Job Recruitment Website - Property management company - How to write the style of residential quality guarantee
How to write the style of residential quality guarantee
Content of the residential quality guarantee: 1, and the title of the guarantee is clear; 2. Briefly introduce the housing situation; 3. Building area; 4. Relevant qualification certificates; 5. Acceptance criteria; 6. Effective date of signing; 7. Signature and seal of guarantor or unit.
Model essay on housing quality assurance 1
In line with the principle of being responsible to residents and society, our company makes the following quality assurance and commitment to the structure, components, facilities, supporting facilities and maintenance of the house.
1. The residential building area is _ _ _ square meters, of which the public * * * building area is shared by _ _ _ square meters.
Two, the residential system is designed by a qualified unit and approved by the relevant government departments.
3. The residence has passed the acceptance of the municipal, district (county) construction engineering quality supervision department.
Four, this house since the date of signing the delivery, under normal use, all parts.
Maintenance content and warranty period:
1. Roof waterproof layer for 3 years;
2. Leakage of walls, floors (including kitchen and bathroom floors), basements and pipelines 1 year;
3. 1 year plastering of indoor wall and ceiling falls off and cracks appear (except temperature cracks of top wall);
4. The indoor ground is hollowed out and cracked, with a large area of sandstorm 1 year;
5. Incorrect installation of doors and windows leads to warping and hardware damage 1 year;
6 water supply and drainage, sanitary ware, electrical switches and similar appliances for half a year;
7. The pipeline is blocked for 2 months.
5. For quality problems caused by improper use or unauthorized change of structure, equipment, pipeline position and improper decoration of residents, the Company will not assume warranty responsibility; If the quality of the house is damaged or other users lose, the responsible person shall bear the corresponding responsibility.
Six, after the completion of the residential, normal use under the prescribed service life, identified by the relevant professional departments of the city, is a dangerous house will be returned or replaced.
7. After the residents move in, our company will directly or entrust the property management company to give a written reply, and properly handle the letters, visits and complaints about the housing quality.
Eight, such as the company's reply or dispute handling, all residential engineering quality problems, can apply to the local and municipal construction engineering quality supervision stations for coordination; Involving the quality of residential supporting construction, it shall apply to the local municipal housing construction department for coordination.
Nine. Other contents that the company is willing to commit (omitted).
X this letter of guarantee is provided when the house is delivered for use. as an annex to the house sales contract, it has the same legal effect as the contract.
Guarantor:
Legal representative:
Date:
Company address:
Contact person:
Telephone:
Postal code:
Property management company:
Contact person:
Contact telephone number:
Model essay on residential quality assurance II
Dear residents:
Thank you for purchasing the commercial housing developed and built by our company, in order to protect your rights and interests, promote our company to continuously improve the development quality and do a good job in after-sales service of commercial housing; At the same time, in order to guide you to make better use of the commercial housing developed and built by our company, according to the Regulations of the State Council on the Administration of Urban Real Estate Development, we implement the system of quality guarantee and instruction manual for commercial housing. Please cooperate closely and welcome your comments and suggestions on our work.
Address of real estate development company: address of property management company:
Sales contact: Property Management Office:
Tel: Tel:
Development Company: (Seal) Management Company: (Seal)
Year, month, year, month, year
Our company has made the following quality assurance commitments for the commercial house with a building area of square meters, which is a unit house in the _ _ _ district of Xi City:
1. The commodity house project passed the completion acceptance organized by Xi Urban and Rural Construction Committee on.
Second, the commercial housing project is supervised by Xi 'an _ _ District Quality Supervision Station. In the process of construction, the construction is always carried out in accordance with the relevant national norms, regulations, quality standards and design requirements.
Three, this commodity residential project from the date of completion and acceptance, in the case of normal use of households, the company free of charge during the warranty period to undertake the maintenance responsibility of the following items (see table), and is responsible for the maintenance within the promised period.
