Clear water houses have to pay property fees. No matter what kind of house, unless the owner and the developer agree on the time and conditions of paying the property fee in the contract, the owner should pay the property fee after the developer delivers the house. The property management fee is paid by the owner and the buyer after the house is actually delivered, generally starting from the month after the buyer actually takes over the house. The property service fee shall be paid by the property developer before the property is actually delivered to the buyer for possession, and shall be paid jointly by the owner and the buyer after the actual delivery. Therefore, it is generally necessary to pay property fees to collect houses.

What is the decoration process of Shimizu House?

1, Pre-design: For the decoration, the pre-construction is very important, mainly according to their own living habits, detailed measurement of the house, mainly including the area involved in the decoration process. It is tile area, wall paint area, wallpaper area and floor area; Defines the wall size of furniture.

2. Preparation for entering the site: check the flatness of the wall, floor and roof, and check whether the water supply and drainage pipes are unobstructed; Work out the construction time and construction period with the decoration company.

3. Demolition works: Demolition of light walls and non-bearing walls. , but it should be noted that it is not allowed to dismantle the bearing wall and the bearing wall; Clean up the demolished garbage and waste.

4. Concealed engineering construction: including foundation door and window engineering, waterway reconstruction engineering and wood foundation engineering.

5. Masonry works: smooth the hidden foundation of the wall, roughen the foundation and lay bricks.

6. Woodworking engineering: Woodworking engineering, such as veneering, modeling, ceiling sealing, door and window covers, partitions, kitchenware, porch, gypsum board ceiling, yuba installation, etc.

7. Paintings: wall painting, wallpaper pasting, wall pasting, paper veneer, soft decoration making, etc.

8. Installation works: including the installation of finished wooden doors, floors and cabinets, door locks, door suction, sanitary wares and hardware fittings, range hoods, water heaters and exhaust fans.

9. General acceptance of completion: clean up the renovated room, carry out acceptance according to the contract requirements, and coordinate if rectification is needed.

10, other matters: accounting for some projects added or reduced in the construction process, re-coordinating the projects added at zero hours, and paying attention to basic principles such as overall arrangement, finished product protection, safety and environmental protection when formulating specific construction procedures.