Job Recruitment Website - Property management company - Who is responsible for the leakage of rainwater pipes on high-rise balconies?

Who is responsible for the leakage of rainwater pipes on high-rise balconies?

Legal analysis: It depends. Usually upstairs is responsible for maintenance. If the house is still under warranty, you can ask the developer to repair it.

1, the newly bought house is leaking, please consult the property department first. Because the property department is generally entrusted by the developer to contact the maintenance affairs, the property department (entrusted by the developer) should contact the construction unit for warranty. The developer has a contract with the construction unit, and the developer has the warranty of the construction unit, so as long as it is not the cause of abnormal use, the construction unit must guarantee the "house leakage".

2. Because the owner and the developer have a contract and warranty relationship, the owner can also directly find the developer (or find the representative of the property department or the construction unit entrusted by the developer).

3. The house is protected by contract terms and consumer rights law. When the property department and the developer ignore it, the owner can complain to the local "engineering quality supervision station" or the local "consumer association".

4. At the end of the warranty period, you can find the property department for maintenance.

Legal basis: Article 40 of the Regulations on Quality Management of Construction Projects Under normal use conditions, the minimum warranty period of construction projects is:

(a) the reasonable service life of the building foundation engineering, foundation engineering and main structure engineering specified in the design documents;

(2) 5 years for roofing waterproof works, toilets, rooms and external walls with waterproof and anti-leakage requirements;

(3) The heating and cooling system consists of two heating periods and cooling periods;

(four) electrical pipelines, water supply and drainage pipelines, equipment installation and decoration works, for 2 years.

The warranty period of other projects shall be agreed by the employer and the contractor.

The warranty period of the construction project shall be calculated from the date when the project is completed and accepted.