Job Recruitment Website - Property management company - 4 selected handover protocols

4 selected handover protocols

Now in many cases, an agreement is needed, and signing an agreement can bind both parties to fulfill their responsibilities. So do you really know how to write a good agreement? The following are four handover agreements carefully arranged by me, which are for reference only and I hope to help you. Handover agreement 1

Transferor: (hereinafter referred to as Party A) Receiver: (hereinafter referred to as Party B) The farmland transformer in the water-saving and grain-increasing project area built by Baolongshan Installation Company passed the acceptance and was handed over to.

Through friendly negotiation, Party A and Party B have reached the following agreement:

1. Party A will hand over the low-voltage power distribution equipment to Party B.

Two. Both parties * * * confirm that the handover facilities and equipment are as follows:

Number of transformers: 30kVA, 50kVA, 63kVA, 80kVA, 100kVA.

Three, the management of distribution facilities after the transfer of ownership.

Four. After this agreement comes into effect, it will be managed by Party B. ..

This agreement shall come into effect after being signed by both parties.

The responsibilities of both parties of intransitive verbs:

1. After this agreement comes into effect, all consequences (such as theft and vandalism) shall be borne by Party B. ..

Party A shall be responsible for the construction quality problems, deal with the problems in time and restore power supply. (excluding low-voltage lines)

5. This agreement is made in quadruplicate, two for each party, with the same legal effect.

Party A, Party B, responsible person, responsible person, manager, manager:

Date of signing:

Date, year and month

Chapter 2 of the Handover Agreement

Party A: Qinghai Yiqing Environmental Protection Technology Co., Ltd.

Party B:

According to the installation and operation of on-line monitoring equipment at the enterprise end of pollution sources in Qinghai Province, and in order to make the on-line monitoring system play a better role, this agreement is signed by Party A and Party B through friendly negotiation according to the document "Qing Huan Fa [20xx] No.455" issued by the Environmental Protection Department of Qinghai Province in 20xx.

1. Party A shall normally hand over and maintain the on-line monitoring equipment within the operation scope of the pollutant discharge enterprise, and temporarily hold other equipment that is not within the operation scope, such as total phosphorus, ammonia nitrogen, PH, equal ratio sampler, etc. During the storage period, Party A shall promptly report the accessories and reagents that need to be replaced.

2. After Party A requests replacement of spare parts and reagents, Party B shall provide them to Party A in time. If Party A's work is affected by the delay in providing auxiliary reagents, Party B shall bear all the responsibilities arising therefrom.

Three. Party B sends a technician to assist our technicians in maintaining the online monitoring equipment for import and export.

Four. In the process of comparison and inspection, both parties shall participate together. If the normal work is affected by the absence of either party, all responsibilities shall be borne by the absent party.

5. After the new document is issued by the Environmental Protection Department of Qinghai Province, both parties will negotiate on the transfer of new equipment according to the document of the Ministry.

This agreement is made in duplicate, which shall come into effect after being signed and sealed by both parties, and each party holds one copy.

Party A: Qinghai Yiqing Environmental Protection Technology Co., Ltd.

Legal representative:

Party B:

Legal representative:

Date of signature: 20XX year x month x day.

Chapter 3 of the Handover Agreement

Party A (Transferor): Xinjiang Guanghui Industry Co., Ltd.

Party B (receiver): Xinjiang Guanghui Property Management Co., Ltd.

According to the management requirements of the industrial sector of the Group, through negotiation between Party A and Party B, the following agreement is reached on the overall transfer of the Shijia compound, staff quarters and property personnel of the joint-stock company to Party B for management:

I. Handover matters:

1, the whole area of Stone Family Courtyard and its ancillary facilities;

2. Two family buildings and a staff dormitory;

3. Three property personnel.

Second, the handover date

1. The property management responsibilities of two family buildings and one staff dormitory building have been officially handed over to Party B since 20xx.

2. The handover date of water, electricity and heating is 20xx years.

3. The handover date of personnel and labor relations of three property personnel is 20xx years.

Three. Content of entrusted service

1. Cleaning and greening of public areas of two family buildings and a staff dormitory building, and maintenance of housing facilities, equipment and public parts.

2. Collection of property service fees, rent and utilities for two family buildings and an employee dormitory building.

Fourth, the charging standard

1. Property fee: The charging standard of the house is determined by both parties through consultation, and will be charged according to the service cost in the following payment years. According to the government guidance price, the increase will be agreed separately.

2. Dormitory rent: Dormitory rent is charged by the property management company according to the standard of 60 yuan per person per month.

