When was the agricultural dam head in Tangnongba Village, Northeast Wuxi demolished?
Tender Notice of Three-year contiguous farmland renovation project in Nongba Village, Dongbeitang Street, Xishan District (post-qualification review)
1, bidding conditions
The three-year contiguous farmland renovation project in Nongba Village, Dongbeitang Street, Xishan District, Wuxi City has been approved by Nongba Village Committee of Dongbeitang Street, Xishan District, Wuxi City, and approved by Xishan City Administrative Examination and Approval Bureau [202 1] 123. The owner of the project is Nongba Village Committee of Dongbeitang Street, Xishan District, Wuxi City, and the tendering agency is Jiangsu Hengtai Construction Engineering Consulting Co., Ltd., and the funds required for the project have been secured. The project has met the tender conditions, and now the construction bid section of the project is subject to public bidding. Units that meet the relevant conditions are welcome to participate in the bidding.
2. General situation of the project subject to tender
2. 1 Project name: Three-year contiguous farmland improvement project in Nongba Village, Dongbeitang Street, Xishan District.
2.2 Construction site: Dongbeitang Street, Xishan District.
2.3 Project Overview: The three-year contiguous farmland improvement project in Nongba Village, Dongbeitang Street, Xishan District is located in Nongba Village, Dongbeitang Street, Xishan District, Wuxi City. This project is divided into two areas, A and B, with a construction scale of 22.7639 hectares (34 1.46 mu), and the main industrial layout is preliminarily determined as vegetable planting. Area A covers an area of 1 1.3257 hectares (169.89 mu), and area B covers an area of 1 1.4382 hectares (17 1.57 mu). The construction contents of this project include land leveling, irrigation pumping station and high-efficiency water-saving irrigation pipe network engineering construction, drainage system and supporting building construction, road engineering construction, etc. The engineering level of this project is five levels: irrigation pipe network engineering, ditch drainage engineering and irrigation and drainage construction engineering. Road projects are equal roads; All projects other than the project shall be implemented with reference to the lowest level standard. The investment is about 3.84 million yuan.
2.4 Bid division: this project is divided into 1 construction bid.
2.5 Bidding scope: irrigation pipe network engineering, ditch drainage engineering, irrigation and drainage construction engineering, roads and other projects within the bidding construction drawings and bill of quantities.
2.6 Duration: 60 calendar days. The specific commencement date shall be subject to the commencement order of the supervisor.
2.7 Quality requirements: qualified.
3, the bidding applicant qualification requirements
3. 1 Qualification requirements for bidders in construction bidding:
3. 1. 1 Qualification category and grade of construction applicant: an independent legal person with Grade III or above qualification for general contracting of water conservancy and hydropower projects;
3. 1.2 Qualification requirements of project leader: You must have the qualification of registered construction engineer with the qualification of Grade II or above in water conservancy and hydropower engineering and a valid safety production assessment certificate, and have been registered in this unit for three months, and have not served as the leader of other projects under construction, and the age is no more than 65 years old. Retired but under 65 years of age, can provide retirement certificates and related labor certificates;
Remarks: When the bidder intends to arrange the project leader to have a project under construction, he can participate in the bidding of other projects with the consent of the construction unit under construction and go through the relevant procedures. The relevant certification materials and the consent of the construction unit under construction must be submitted together with the bidding qualification documents.
(a) has completed more than 80% of the contract quantity, the main project has been completed;
(two) through the underwater (pumping station unit start-up, river water delivery) acceptance;
(three) through the contract completion acceptance;
(four) the project has the conditions for contract completion acceptance, and has submitted an application for contract completion acceptance to the construction unit, which has been confirmed by the construction unit;
(5) Work stoppage caused by reasons other than the contractor 120 days (inclusive) or more.
3. 1.3 Provide valid business license (photocopy), qualification certificate (photocopy) and safety production license (photocopy);
3. 1.4 Provide the safety production assessment certificate issued by the water conservancy administrative department (principal responsible person of the enterprise, project leader and full-time safety officer).
3. 1.5 The credit rating of the bidder's performance appraisal should be 2.2 or above (please refer to Wuxi Water Conservancy Bureau for the credit rating of the performance appraisal of the construction and supervision units in 2020).
3. 1.6 provide the audited financial report of the bidder in the last three years (20 18 ~ 2020) (newly established enterprises only need to provide the audited financial report or capital verification report of the year of establishment), and the financial audit report reflects that there was no loss in the previous year;
3. 1.7 Provide social insurance certificates paid by all members of the bidder's project department (including at least the project director, technical director, documenter, builder, quality inspector, safety officer and material engineer, with a list of project department members attached). For proof of social insurance, please refer to the Employee Pension Insurance Manual (attached as 202 1 -202 1).
3.2 The consortium bid is not accepted in this tender.
4. Announcement and registration requirements and acquisition of bidding documents:
4. 1 Announcement time: July15,202 1 to July 2 1, 21.
4.2 The bidder shall carry the company's business license, qualification certificate, safety production license, registered constructor certificate of the project leader and effective safety production assessment certificate, the audited financial report for 20 18 ~ 2020, and all members of the project department (including at least the project leader, technical leader, documenter, builder, quality inspector, safety officer and material engineer, with a list of members of the project department). A copy of the original social insurance certificate and other supporting materials that meet the qualification requirements of the above-mentioned bidders shall be stamped with the official seal of the unit and registered with the bidding agency to purchase the bidding documents, and the copies shall be bound into a book. The time is from 202 1 to July 7, 2002/kloc-0 from 9: 00 am to 6: 00 pm/kloc-0.
Place of sale of bidding documents: Jiangsu Hengtai Construction Engineering Consulting Co., Ltd. (No.382, Chunjiang Garden Phase III, Dongting Street, Xishan District, Wuxi City).
4.4 Any bidder who buys the tender documents cannot attend the bid opening for some reason, and shall notify the tenderer in writing 48 hours before the bid opening, otherwise it shall be handled according to the Measures for the Administration of Integrity of Water Conservancy Projects in Wuxi.
5. On-site reconnaissance: self-reconnaissance.
6. Bid opening
6. 1 The deadline for submission of bidding documents (bidding deadline, the same below) is 2021July 26th 14: 30.
Venue: Meeting Room of Dongting Sub-district Office of Xishan District People's Government, Wuxi.
6.2 The tenderee will not accept the bid documents delivered late or not delivered to the designated place.
6.3 This project adopts post-qualification review, and only qualified bidders can enter the next round of review.
7. Contact information
Tenderee: Nongba Village Committee of Dongbeitang Street, Xishan District, Wuxi City
Contact: Zhang Gong
Bidding Agency: Jiangsu Hengtai Construction Engineering Consulting Co., Ltd.
Address: No.382, Zone C, Chunjiang Garden, Dongting Street, Xishan District, Wuxi.
Contact: Zhou
- Related articles
- Who is responsible for the loss of electric vehicles after paying the property fee?
- Hefei High-tech Construction Investment Group Co., Ltd. Group Industry
- What is the telephone number of the marketing center of Weifang Smart Agriculture Headquarters Store?
- How much is the house price in Liaocheng Canal City?
- What are the risk areas in Shenyang?
- Bayu impression
- Registration time for property manager exam in 2023
- Is Xiao Chun on the lakeside of Lishui Zhicheng worth buying?
- What is the price of Yingkou Qinheyuan Hot Spring Pension Industrial Park?
- Service Concept of Fuzhou Changle International Airport