutions.
5. Packaging and transportation
Control all aspects of handling, packaging and delivery that affect the product quality in the molding process to prevent the product from being damaged. After the products pass the final acceptance, the products shall be packaged and protected according to the relevant requirements of the mode of transportation and the signing of the contract to ensure that the products are transported to the destination intact.
6. Our company guarantees to provide brand-new products that meet relevant standards and meet the requirements of bidding documents, bidding documents and technical agreements.
7. Our products have been verified by many parties, which are absolutely environmentally friendly, safe, harmless and beautiful. We provide all our customers with the best products and services. We not only guarantee that the nose strips provided to all customers are completely high-quality and qualified products, but also we will cooperate with your work and provide the best after-sales service.
Hereby promise!
The final interpretation of this letter of commitment belongs to xxxxxxx Company!
Xxxxxxxxxxxxx company
1October 23rd 10.
In order to effectively prevent and eliminate all kinds of unsafe factors in engineering construction, implement the comprehensive management policy of "safety first, prevention first", establish the safety concept of "safety is in your heart, life is in your hands", and achieve "no harm to yourself, no harm to others, no harm to others" and "safety for me, safety for me and safety for me", our unit makes the following commitments:
First, make sure to set up construction safety (warning) signs at the eye-catching position of the entrance and exit of the construction site;
The second is to formulate construction safety management organization and safety management responsibility system, equip full-time and part-time safety officers for engineering construction projects, and conscientiously implement various construction safety management regulations;
Three, all construction workers must go through safety education and technical operation training, special type of work workers must have the corresponding technical qualification certificate;
4. Eye-catching warning signs shall be set up in key places and key parts of safety management in engineering construction;
Five, all kinds of auxiliary materials (equipment) needed in the construction should have the product certificate, the installation and use of auxiliary equipment should comply with the safety management regulations, and strictly implement the safety operation procedures;
Six, to ensure the safety of capital investment, to meet the conditions of safe production. Organize employees (including migrant workers) to participate in safety production education and training regularly, improve employees' safety awareness, ensure that employees are familiar with relevant safety production rules and regulations and safety operation procedures, master the safety operation skills of their posts, improve emergency handling ability, and prevent emergencies. Provide employees with labor protection articles that meet national standards or industry standards, and urge them to wear and use according to regulations; Participate in industrial injury insurance according to law and pay insurance premiums for employees;
Seven, in accordance with the requirements of the relevant national laws and regulations and the relevant national or industrial safety standards and norms, formulate preventive measures, effectively monitor the dangerous parts within the enterprise, put an end to the phenomenon of "three violations", and ensure that the production and business units and all links meet the safety requirements. Implement emergency measures for operating posts, and formulate emergency rescue plans and safety precautions for production safety accidents according to law;
Eight, our company is willing to consciously accept the supervision of production safety supervision departments, owners, supervisors, supervision units (people) and all sectors of society for the supervision of production safety in the construction of this project;
9. Our company is willing to take corresponding responsibilities for any safety accidents in the construction process. Name of unit (seal):
Project Manager (signature):
Full-time security officer (signature):
- Previous article:How much is the property fee of Changsha Century Jinyuan Yunchuang Center?
- Next article:Shenzhen property management fee standard
- Related articles
- Customer thank-you letter
- How about Changsha Lianqiao Real Estate Co., Ltd.?
- What is the floor area ratio of Jiangyin Zhongan Future Lane (Shunyuan Yayuan)?
- I am a girl born in February 1990. Would you please help me figure out my fate? thank you
- How much does the badminton court of Wanglaowu in Langya District of Chuzhou charge?
- Can I install broadband in 455 good residential area of Anhuai Village?
- When will Foshan build and invest in the brilliant green land?
- Is Wuxi Sanyida Xishan Qingfeng Belt well decorated?
- What is the decoration of xi Anfuxing Fitch Art City Yunxi?
- How does the old community turn into "beautiful homeland"?