3. Water fee: the water fee for residential houses shall be subject to the government water fee standard according to the actual consumption of each water meter. The water fee of the dormitory building is shared equally by the users on each floor according to the total water meters on each floor.

4. Electricity fee: The electricity fee for residential buildings is purchased by the user from the power supply department. The electricity charges of dormitory buildings shall be shared equally by users on each floor according to the total electricity meters on each floor, and the charging standards stipulated by the government price department shall be implemented.

5. When the charging standard stipulated by the price department changes, it shall be implemented according to the new standard, and the related property fees not included in this contract shall be charged separately according to the guiding price stipulated by the price department.

Four. any other business

1. Party A takes vehicles with a value of more than 400,000 yuan from Party B as the deduction of the expenses of the house maintenance and renovation project in the family area (including roof waterproofing, external wall repair, external wall insulation, unit painting, drainage well renovation, greening and other projects).

2. At the time of handover, both parties shall verify and confirm the arrears of the transferred property. Upon verification, the debts incurred before the handover shall be borne by Party A, and the responsibilities and obligations incurred after the handover shall be borne by Party B..

3. After the house is cleared, Party A will hand over the dormitory building to Party B for management. The water and electricity costs involved in the dormitory building shall be signed by both parties at the time of handover. Party A shall be responsible before the handover and Party B shall be responsible after the handover. The specific methods and standards of fee settlement shall be determined by both parties through consultation.

4. After the employee dormitory is handed over, Party B shall give priority to arranging and solving the accommodation problem of Party A's employees in the employee dormitory.

5. This Agreement is made in duplicate, with each party holding one copy.

Party A: Xinjiang Guanghui Industrial Co., Ltd. Party B: Xinjiang Guanghui Property Management Co., Ltd. Transferor: Receiver:

Date of 20 1 1 year

Chapter 4 of the Handover Agreement

Party A (recipient):

Party B (transferor): Nanjing Pukou District Agricultural Technology Extension Center.

In order to fully fulfill the contents of the construction contract signed by Party A and Party B, further clarify the safety responsibilities of Party A and Party B in the use process, protect the safety and health of relevant personnel, and prevent the occurrence of casualty accidents, this agreement is signed in accordance with the People's Republic of China (PRC) Safety Production Law and other relevant laws and regulations, and both parties shall earnestly perform it.

Based on the principle of making full use of resources and engineering facilities, Party A and Party B have reached the following agreement on the transfer of engineering assets of biogas treatment project in large-scale livestock and poultry farms.

I. Scope, duration and place of transfer

1, handover range. For details, please refer to the construction contents in the Completion Acceptance Form of Agricultural Capital Construction Projects.

2. Date of handover. Year month day.

3. Handover location. Biogas project site

Second, the rights and obligations of both parties

1. Party A shall perform the following duties

Take direct responsibility for the safety work during the use of this unit. Details are as follows:

1, organize the safety production management organization, and make clear that the responsibility lies with people.

2, training a certain number of professional and technical personnel and operators, should hold relevant certificates, serious and responsible for the work, and work in strict accordance with the operating procedures, to ensure the safe and stable operation of the project.

3. Accept Party B's knowledge training on the safe use of biogas project, and it is forbidden to operate illegally.

4. Pay attention to fire and explosion prevention during use. Flammable and explosive articles are prohibited to be stacked around biogas storage tanks, and smoking and open flames are prohibited.

The cooker should be installed in a well-ventilated and bright room. If there is any peculiar smell, open the door and open the window for ventilation immediately. No open flame at this time, close the main valve and check the air leakage point, and repair it in time.

6, regular inspection, found that the problem is corrected in time, biogas engineering maintenance, in strict accordance with the requirements of operating procedures, to prevent fire, explosion and suffocation accidents.

7. Before the thunderstorm season every year, the gas holder lightning rod must be overhauled, maintained and tested.

8, biogas storage tank emergency repair must be carried out by a professional construction team, and formulate safety technical scheme.

9. Have the right to dispose of the transferred assets (ownership, use right, safety responsibility, etc.). ) within the prescribed time limit; Have the right to decide the scope, quantity and quality of the assets transferred by the transferor. After the signing of this agreement, go through the formalities of asset receipt and confirmation within the specified time.

2. Party B shall perform the following duties

Have the right to suggest the scope and quantity of assets to be transferred. Have the obligation to cooperate with the project owner to hand over assets and assist in clearing assets; All asset information provided to the recipient is true, legal and effective.

Third, others.

This agreement is made in duplicate, each party holds one copy, which has the same legal effect. This agreement shall come into force as of the date of signature by the legal representatives of both parties.

Transferor of assets (seal): receiver of assets (signature):

(Seal)

date month year