Job Recruitment Website - Property management company - Super cost-effective hydropower renovation strategy. The decoration company won't tell you.

Super cost-effective hydropower renovation strategy. The decoration company won't tell you.

Hydropower transformation is the first step of the whole decoration, and quality should be the premise of saving money anyway. On the basis of respecting this premise, according to personal needs, we can control the materials needed in the decoration, or refer to the neighbors of the same type and choose those that must be transformed and those that will not be transformed. Resolutely use every penny. We should not only understand some hidden details in hydropower transformation, but also strive to spend every penny in useful places, and also prevent the tricky and tricky decoration. You can apply for Tuba rabbit decoration insurance. Now there are three guarantees for decoration insurance: professional supervision and quality inspection, 100% fund custody, and quick rights protection!

? Hydropower transformation process

1, by room? Design? Figure and customer's specific needs for hydropower design.

2, workers according to the direction of the wall or the ground slot.

3. Bury pipes (including wiring and connecting pipes) and cassettes.

4, detection circuit, waterway pressure test.

5. Smooth the trunking with water and silt ash.

6, such as painting the wall or? Wallpaper? After laying, install the circuit board.

Details of hydropower transformation

1, waterway design should first consider all water-related equipment, such as water purifier, water heater, kitchen treasure, toilet, washbasin, etc. Their locations, installation methods and whether hot water is needed; It is necessary to make good use of gas or electric water heaters in advance to avoid temporary replacement of water heaters, which will lead to repeated reconstruction of waterways; The washbasin, toilet and toilet are reserved in the bathroom. Washing machine? It's best to pick one outside the water outlet to facilitate the mop after receiving water.

2、? It's the first time for a cabinet manufacturer to come to the door, so it's best to bring together the construction master who changed the water and communicate face to face. Before construction, the upstairs should be waterproof to ensure that there is no water seepage downstairs before construction.

3. After waterway reconstruction, suppression experiments should be done. The fireman reminded me to press 6 to 8 atmospheres with a press to keep it from leaking for 30 minutes. It is best to have a property on the scene to suppress the test, which can play a supervisory role; Because there is? Decoration? The team will cheat the owner at this stage.

4. After the kitchen and bathroom floor tiles are laid, check whether the floor drain is unobstructed (the drainage speed after removing the floor drain cover shall prevail, because most deep-water sealed floor drains have the problem of slow drainage); If you want to close the redundant floor drain, you must block the gap between the drain pipe and the floor drain to prevent water from overflowing;

5. It is best not to use deep-water sealed floor drain for washing machine floor drain, because deep-water sealed floor drain has a common feature of slow launching, which is used for deep-water sealed floor drain in shower room and other positions. Floor drain can basically meet the drainage demand because of the small amount of water; However, the drainage speed of washing machine is very fast, which can not reach the drainage speed of deep-water floor drain at all, which directly leads to water overflow.

Problems needing attention in hydropower transformation

1, when doing the above operations, it mainly involves slotting, which is generally the work of masons. But if there is a cutting machine, the plumber can do it very conveniently. Slot alignment involves bricklayers. Therefore, from the operational process, it is the cross operation of three types of work. If you are yourself? Decoration? Instead of a decoration company, we should pay attention to coordinating their cross-operation and mutual cooperation.

2. Wires should be conventional products, and conduits and cassettes must be flame retardant. Because it is a concealed project, we can't be careless.

3. On the waterway, water pipes should also be regular and reliable products. Either way, it must be reliable. The pressure test shall be carried out in strict accordance with the standards.

4. For weak video cable, it must be a thick core double shielded cable. Telephone lines and network cables should not be sloppy.

5. Try to use large caliber sewage pipes to avoid right angles. The distance from the gas pipe to the cooker and water heater should be as short as possible, preferably no more than 2 meters.

Saving money strategy in hydropower transformation

Hydropower renovation costs should include:

1. Various pipelines (hot and cold water) and various lines (including power lines, televisions, telephones, computers, etc.) are embedded. ).

2. Installation of various sanitary wares, lighting lamps, switches and sockets in the later period. According to the size of your home, the price should be around 2500 yuan. If it exceeds 3000 yuan, you should consider it.

20 14 saving money strategy for hydropower transformation of living room

The living room usually includes? The transformation of the double control circuit of the living room lamp. During the transformation, the living room lamp is directly set up in the corridor, which is convenient for turning on the light for lighting when getting started. Other circuit transformation depends on the design, generally the transformation of the dining room panel, and? Is the transformation of the panel at the TV cabinet in the living room. The strategy of saving money is to make life as easy as possible, and some unnecessary circuit modifications can be omitted. There is also a bedroom circuit transformation, saving money strategy, you can pass the bedside lamp without changing it? For dual control, of course, it can also be changed according to personal preferences.

20 14 saving money strategy for bathroom hydropower transformation

Generally, the renovation of bathroom waterway should consider the renovation of bath bully, exhaust fan and lighting, and then the electric water heater will be transformed from open pipe to concealed pipe waterway and circuit. The strategy of saving money in bathroom is in washbasin, and the water pipes can be concealed without changing concealed pipes, because there will be washbasin and bathroom cabinet.

Saving money strategy in hydropower transformation

There are many changes in the hydropower transformation of general kitchens. After all, there are many applications of electrical appliances in the kitchen, so it is necessary to set aside the power board of the range hood and enough places for small household appliances. If the washing machine is also put into the kitchen, it is also necessary to change the position of the waterway.

The above is the relevant content of hydropower transformation, I hope it will help everyone! Tubatu decorative net, the leader of the whole industry.

Tubatu Online provides you with "every decoration quotation, 1-4 local decoration companies, 3 sets of decoration design schemes" and the decoration pit avoidance strategy for free! Click this link:/Zhu Ye /zxbj-cszy.php? to8to _ from = SEO _ zhidao _ m _ jiare & amp; Wb, you can get it for free ~