Matters needing attention in decoration and entry, what is the first thing after entry?

First, make sure that all your construction procedures are complete. Construction procedures are mainly handled in the property, generally including the following aspects.

1 Sign the renovation agreement issued by the property.

2. Provide drawings for self-decoration, mainly for water circuit reconstruction and demolition of non-bearing wall projects.

3. Get a "work permit", that is, the time limit for the property inspection posted on your doorstep.

Pass: mainly for workers to avoid illegal people from mixing into the community during renovation. (The charge for different communities is generally 15 yuan, and the cost is 5 yuan. The rest 10 yuan will be returned to the owner after renovation). When you apply for a pass, you'd better bring two one-inch photos of the person in charge of decoration and the workers, and a copy of your ID card 1 copy.

5 renovation deposit (different communities charge different fees, at least about 2,000 yuan, which will generally be returned to the owner within 3 months after the renovation is completed).

6. Garbage clearance fee: This fee is used to pay for the cleaning and decoration of the property, which is different from the fee paid to the decoration company. Generally, the two-bedroom apartment is around 300-500 yuan, and different property companies charge different fees.

Second, a few things to do after construction. Ask the person in charge of decoration to show you a list of materials you need to buy and the time you need to transport them to the construction site. Many decoration teams will tell you what kind of building materials they need the next day, only one day in advance. At this time, it is too late to ask for leave to buy.

1 main material purchase list: living room, bedroom, kitchen and bathroom hardware, sanitary ware.

2. Understand the basic arrangement of the construction period, such as when to finish the decoration of water circuit, the sealing of wood, the pasting of tiles, the production of ceiling keel and so on this month. In this way, the time can be arranged reasonably, and the quality can be checked regularly at important steps.

Knowing the time when the quality inspection arrives at the site, you can make an appointment to go to the site together, so that if problems are found, they can be solved in time.

4 If problems are found in the construction, don't let the workers directly correct them. Even if you do, they may not change. You must talk to the quality inspector or the person in charge of decoration, which will be useful. And it's best to write it down. In order to avoid disputes after renovation.