What are the main points of Wuxi decoration knowledge?

Steps 1 design consultation

1. measuring room.

2. Design scheme.

3. Confirm the plan and communicate the products needed for home.

4. Sign the house renovation contract.

5. Pay the down payment.

Step 2 Before construction

1, design, construction site disclosure, property procedures.

2. Fill in the Long Zhe service flow chart and the site engineering quantity approval form.

3. Carry out demolition construction and tidy up the site.

4, material approach, acceptance.

5. Measurement of cabinets, bathroom cabinets, furniture and finished wooden doors.

6. Purchase household goods according to the service flow chart and refer to it.

7. Delivery within the construction time.

8. Construction and acceptance of concealed works.

The third step is medium-term construction

1, hydropower pipeline completed.

2. Tile comes into play, bricklayer handles at the grass-roots level, and the kitchen wall brick is constructed.

3. Paste is basically completed.

4, cabinets, bathroom cabinets, furniture retest (wooden door retest when necessary)

5. Woodworking is closed.

6, carpentry ceiling material comes into play, construction.

7, hardware materials approach, installation.

8. Customized product signing.

9. Basic treatment of oil workers.

10. Interim acceptance, interim payment and increase or decrease.

Late stage of construction

1, oil worker building.

2. Non-woodworker ceiling materials shall enter the site for construction.

3. Laying of floor, wallpaper and radiator products.

4. Installation of wooden doors, cabinets, bathroom cabinets and furniture.

5. Sanitary ware, lamps and electrical materials are installed in the site.

6. Self-inspection and cleaning.

Step 5: Completion acceptance

1, self-check cleaning.

2. Pay the balance and apply for warranty.