Job Recruitment Website - Property management company - No matter what the house leaks, what the property does.

No matter what the house leaks, what the property does.

Legal analysis: In case of quality problems, developers can be required to bear corresponding responsibilities. As long as the house is within the warranty period, you can negotiate with the developer and let him repair it. If the developer refuses to perform, and both parties fail to reach an agreement on the repair, they can sue the developer to perform their obligations. At the same time, property losses caused by housing quality problems can be claimed from developers.

Legal basis: Article 7 of the Measures for Quality Warranty of Housing Construction Projects. Under normal use, the minimum warranty period of housing construction projects is: 1. Foundation and main structure engineering, the reasonable service life of the project specified in the design documents; Secondary roof waterproofing works, bathrooms, rooms and external walls with waterproof requirements, 5 years; (3) The heating and cooling system consists of two heating periods and cooling periods; Four electrical systems, water supply and drainage pipelines, equipment installation for 2 years; 5. The renovation project lasts for 2 years. The warranty period of other projects shall be agreed by the construction unit and the construction unit.