Job Recruitment Website - Property management company - Emergency plan for falling prevention in aerial work.
Emergency plan for falling prevention in aerial work.
In our daily study, work and life, we sometimes face unexpected events such as natural disasters, serious accidents, environmental hazards and man-made destruction. In order to control the development of accidents, it is necessary to prepare specific, detailed and targeted emergency plans in advance. How to prepare an emergency plan? The following is a model essay on the Emergency Plan for Preventing Falling from Aerial Work, which I have carefully compiled. It is for reference only and I hope it will help you.
Emergency Plan for Falling Prevention in Aerial Work 1 1 General Rules
The purpose of compiling 1. 1
Strengthen the management of production safety in the construction site, so that employees can better understand the dangerous points existing in aerial work, continuously enhance the safety prevention ability, and reduce casualties and risk losses when accidents occur.
1.2 compilation basis:
Guidelines for the preparation of emergency plans for production safety accidents in production and business units
The management system of the company records the emergency preparedness and response control procedures;
List of major risks/important environmental factors and their control plans;
Code for safety work of electric power construction
1.3 Scope of application
It is suitable for the emergency rescue of falling accidents in the construction and production of secondary units and project departments within the company.
2, organization and command system and responsibilities
2. 1 organization and command system
Establish a company-level emergency leading group for personal injury accidents
Team leader:
Deputy team leader:
Members:
2.2 Responsibility
2.2. 1 The team leader is responsible for ensuring the resources needed for accident rescue and training drills; Be responsible for starting emergency plans when accidents occur, directing rescue work and organizing accident analysis.
2.2.2 The deputy team leader is responsible for implementing the decision-making opinions of the team leader and starting the emergency rescue work at the scene of the accident; Be responsible for organizing and implementing emergency training and drills, and evaluating the effect.
2.2.3 Members are responsible for carrying out emergency rescue work at the scene of the accident, protecting the scene of the accident, conducting training and drills on emergency plans, and conducting accident analysis and statistical reporting.
3. Emergency response
3. 1 Analysis of hidden dangers of accidents
3. 1.65438+
3. 1.2 There is no safety rope and fence at the edge of the aerial work area, and there is no cover plate and safety net at the entrance, which is easy to cause falling at high altitude.
3. 1.3 The equipment, materials and tools used in aerial work are not provided with anti-falling measures, which may easily cause falling objects.
3. 1.4 incorrect use of power supply and unqualified power tools in aerial work can easily lead to electric shock and falling.
3. 1.5 scaffolding for aerial work is not set up as required; It is easy to cause high-altitude falling and collapse.
3. 1.6 The platform, temporary passage and scaffold for aerial work are not equipped with skirting boards, which may easily cause falling objects.
3. 1.7 Flammable and explosive articles used in aerial work do not meet the requirements of the specification, which may easily cause fire and explosion accidents.
3. 1.8 Insufficient lighting for aerial work at night is easy to cause falling objects.
3.2 Control measures
3.2. 1 Strengthen the safety training and education of construction personnel, improve their safety awareness and use safety protection articles correctly.
3.2.2 Safety warning signs, safety ropes and fences must be set up in all limb construction areas and holes on site. Cover plates or safety nets must be laid for holes, and special safety nets should be laid for furnaces.
3.2.3 Temporary power supply for aerial work shall be arranged reasonably and meet safety requirements. It is forbidden to pull the power cord privately or connect it randomly. Electrical equipment must be reliably grounded, and electric tools must be checked before use.
3.2.4 Scaffolding must meet the requirements of safety regulations and can only be put into use after acceptance.
3.2.5 18㎝ skirting boards must be installed on platforms, temporary passages and scaffolding for aerial work.
3.2.6 Flammable and explosive articles used in aerial work must meet the requirements of safety regulations, and effective isolation measures must be taken when welding and gas cutting are used.
3.2.7 Lighting for aerial work at night must meet the construction requirements.
3.3 emergency start:
3.3. 1 In case of an accident, the personnel at the accident site shall immediately report to the emergency leading group of the unit, and the contents of the report shall specify the place, time, equipment and personnel of the accident; In case of serious injury or above accidents, the emergency leading group of each unit shall report to the emergency leading group of the company as soon as possible after receiving the alarm.