Four, according to the national housing construction project quality warranty measures, housing construction project warranty period is calculated from the date of completion and acceptance; If users find quality problems during use, they can directly call our company's maintenance telephone number or fill in the attachment "Commodity House Quality Feedback Form" and send it to our company. Quality problems caused by improper use by residents or improper home decoration and irresistible natural disasters are not covered by our company's warranty.
5. After the residents move in, the company will directly (or entrust the property management company) to give a timely reply and properly handle letters, visits and complaints about the quality of commercial housing. If you are not satisfied with the work of our service personnel, you can complain directly to our company (or property management company). We will deal with it in time.
Six, if there is any dispute about the company's reply or handling of the quality problems of commercial housing projects, it can apply to the local construction engineering quality supervision station for coordination according to the relevant provisions of the Regulations on the Administration of Urban Real Estate Development in the State Council and the Measures for the Quality Assurance of Housing Construction Projects of the Ministry of Construction; All the problems related to the outdoor supporting of commercial housing can be applied to the local construction administrative department for coordination according to the relevant provisions of the State Council's Regulations on the Management of Urban Real Estate Development and Operation. If there are still differences on the coordination opinions, you can apply to the local arbitration commission for arbitration.
Seven, identified by the provincial and above professional quality appraisal department, where the foundation and main structure are unqualified and beyond repair, our company will return a house or change rooms.
8. As an annex to the commercial housing sales contract, this quality guarantee is a legal document for the company to bear the responsibility for the quality of commercial housing, and has the same legal effect as the sales contract. Please take good care of it and do not forge or alter it.
The warranty period stipulated by the state and the warranty period promised by the company for a series of maintenance projects.
1, roof waterproof for 5 years.
2, metope, kitchen, bathroom floor leakage for 5 years.
3, metope, ceiling plaster fall off for 2 years.
4. The ground was hollowed and cracked, and large-scale sanding took 2 years.
5. The pipeline is blocked for 6 months.
6. Heating and cooling systems and equipment have two heating and cooling stages.
7, sanitary ware for 2 years
8. Electrical piping for 2 years
Model essay on residential quality assurance 3
Party A (Seller): Party B (Buyer):
The real estate (building area: square meters) located in Unit # Building # of urban (town) road (street) residential project is developed and newly built by Party A and sold to Party B. In order to strengthen the quality management of commercial housing, ensure the quality level of after-sales service of commercial housing and safeguard the legitimate rights and interests of consumers of commercial housing, according to the Ministry of Construction [1998] 102 "On the implementation of residential quality warranty for commercial housing"
A, when the project is completed and accepted, the quality grade of the project will be evaluated by the experience group, and the completion acceptance filing formalities have been handled. Under normal use conditions, according to the design documents and relevant regulations, the reasonable service life of the house is years. In the normal and reasonable service life, if there are quality defects that endanger the safety of the structure, Party A shall fulfill the warranty obligations and assume the warranty responsibilities.
Two. Under normal use, the warranty content and warranty period of the following parts of the commodity house are as follows:
1, anti-leakage warranty period for roof wall, basement, kitchen, toilet, toilet floor, pipes, etc. It is 5 years;
2. The plastering surface of the wall and ceiling falls off, the ground leveling base or cement mortar surface is hollowed and cracked, a large area of sand and doors and windows are tilted, and the hardware and other spare parts and sanitary ware do not meet the standard requirements. The warranty period is 2 years;
3. The warranty period of heating and cooling system and equipment is 2 heating and cooling cycles;
4. The quality warranty period of lamps, electrical switches and pipelines is half a year, and the warranty period of other parts is 1 year;
5. After the commercial house is sold, the property management company entrusted by Party A is responsible for the maintenance and management;
6. Party A delivered the commodity house to Party B for use on, and Party B recognized that the equipment and facilities of the house were in normal operation at the time of delivery. Party B shall be responsible for the maintenance of facilities and equipment added or modified by itself after acceptance. The warranty period is calculated from the date of completion acceptance, that is, year, month and day.
