Excuse me, what is primary embedment and secondary embedment in hydropower installation?
2. The secondary embedment refers to the things that still need to be put into the civil construction after the completion of the civil construction, and then put into the civil construction again by drilling holes, which is the secondary embedment, as follows:
Extended data
"Civil engineering" refers to civil engineering construction, including the construction of buildings, structures and engineering objects in houses, roads, railways, airports, bridges, water conservancy, ports, tunnels, water supply and drainage, protection and other facilities and places. Above ground, underground, land, water and underwater, including survey, design, construction and maintenance in the process of engineering construction.
procedure
1, cushion
Familiar with the construction drawing → Look at the planning red line → Check the leveling point → Tower crane foundation construction (set the water collecting ditch) → Measure the original landform elevation → Protect the positioning pile → Install the tower crane (apply for installation) → Release the excavation line → Technical disclosure → Mechanical excavation → Pay-off → Manual excavation leveling → Measure the elevation of the pile head and mark it → Break the pile head → Check the size and strain → Check the geosyncline → Pay-off → Woodworking formwork → Cushion.
2. Foundation
Positioning and setting-out of foundation column → technical disclosure → carpentry shuttering → binding of bearing platform reinforcement → positioning of bearing platform reinforcement by electric welding → positioning of column reinforcement → embedding of water and electricity → foundation concrete → formwork removal → cleaning → foundation acceptance → earthwork backfilling.
3. Installation of external frame
Technical disclosure → hardening of outer frame → drainage ditch → collecting ditch → erection of outer frame → hard sealing → hanging safety net → acceptance of outer frame.
4, the main body
Positioning and setting-out of main column → technical disclosure → column rebar binding → copying horizontal line (1m relation line) → water and electricity embedding → carpentry shuttering → plate rebar binding → water and electricity embedding → inspection (vertical, geometric dimensions and nodes) → concrete pouring → maintenance → formwork removal → cleaning → masonry 1m rice noodle → concrete strength detection.
5, masonry
Setting-out of masonry → technical disclosure → rebar planting → rebar planting pull-out detection → windowsill formwork support → windowsill concrete → laying bottom brick → precast concrete lintel and concrete block → laying aerated block → placing Rachel rebar → checking flatness → windowsill capping formwork support → removing windowsill capping formwork → laying precast concrete block → placing 1 m building concrete lintel →
6. Gypsum technology
Technical disclosure → hanging steel wire mesh on the external wall → wetting water → throwing slurry → plastering ash cake → corner protector → handing over the hole → installing doors and windows → wetting water → plastering rough surface ash → plastering ash → curing → plastering brick → jointing → cleaning → pasting doors and windows.
7, outside the frame demolition
Notice of regular meeting → technical disclosure → Rachel's internal pulling → Rachel's drilling → Rachel's oxygen cutting → Fine stone concrete repair → Brick patching and paint patching → Safety net removal → Facade inspection → External wall acceptance → Outer frame removal → cleaning.
8. railings
Technical disclosure → structural embedment → erection and installation → pendant installation → wooden handrail installation → wooden handrail painting → cleaning.
9. Roof cover method
Technical disclosure → water and electricity installation → hanging holes → manual cleaning →R angle → structural water stop → grass-roots handover → waterproof construction → waterproof water stop → waterproof handover → mortar leveling → insulation board → installation →PVC vent pipe → embedded parts → 4 @ 200× 200 steel mesh → joint width 10@6000×6000.
10, floor
Technical disclosure → water and electricity suppression → ground mechanical cleaning → wet water → ash cake → slurry sweeping → pouring → maintenance → cleaning → ground installation.
1 1, wall brick
Technical disclosure → water and electricity suppression → typesetting → road finding → paving → cleaning → jointing → cleaning → kitchen and bathroom ceiling → sanitary ware installation → cabinet installation → hardware installation.
12, floor tile
Technical disclosure → water and electricity suppression → water and electricity installation → hanging holes → marble sill stone installation → manual cleaning →R angle (with waterproof requirements) → structural water stop → grass-roots handover → waterproof construction → waterproof handover → typesetting → finding a way → paving → cleaning → jointing → cleaning.
13, interior door
Technical disclosure → drilling → nailing cork → installing bottom frame → installing door cover → installing surface → installing door leaf → installing door lock → cleaning.
14, ceiling
Technical disclosure → water and electricity suppression → elastic line → drawing keel step line → installing main keel suspender → installing main keel → installing secondary keel → concealed acceptance → installing gypsum board → painting antirust paint → installing layering → cleaning.
15. Dismantle the passenger and cargo elevator
Demolition → Close the passenger and cargo elevator (for demolition)
16, entrance door
Technical disclosure → drilling → nailing screws → installing door frames → installing door leaves → installing door locks → cleaning.
17, hydropower
Technical disclosure → Foundation embedment → Main body embedment → Masonry slotting → Installation of junction boxes, conduits and water pipes → Grooving → Pressing → Installation of risers → Hanging holes → Indoor threading → Installation of lamps and lanterns → Electrical testing.
18, property acceptance
Sub-item acceptance → ceramic tile → paint → floor → suspended ceiling → plastic steel doors and windows → interior door → entrance door → cabinet → railing → marble → special acceptance → suppression → ball passing → water collection → water spraying → electricity inspection.
Pipe network construction → garden construction
19, acceptance before delivery
Filing → pre-acceptance → rectification → site opening → rectification → acceptance → key collection.
20.delivery
Deliver the license → Determine the delivery time → Arrange the personnel and tools of various types of work → Deliver → Rectify → Turn-key.
Baidu encyclopedia-civil construction
- Related articles
- How about Pingyu Hengding Property Service Co., Ltd.?
- How to write the business scope of tourism development investment company?
- What is the telephone number of the marketing center of Jingzhou Jiaotou Jingzhou Development Building?
- Does Jinding see if the house will be rotten?
- Where is Shangyuan in Hechuan Jiangcheng?
- What are the due diligence companies of key domestic enterprises?
- Where is the future property address of Hefei Bangtai Wancheng Binhu?
- Hezhou Meiyu Tile Shop Address
- Guard employment contract
- Excuse me, is there any regulation on the distance between the outdoor unit of household air conditioner and the neighbor's house?