Job Recruitment Website - Property management company - Model essay on minutes of practical writing meeting

Model essay on minutes of practical writing meeting

Meeting minutes are legal documents used to record and convey the meeting and agreed matters. Its writing direction is more flexible. The following is a model essay on the minutes of a practical writing meeting that I brought you. Please refer to.

Minutes of Practical Writing Meeting: Model Writing 1

Summary of Performance Appraisal Seminar In June, 1978, the General Factory held four performance appraisal seminars for branch cadres. Li Xiaoyu, Party Secretary of the General Factory, presided over the meeting, and the heads of various units and functional departments attended the meeting. The minutes of the meeting are as follows.

1. The company's assessment of tapping the potential of the general factory should be implemented in all functional departments and decomposed into relevant units, with the technical department, insurance department and health and safety department accounting for 0.6, 0.25 and 0. 15 respectively.

2. The manufacturer adds equipment management and group inspection and assessment items, and the equipment support department puts forward assessment opinions.

3. Modify and improve the performance evaluation system. 1? The actual value in April is substituted into the revised performance appraisal system again.

4. In the process support evaluation, some units are controversial. They think that there are subjective factors in the process support evaluation, and the evaluation should be based and further refined.

5. In view of the incident assessment, the 20XX accident proposed by all units in the cold rolling area was not fully included in the assessment. It is scheduled that all units in the cold rolling area will report the accident to the political department this Friday, and then the functional department will examine and approve it to determine the assessment base of the accident. The electrical accident of continuous casting in 20XX was transferred from the hot rolling spot check room to the second continuous casting plant for re-examination and assessment.

6. Refinery Branch proposed to reduce the cost after merging the existing alloy and aluminum assessment items, and the power consumption of 1#LF furnace was statistically assessed according to the variety structure (mainly through the number of round billets and slabs of 1#LF furnace).

7. Change the refractory index of ladle and hot metal ladle in the material preparation workshop into the management of ladle and hot metal ladle, and bring them into the production management, which will be assessed by the safety production department.

8. In view of the technical indicators of the cold rolling zone, the cold rolling branch has objections to the assessment of wave ribbing in the second and third stages of cold rolling (can the wave ribbing be separated and whether the ribbing is assessed by the cold rolling branch? ), Silicon Steel Branch suggested that the assessment of the yield rate should be detailed (does the assessment distinguish between trimming and non-trimming? ), the technical quality department is responsible for adjusting the assessment criteria.

9. The energy consumption of cold rolling area should be counted and assessed according to the variety structure. At the same time, the energy consumption of each unit of 1# and 2# galvanized lines and silicon steel should be separated.

20XX June 9th

Model essay on minutes of practical writing meeting II

On the afternoon of May 3rd, 20XX, Li Guosheng, the project manager in charge of the municipal department of Chengdu Xingcheng Construction Management Co., Ltd., called the project managers and project leaders of the construction units of the West Second Ring Road Reconstruction Project, the East Railway Station area and the Shiling Interchange Reconstruction Project to hold a special meeting on safe and civilized construction in the conference room of the West Second Ring Road Reconstruction Project (the third floor of Jinsha Century Hotel).

A, the contractors, supervision units must be in accordance with the requirements of the meeting notice, send relevant person in charge to attend on time, shall not be absent without reason. Anyone who is late for the meeting will be fined 5000 yuan each time; If you are late for 3 times in total, inform the company where the latecomer is located and ask for treatment;

Second, abide by the conference system, and the mobile phones of the participants are turned to mute state; Answer the phone outside the conference room. It conveyed the main contents of the city's safe and civilized construction meeting on May 3 and the specific requirements of various functional departments in the city for dust control. At the same time, it is required that all engineering projects must strictly implement the safety and civilized construction management system according to the requirements of functional departments at all levels in the city, ensure that measures are in place and standardize operations, and require:

First, all construction units must strengthen on-site management, improve safety and civilized construction standards, and install video monitoring systems at the construction site as soon as possible to achieve refined management;

The second is to incorporate safety and civilized construction and dust control into the target assessment system, and the safety and civilized construction and dust control assessment ranked last for three consecutive times. Xingcheng Construction Management Co., Ltd. will inform the construction unit and clearly propose to replace the project manager and relevant responsible persons;

Three, the construction unit immediately formulate or improve the safety and civilized construction and dust control related systems or measures, the responsibility should be implemented to people, rewards and punishments are clear;

Four, safe and civilized construction, dust control work to form a weekly management system. Before five o'clock every Friday afternoon, the construction unit is required to report the weekly site management signed by the supervisor and the site representative;

Verb (abbreviation of verb) Establish a leading group for safe and civilized construction according to each bid section, with Party A's project management engineer as the team leader, project manager and supervision director as the deputy team leader, and publicize the list and telephone number of team members at the construction site.

Finally, in view of the safe and civilized construction, the recent work schedule of the West Second Ring Road Construction Project is as follows:

First, all construction units must increase the number of teams and on-site construction machinery to ensure the smooth completion of the first batch of pile foundation construction as planned before May 5;

Second, according to the design progress, each construction unit will discharge the construction progress plan as soon as possible. Before the construction of the enclosure, take the initiative to contact the Municipal Traffic Management Bureau and other relevant functional departments 2 days in advance to make overall coordination;

Three, the bidding supervision units should fully perform their duties, in strict accordance with the tender documents with supervision personnel, and according to the requirements of engineering construction on duty 24 hours a day.

List of participating units and personnel: See the meeting sign-in table for details.

Main delivery: all participating units

Cc: Relevant leaders

Chengdu Xingcheng construction management co., ltd. municipal projects department

20XX May 3rd

Model essay on minutes of practical writing meeting 3

Time: 20xx65438+1October 10 3 pm

Venue: Chairman's Meeting Room

Participants: Director Ke Dong, Director Chen, Deputy Director Zheng, Director Zheng and heads of relevant departments.

Moderator: Chen

Recorder: Ke Pinhua

Meeting contents:

At the meeting, Mr. Ke Dong and Mr. Yang Zong talked with the heads of production department, finance department and management department, and the minutes of the meeting were as follows:

1. The meeting summarized the energy consumption of each unit last year and made reasonable arrangements for this year's energy consumption.

2. Explore the reward and punishment system for energy saving and emission reduction in 20XX, and accelerate its implementation.

3, require all departments to continue to do a good job of energy saving.

4, urge the workshop technical personnel to do a good job in energy-saving technical transformation scheme and report.

Best of all, Chairman Ke stressed that all departments should continue to strengthen energy conservation and emission reduction, keep abreast of production and operation, and strengthen equipment maintenance to ensure normal and efficient operation of equipment.

Fangchenggang Fangcheng fangsheng building materials co., ltd

20XX 65438+ October 10

Guess you like:

1.

2. Practical writing experience model essay

3. Practical writing learning summary model essay

4. Requirements and characteristics of meeting minutes writing

5. Application writing study plan model essay

6. Personal summary of practical writing