3. During the warranty period, if the owner, user or the third party suffers personal or property damage due to the quality defects of the residential project, Party B may claim compensation from Party A, and Party A shall recover compensation from the responsible party for the quality defects of the commercial residential project. If the warranty fails to timely cause new personal and property damage, the responsible party shall be liable for compensation; Quality defects caused by Party B's improper use, such as unauthorized change of structure, improper decoration of equipment location, or other three parties and force majeure, are not covered by Party A's warranty.
Party A (seal): _ _ _ _ _ _ Party B: _ _ _ _ _ _ _
Legal representative: _ _ _ _ _ _ Legal representative: _ _ _ _ _ _ _ _ _
Tel: _ _ _ _ _ Tel: _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ City Construction Engineering Quality Supervision Station System
Model essay on residential quality assurance 4
PromulgationNo.: _ _ _ _ _ _ _ Date of promulgation: _ _ _ _ _ _ _ _ _ _ _ Date of promulgation: _
Article 1 In order to standardize the sales behavior of real estate development enterprises, strengthen the after-sales service of commercial housing, safeguard the legitimate rights and interests of housing consumers, and promote the healthy development of the housing consumer market, these Measures are formulated in accordance with relevant national, provincial laws, regulations and policies.
Article 2 These Measures shall apply to real estate development enterprises that have obtained the business license of the industrial and commercial department and the development qualification certificate issued by the Provincial Construction Committee.
Article 3 The term "commodity housing" as mentioned in these Measures includes high-grade housing such as villas and high-grade apartments, ordinary commodity housing, low-profit housing (affordable housing) and housing for housing projects.
Article 4 When selling (including pre-sale) newly-built commercial houses to users, real estate development enterprises must provide the quality guarantee letter of commercial houses and the instructions for the use of commercial houses.
Fifth commercial housing quality guarantee is the basis for real estate development enterprises to bear the quality responsibility for the commercial housing sold, and real estate development enterprises shall bear the warranty responsibility according to the agreement and commitment of the commercial housing quality guarantee.
"Commercial Housing Quality Guarantee" should be an annex to the commercial housing sales contract.
Sixth "commercial housing quality guarantee" shall include the following contents:
First, the engineering quality supervision department to check the engineering quality level;
Second, the residential structure is guaranteed to be used for life according to the design life;
Three. The warranty content and duration of each component under normal use:
1, roof waterproofing works shall be no less than 3 years;
2, civil engineering is not less than 1 year, including:
Leakage of walls, kitchen and bathroom floors, basements and pipes;
The plastering layer on the wall and ceiling falls off;
The ground is empty and cracked, and there is a large area of sandstorm;
Cracked doors and windows, damaged hardware;
3, sanitary ware, not less than 1 year;
4, electrical pipelines, water supply and drainage pipeline installation project of not less than 6 months;
5, pipeline blockage, not less than 2 months;
6. The cooling and heating system and equipment are 1 heating period and cooling period;
7. Others (agreed by real estate development enterprises and users themselves);
Four, the specific time for the development enterprise to deliver the commercial housing to the user;
Five, the user repair unit and the time limit for reply and processing;
6. Conditions for checking out due to quality reasons;
Seven. Solutions to quality warranty disputes.
Seventh commercial housing pre-sold by development enterprises shall be subject to the supervision and inspection of users in the construction process before completion acceptance and delivery.
Article 8 When a real estate development enterprise delivers a commercial house to a user, it shall have a week for the user to accept it. During the acceptance period, real estate development enterprises should solve the quality problems of equipment and facilities in time.
