Job Recruitment Website - Property management company - I'm Party A, and now the house is to be handed over. What acceptance procedures are needed, the construction unit, the property and the owner?
I'm Party A, and now the house is to be handed over. What acceptance procedures are needed, the construction unit, the property and the owner?
1 copy of land requisition notice and red line map for national construction; 2. A copy of the notice of consent to use the land; 3. A copy of the approval document for construction land; 4. Copy of fixed assets investment license; 5. A copy of the construction project planning permit; 6 city planning bureau "construction project audit book" copy; 7. A copy of the construction plan; 8. A copy of the audit opinion on fire prevention of architectural design; 9. A copy of the design scheme of each sub-project of the property; 10 copy of construction project planning acceptance certificate; 1 1 copy of the completion acceptance certificate of the construction project; 12 copy of the fire control audit opinion on the completion of the construction project; 13 copy of unit engineering quality comprehensive evaluation form; 14 copies of buried lines, inspection lines and acceptance opinions of engineering buildings; 15 copy of the use certificate of public * * * security technology prevention engineering facilities; 16 copies of completion acceptance certificates/acceptance reports of various sub-projects such as communication pipelines; 17 copy of water supply agreement and sewage discharge permit; 18 copy of power supply contract; 19 copy of power supply consent notice; 20. A copy of the application number submission form; 2 1 copy of postal customs declaration form; 22 Other relevant information
2. Property ownership information
1 demolition data; 2 copies of sales materials (owner, property right, location, construction area, etc.). ); 3 Other relevant information
3. Construction engineering technical data
1 copy of geological survey report; 2 project contracts and commencement and completion reports; 3. The original construction drawings (structure, construction, water, electricity, lightning protection, weak current, etc. ); 4. A copy of the record of the blue prints.the design; 5. A copy of the engineering design change notice (including quality accident handling records); 6 copy of concealed engineering acceptance visa; 7 copies of settlement observation records; 8. A copy of the completion acceptance certificate; 9. Copy of quality guarantee for main building materials (steel, cement, etc.). ); 10 copy of certificate of new materials and components; 1 1 mortar and concrete test block pressure test report; 12 original building completion drawing (including general layout, building, structure, water, electricity, lightning protection, weak current, equipment installation, ancillary works, concealed pipelines, etc.). ); 13 original completion drawings of other projects (greening, landscape, secondary decoration, etc. ); 14 copies of the information of the construction unit of each subdivisional work; 15 copy of acceptance sheet/test report of each subdivisional work/concealed work; 16 Other related information
Equipment information-power supply system
1 copy of power supply system equipment procurement and installation contract; 2 power supply system equipment manufacturing, installation, maintenance unit data copy; A copy of the name and address of the owner and user of the power supply system equipment; 4. Parameters of original equipment (model, quantity, weight, rated voltage, current, frequency, etc.). Such as high and low voltage distribution cabinets, transformers, DC control panels, etc.; 5. Original materials (installation instructions, technical drawings, computer room layout, product certificate, installation parts list, etc.). High and low voltage distribution cabinets, transformers, DC control panels and other equipment; 6. Original data of main accessories of high and low voltage distribution cabinets, transformers, DC control panels and other equipment (production unit, technical parameters, specifications, product certificates, etc.). ); 7 original test records and operation licenses of high and low voltage distribution cabinets, transformers, DC control panels and other equipment; 8 original data (production unit, technical parameters, specifications, test reports, product certificates, etc.). ) such as distribution box, cable, patch panel and electric meter; 9. Original materials of lamps and terminal appliances (production unit, technical parameters, specifications, product certificates, etc.). ); 10 copies of supporting devices, meters and watt-hour meters (inspection records, test reports, original data records, etc. ); 1 1 other relevant information
Five equipment information-water supply and drainage system
1 copy of contract for equipment procurement and installation of water supply and drainage system; 2 water supply and drainage system equipment manufacturing, installation, maintenance unit data copy; 3 copies of the names and addresses of the owners and users of water supply and drainage system equipment; 4 Original parameters (model, rated power, lift, quantity, etc.). ) pumps and other supporting equipment; 5. Original equipment information (installation and operation manual, maintenance manual, computer room layout, product certificate, random parts list, main parts materials, etc.). ); 6. Original records such as equipment operation inspection records, pipeline water pressure and closed water test records, water supply pipeline flushing and disinfection records; 7 copies of certificates or test records of main materials and products; 8 copies of supporting devices, meters and water meters (inspection records, test reports, original data records, etc.). ); 9 water, heating and sanitary ware inspection certificate; Original; 10 water supply contract, sewage permit and other related information.
