Which companies should participate in the construction of a building? What are they responsible for?

Study site selection, find partners, and sign cooperation intentions, agreements and contracts.

Apply to the planning management department for planning points, so as to obtain the notice of planning points and prepare the project proposal.

Declare the project report to the Planning Commission.

Letter from the Planning Commission to the Planning Bureau

The Planning Bureau will sign it and return it to the Planning Commission.

The Planning Commission agreed to establish the following projects and requested a feasibility study, which will be countersigned by the Development Office of the Construction Commission.

Use the "real estate market information evaluation system" and "real estate investment expert system" to make a detailed feasibility study and calculation of the project investment and prepare a feasibility study report.

The Planning Commission, the Construction Commission, the Planning Commission and various professional bureaus review the feasibility study report.

For the approval of the feasibility study, the two committees will sign, that is, the planning and design tasks will be issued; Use the "marketing planning display design system" for financing operation.

According to this, land acquisition and preliminary planning preparation will be handled, and planning and design tasks will be notified.

Land requisition opinion of planning bureau

Go to the land management department and the land use department for advice.

┏━━━━━━━━━━━┻━━━━━━━━━━━┓

The newly requisitioned land will be transformed into the old town of Land Bureau, Planning Bureau, township government and village office, and transformed into the District Land Bureau.

The results are reported to the Municipal Real Estate Bureau and to the Housing Authority.

┗━━━━━━━━━━━┳━━━━━━━━━━━┛

The municipal government granted the following land.

┏━━━━━━━━━━━━━━╋━━━━━━━━━━━━━━┓

Draw out the conditions for nailing piles, and the Planning Bureau of Surveying and Mapping Institute shall handle the construction land planning accordingly, and go to the land management department for handling.

Nail the pile, and the result will be approved by the designer for the land use certificate, and the land price of the project construction land will be evaluated.

│ │

Apply to determine the planning and design conditions, freeze accounts and duplicate accounts, pay the land price, and obtain

land use certificate

According to the planning and design conditions for consultation.

See the table below to solicit opinions from the district supporting departments. The land management department will review the resettlement plan and resettlement houses.

│ │

After the audit by the Planning Bureau, the demolition permit will be issued according to the notice of planning conditions.

│ │

Commissioned planning, design, relocation meeting and resettlement.

│ │

Go to the planning bureau to get the design plan for review and get the real estate development manual.

│ │

The Planning Bureau put forward the review opinions on the planning. 1. Apply to the Bureau of Gardens and Timber for a felling permit.

│ 2. Understand the line situation and negotiate with the operation class of power supply bureau.

After revision, it will be sent to the First Planning Commission for drawing review, and the rerouting scheme will be revised.

3. Gas, roads, water supply and drainage have been arranged properly.

The first planning commission held a municipal coordination meeting. 4. Go to the Industrial Development Department of the Power Supply Bureau to apply for a power report and formalize it.

According to the minutes of the municipal meeting, formulate the power supply plan, apply for temporary construction and entrust construction.

┗━━━━━━━━━━━━━━┳━━━━━━━━━━━━━━┛

Conduct a separate design (reviewed by Dagong * * * Architectural Planning Committee)

┏━━━━━━━━━━━━━━━━━┻━━━━━━━━━━━━━━━━━┓

Obtain construction project planning permit, construction drawing and energy-saving certificate.

│ │ │

Use the "marketing planning display design system" to apply to the Planning Commission and incorporate it into the tax collection form of the tax bureau.

Production data plan (countersigned by the Construction Committee)

│ │ │

The quotation team will review and receive the annual plan and tax bill for domestic and foreign sales to the Construction Committee and the Economic Commission.

Permit approval form, investment permit registration card, and registration for obtaining the permit.

The Construction Committee and the Price Bureau approved the following prices.

Use the "marketing planning display design system" ┗ ┗ ┗ ┗ ┛ ┛ ┛ ┛ ┛ ┛ ┛ ┛ ┛ ┛ ┛ ┛.

"Real Estate Sales Management System" was sold to the municipal department and sealed, which proved that the municipal conditions were implemented.

Four-source fee payment

Go to the city development office to verify the task.

The UNDP Engineering Department agreed to bid.

Fill in the bidding application form and register with the Municipal Bidding Office.

The bidding office looks at the scene

Using "investment project budget system" to prepare pre-tender estimate

Tender office audit pre-tender estimate

Bid opening meeting

Make a contract, write a bid evaluation report and send a bid-winning notice.

The bidding office stamped and agreed.

┏━━━━━━┳━━━━━━┳━━━━━━┳━━━━━━┓

The general quality station of the construction unit accepts the secretary of the Municipal Development Office audited by the Municipal Bureau of Statistics and the Municipal Evaluation Bureau.

Agree to the project quality supervision to implement the source of funds for the task and register it anywhere.

Sources of services and all programs

┗━━━━━━┻━━━━━━┳━━━━━━┻━━━━━━┛

The Engineering Department of the Construction Committee agreed to start construction and handle the construction permit.

When the construction unit starts construction, the municipal competent department within the red line of the residential area applies for water supply and drainage, roads, gas, electricity, and commissioned design and construction.

┏━━━━━━┳━━━━━━┳━━━━━━┳━━━━━━┳━━━━━━┳━━━━━━┓

1. In residential area 1. Notify the residential area 1. Take 1 road. Ziweilai 1. To thermal power (self-built boiler 1. Go to the gas company

The road entrusts the greening scheme of Forestry Bureau to enter the water company to apply for installation.

The construction section of the planning department applied for installation 1. Environmental protection. This is decided by the planning department.

2. Entrusted construction. 2. Pay the greening fee. 2. Entrust the municipal office to take the line. 2. Entrust the line bureau to carry out line planning.

3. Distribution room soil 3. Road maintenance design of greening construction department, Italian pot road design 3. design

Construction engineering road inspection team checks construction and 3. Building and furnace room 4. Look at the website.

Acceptance planning. build

4. Equipment installation. Arrive at municipal location 6. Business department inspection

And the acceptance supervision office 2. Entrusted and agreed to receive gas.

5. Design of power transmission and water report 7. Arrive by ventilation sheet

Install 3. Go to the labor network office to sort it out.

3. Plan and set up an asset transfer reporting bureau.

4. Procedures and ventilation of EPA

4. Completion inspection and inspection procedures

Radio and dust removal. Come with a gasoline receipt.

Equipment liquefied gas company

5. Completion acceptance of ventilation for each household.

procedure

9. Ventilation equipment

┗━━━━━━━━━━━━━━━━━━━━┳━━━━━━━━━━━━━━━━━━━━┛

All projects have been completed.

Four-way acceptance form signed and sealed.

┏━━━━━━━━━━━━━┻━━━━━━━━━━━━━┓

Determine the form of housing management by acceptance notice.

┗━━━━━━━━━━━━━┳━━━━━━━━━━━━━┛

Distribution, sale and handling of warehouse property certificate.

Use the "real estate property management system" to enter the property management stage.