Article 9 The instructions for the use of commercial housing shall explain the structure and performance of the house, the types, performance and standards of various parts (components), and put forward matters needing attention in use, which shall generally include the following contents:
1, development unit, design unit, construction unit, entrusted supervision shall indicate the supervision unit;
2. Structure type;
3. Precautions for decoration and decoration;
4, water, electricity, gas, heat, communication closed-circuit television and other facilities configuration;
5. Description of equipment installation reserved position and installation precautions;
6. Types of doors and windows and precautions for use;
7. distribute the load;
8. Other issues that need to be explained.
Tenth residential equipment, facilities, etc., should be attached to the "commodity housing manual".
Eleventh "commercial housing quality guarantee" and "commercial housing instructions" should be delivered to users at the same time.
Article 12 The Certificate of Commodity House Quality and the Manual of Commercial House Use shall be issued in sets and buildings, and each set and building shall be accompanied by its own Certificate of Commodity House Quality and Manual of Commercial House Use.
Thirteenth residential warranty period is calculated from the date when the development enterprise delivers the residence to the user, and the warranty period shall not be less than the period specified in Article 5 of these Measures. Real estate development enterprises can extend the warranty period.
Article 14 A real estate development enterprise shall prompt the rational use, maintenance and maintenance of commercial housing in the instruction book. If the user improperly uses or arbitrarily changes the structure, equipment location and improper decoration, the development enterprise will not bear the warranty responsibility; If the house quality is damaged or other users lose due to improper use or unauthorized modification of the structure, the responsible person shall bear corresponding responsibilities.
Fifteenth by the provincial and above qualified appraisal and testing departments, residential structure quality is unqualified and can not be repaired should be returned.
Sixteenth other residential and non residential commercial housing, can refer to these measures.
Seventeenth approach by the Provincial Construction Committee is responsible for the interpretation of.
Eighteenth these Measures shall come into force as of _ _ _ _ _.
Model essay on residential quality assurance 5
Recently, it was learned from the Municipal Construction Committee that after the delivery of commercial housing, if the purchaser thinks that the quality of the main structure is unqualified, he can entrust the engineering quality inspection agency to re-approve it in accordance with relevant regulations; After verification, the structural quality is indeed unqualified, and the purchaser has the right to return a house; If losses are caused to the purchaser, the development enterprise shall be liable for compensation according to law. The letter of guarantee in use does not specify the time to reply to the terms of letters and visits from buyers who find quality problems after staying. The revised "Guarantee" which will be implemented soon clearly stipulates that within 3 days after receiving the letter and receiving the visit, the developer must directly or entrust the property management company to send personnel to reply and repair.
The new letter of guarantee clearly stipulates that from the date of issuance of the letter of guarantee, eight items will be guaranteed free of charge under the normal use of the buyer, including:
1, heating or cooling system, ensuring two heating or cooling cycles.
2. The electrical pipeline and water supply and drainage pipeline are guaranteed for two years.
3, metope, ceiling plaster layer off warranty 1 year.
4. Warranty for hollowing and cracking of the ground and large-area sanding 1 year.
5. Warranty for cracked doors and windows and damaged hardware 1 year.
6. The pipeline was blocked for two months.
7, sanitary ware warranty 1 year.
8. Lamps and electrical switches are guaranteed for 6 months.
The above is what Bian Xiao shared today, and I hope it will help everyone.
- Related articles
- What does a micro housekeeper do?
- What about Sanming Rongcheng Investment Co., Ltd.?
- How to get to Greenland Century City from Pengcheng 1 Building?
- How to get the detailed route from Tianjin Xingang to Ningyang County, Taian, Shandong Province?
- The red light on the escalator is always on.
- How about the surrounding facilities of Zhuzhou CITIC Landun Jingyuan Phase II Community?
- How about Zhong Fang Xinyuan? OK or not? Is it worth buying?
- What should I do if there is a warm reminder 4 in Health Treasure?
- Xiang Xue Xincun, Bantian, Longgang, Shenzhen, I want to know the route (bus) to Shenzhen West Railway Station.
- What problems should I pay attention to when changing rooms?