Job Recruitment Website - Property management company - Home improvement process: a detailed guide

Home improvement process: a detailed guide

Decoration is a headache, especially for friends who are renovating for the first time, and they feel that they can't start. In order to avoid problems in the decoration process, it is very important to know the decoration process in advance. Below, I will explain the process of home improvement in detail and give you a clear guide!

Demolition and reconstruction

First, see if demolition is needed. Don't forget to transport it to the garbage point designated by the property after demolition.

Hydropower transformation

Next, hydropower transformation, position design, slotting, pipe threading, and then fixed with quick adhesive powder.

Bricklayer link

In the bricklayer's link, the wall tiles of kitchen, bathroom and balcony should be laid first, then the floor tiles of bathroom and other rooms should be laid. If you don't lay bricks, remember to level the ground.

Woodworking link

Woodworking links include making background walls and ceilings. If the cabinet is made on site, it is finished at this time.

Petroleum engineering link

In the petroleum industry, plaster line is pasted on the top of the wall, putty is scraped, sandpaper is played, and latex paint is sprayed or brushed. If wallpaper is pasted, the wall with primer can be pasted without paint.

Installation link

Finally, the installation link, including wooden doors, sanitary ware, cabinets and other installation. Before each project starts, if you buy your own materials, remember to purchase them in advance. Lack of materials may delay the construction period.