VI Equipment Information-Elevator System
1 copy of elevator equipment procurement and installation contract; 2 copies of elevator manufacturing, installation and maintenance unit information; 3. A copy of the name and address of the elevator property owner and user; 4 original elevator equipment parameters (model, quantity, rated load, rated speed, number of passengers, elevator trip, number of landings, car and counterweight mass, machine number, etc.). ); 5. Original random data (installation instruction, maintenance manual, elevator shaft layout, product certificate, random parts list, main parts information, etc.). ); 6 original equipment installation and debugging records; 7. Original inspection records and operation licenses of elevator equipment; 8 copies of national special equipment files; 9 Other relevant information
VI Equipment Information-Fire Protection System
1 copy of fire equipment procurement and installation contract; 2 copies of information on the manufacturing, installation and maintenance units of fire fighting equipment; A copy of the name and address of the owner and user of the fire fighting equipment; 4 original equipment parameters (model, quantity, rated power of water pump, elevator, etc.). ) automatic fire alarm, fire broadcast, fire hydrant and fire sprinkler; 5 Original attached materials (installation instruction, maintenance manual, computer room layout, product certificate, attached parts list, main parts information, etc.). )
6 copies of inspection records of equipment and instrument commissioning, pipeline flushing, water pressure test and closed water test; 7 copies of certificates or test records of main materials and products of fire protection system; 8. Copy of fire control acceptance certificate; 9 Other relevant information
Seven equipment information-weak current system
1 copy of contract for purchasing and installing weak current system equipment; 2 weak current system equipment manufacturing, installation and maintenance unit data copy; 3 original equipment parameters of weak current system (system, model, specification and quantity); 4. Original information of weak current system (installation instruction, maintenance manual, product certificate, random parts list, main parts information, etc. ); 5 weak current system equipment debugging and operation inspection records, installation inspection certificate, the original national license certificate of intelligent equipment; 6. Copy of broadband access agreement; 7. Copy of cable TV and telephone agreement; 8 Other relevant information
Engineering data transfer list
Engineering data transfer list
Property name: Property location:
No. Material Name Quantity Remarks
Transmission unit:
Transferor: MM DD YY Receiving Unit:
Receiver: MM DD YY.
Engineering data transfer list
I. Property right information
□ a. Project approval document;
□ b. Land use approval document;
□ c. Building permit;
□ D. List of small business owners' names, property rights, place of residence and construction area;
Two, the municipal government to accept information:
□ a. Project completion acceptance certificate;
-B. fire engineering acceptance certificate;
□ C. Comprehensive acceptance certificate of perfect supporting office community in the city
□ d. Electricity license;
□ e. Power supply agreement;
□ f. Water use approval form and water fee collection contract; Pollutant discharge permit
□ g. License for satellite ground receiving facilities;
□ H. TV antenna certificate * * *;
□ 1. Elevator Use Certificate.
Note: The relevant companies in the city are responsible for the maintenance and acceptance of gas and telephone.
Third, the engineering and technical data
-A. Complete set of as-built drawings of buildings, structures, electrical (strong and weak electricity), water supply and drainage (including fire fighting), air conditioning, gas and other projects, as well as operating instructions and commissioning reports of various public * * * equipment.
□ b. Geological survey report;
C. project contract and completion report;
D. schedule of project budget and final accounts;
E. record of the blue prints.the design;
□ F. Engineering design change notice and technical verification sheet (including quality accident handling records);
□ g. Acceptance record of concealed works;
H. Settlement observation records and settlement observation point layout;
-a, the completion acceptance certificate;
□ J. Quality assurance of main materials such as steel and cement;
□ K. Qualification certificates of new materials and components;
□ L. Inspection certificate of water, electricity, air conditioning, heating, elevator and other equipment and sanitary ware;
□ m. Pressure test report of mortar and concrete test block;
□ n. Pressure test report of water supply and heating pipeline;
□ O. Electromechanical equipment orders contract, specifications of single equipment, test records and system debugging records.
- Related articles
- Meishan development holding co., ltd. is difficult to enter.
- What is the sales service hotline of Yuyao Chamber of Commerce Building in Shangyu, Shaoxing?
- Prevention and control measures of epidemic situation in Dream Resort of Xiangyang Overseas Chinese Town in 2022
- Property recovery
- Advantages and disadvantages of ground source heat pump central air conditioning in residential quarters
- How about Xiyuan Mountain Villa? OK or not? Is it worth buying?
- What does it mean to buy a house?
- How about Hairun Fengjing Home?
- China Pingmei Shenma Group has no branch in Shenyang and no training base in Luohe. This is a lie. I hope the victims can tell each other!
- Work content and target requirements