Property management service scheme and emergency measures
A, the owner, user occupied parts suddenly water, electricity, gas stop emergency measures after repair, engineering maintenance personnel immediately rushed to the scene, to verify the water, electricity, gas stop (not due to access to energy switches, equipment and facilities damage). Check up like this to see if the switches and facilities in the previous section are faulty, and then check at the next higher level until it is solved. If there is no fault, it is a municipal fault, that is, report to the relevant municipal departments and wait for the emergency repair personnel to be present to cooperate; At the same time, inform the owner to turn off the use switch to prevent sudden power supply accidents.
Two, the property management within the scope of sudden water, electricity, gas stop emergency measures.
1. When one power supply is cut off, operate the other power supply to cut in, and supply power to the relevant areas. There are some originally determined important areas in its scope, and check whether the power supply system is normal.
2, in the case of municipal failure, the main gas pipeline has leaked, to evacuate people. Set warning signs around the leakage point to prevent kindling, and temporarily block it with sealant tape; When the main water pipe bursts, it should be temporarily blocked with sealant tape, and warning signs should be set to prevent people from slipping.
3. Call the relevant government departments, understand why and when the power supply can be restored, and inform the owner (broadcast or post in writing) to prompt to turn off the power, water and gas switches in the home to prevent other accidents caused by sudden power supply. 4. Power, water and gas are cut off for a long time, and suitable drinking water should be provided to the owners in need for more than 6 hours; In case of power failure for a long time at night, the owner shall provide lighting appliances such as candles or batteries.
5. After the power supply is restored, operate the main power switch to restore the original power supply state and check whether it is normal. When restoring the supply of water, electricity and coal, it is necessary to check the switches and meters in the relevant meter rooms, handle the application for repair and the anomalies in time, make an accident report within 24 hours, and take corrective and preventive measures within 10 days.
Three, the owner and user occupied parts of the drainage facilities blocked emergency measures
1, after receiving the notice of the owner's repair service or management personnel, they should be present for repair immediately.
2, bring tools, dredge blocked pipes, such as water pipe problems, should try to solve the needs of the owner's life.
3. If it cannot be solved, immediately notify the contractor for emergency repair.
4. After the pipeline is unblocked, investigate the reasons for the blockage, and remind, educate and even punish the relevant responsible persons. 5. After the maintenance, the maintenance process should be registered and signed by the maintainer.
Four. Emergency measures for blockage of rain, sewage pipe and drainage pipe network According to the requirements of quality system documents, the operation procedures and inspection and supervision system for inspection and maintenance of rain, sewage pipe and drainage pipe network can ensure the safety and smoothness of rain, sewage pipe and drainage pipe network. In the rainstorm season and the site being used, the pipe network will be blocked unexpectedly. Therefore, the emergency measures formulated for it will effectively alleviate its adverse consequences. Specific emergency measures are as follows:
1, Emergency Treatment of Rainwater Pipe Blockage
(1) Before the rainstorm comes, check and clean up the garbage in the downspout and Mianjinggou, and make sure it is unblocked. During the rainstorm, the rainwater drainage outlet shall be inspected, and the drainage outlet blocked by leaves, plastic bags and garbage washed down by the gale and rainstorm shall be cleaned immediately to promote its smoothness.
(2) Use special tools and equipment for flood prevention and typhoon prevention, such as submersible pump, sewage pump and drainage pipe. , the rainwater collection well with ultra-high water level is drained. Prevent water overflow and intrusion into indoor and computer rooms due to high water level. (3) Dredge the blocked pipeline with dredge and dredge belt until the dredging is finished. After the repair, it is verified that the rainwater is unblocked.
2, sewage pipes and drainage pipe network emergency treatment
(1) For the blockage of sewage pipe and drainage pipe network found during repair and inspection, immediately arrange maintenance personnel to inspect and find out the blockage point.
(2) Inform the owner above the blocking point to stop using it, and use dredge and dredge bar to dredge the drainage through special maintenance holes.
(3) Prepare relevant tools and materials, and timely replace and repair possible damages during dredging.
(4) After dredging, it is proved that the pipeline is unblocked and there is no leakage point, and the above-mentioned owner is informed that the pipeline can be restored.
V. Emergency measures in case of fire.
- Previous article:Award notification letter
- Next article:What is a sailor's job?
- Related articles
- What is the telephone number of Taiyuan Hanwenyuan Marketing Center?
- Coal bureau property
- What is the electricity consumption standard charged by the property?
- Where is the address of Tan Yue Villa in Quanzhou Jinmao Sunshine City?
- Is Yingcaiyuan Property Reliable?
- What problems should Wuhan security outsourcing pay attention to when choosing security companies?
- Emergency notice of epidemic prevention and control in Suining County; The latest bulletin of Suining epidemic situation.
- The 7-year-old son was beaten by the security guard and vomited blood. The woman asked the property to discuss. Why was it rejected?
- How about Beijing Hongda Sheng Yuan Labor Dispatch Co., Ltd.
- What about Qiu real estate?