3.3.2 The emergency leading group immediately rushed to the construction site to direct rescue, start the company-level emergency plan and organize emergency rescue work. Call 120 quickly to contact local medical institutions to transport the wounded; Make emergency measures to deal with the relevant accident site.
3.3.3 Except the staff, other irrelevant personnel at the scene of the accident should immediately organize evacuation and protect the scene of the accident.
3.3.4 The investigation and handling of accidents shall be carried out in accordance with the Regulations on Reporting, Investigation and Handling of Production Safety Accidents and the accident investigation, handling, statistics and reporting system formulated by the company.
4. Emergency resources
4. 1 All units shall provide rescue knowledge training for employees according to the requirements of emergency plan, including at least basic contents such as cardiopulmonary resuscitation technology, common sense of electric shock first aid, use technology of fire extinguishing facilities and emergency procedures.
4.2 Each project department must ensure that the construction site is equipped with at least emergency vehicles, emergency medical boxes, fire-fighting facilities, walkie-talkies, green medical rescue channel signed with local medical institutions and other necessary resources.
4.3 Each unit shall establish an emergency resource registration form, and be responsible for quarterly inspection of emergency facilities, and timely rectification when problems are found.
4.4 Emergency call
Fire alarm telephone number: 1 19
Call the police: 1 10
Emergency center: 120
Security department:
5. Control requirements
5. 1 All units shall train the team members in emergency rescue knowledge and skills as required, and keep training records.
5.2 Organize employees to carry out necessary emergency drills, including functional drills, local drills, desktop drills or actual combat drills.
5.3 In view of the problems found in emergency drills, urge the rectification and improve the deficiencies of the plan.
Emergency Plan for Falling Prevention in Aerial Work 2 I. Contents:
Any work done more than 2 meters above the ground should be regarded as aerial work. Any work that can be completed in advance on the ground must be completed on the ground to minimize aerial work. Work on scaffolding without scaffolding or railings. When the height exceeds 1.5m, the safety belt must be used or other reliable safety measures must be taken.
Second, responsibilities:
1, responsibilities of construction personnel:
A, seriously study the rules and regulations, systems and measures related to safety and health, consciously abide by the rules and regulations and discipline, and do not violate the rules.
B, the correct use of occupational safety protection articles, appliances, and reliability check before use.
C, before the construction project starts, seriously accept the safety technical disclosure.
D, check the job site before operation, completes the safety protection measures, to ensure that don't hurt others, don't hurt by others. Anti-falling for aerial work is based on self-protection and mutual protection.
2, full-time security officer responsibilities:
A, supervise and inspect the safety and civilized construction condition of the construction site and the operation behavior of the workers.
Have the right to stop illegal operations and illegal command; Have the right to impose economic penalties on violators; For the construction that seriously endangers personal safety, it has the right to order to stop the construction first, and immediately report it to the leaders of the project department for study and treatment.
B, participate in the safety disclosure before the commencement of important construction projects and dangerous operation projects on this site, check the safety and civilized construction, and supervise the implementation of safety construction measures.
C, to participate in on-site safety work meetings and production dispatching meetings, and to assist on-site leaders in arranging, inspecting and summarizing the management of safe and civilized construction.
D, assist site leaders to arrange and check weekly safety day activities; Supervise and check the daily class meeting of the team.
E, supervise and inspect the implementation of civilized construction, finished product protection measures and life hygiene management in the construction site and safety and health responsibility area.
F, responsible for on-site construction machinery (machines) and traffic safety supervision of vehicles.
G, responsible for the fire and explosion safety supervision of this site.
H, supervise and assist the relevant personnel on site to do a good job in regular inspection and appraisal of occupational protection articles, appliances and important instruments.
First, organize safety and health publicity and education. Responsible for the secondary safety education for new employees.
J, participate in on-site safety inspection, and urge the rectification of problems found.
K, responsible for the supervision, inspection and guidance of the safety work of the project division.
L, responsible for the safety team civilized construction assessment and rewards and punishments.
Third, emergency rescue.
(1) General rules:
1 Take active measures to protect the lives of the wounded and reduce injuries after falling from aerial work, and contact the medical department for treatment according to the needs of injuries. The conditions for successful first aid are quick action and correct operation. Delays and mistakes in operation will lead to the aggravation or death of the wounded.
2, the field staff should receive regular training, learning first aid methods, cardiopulmonary resuscitation, can stop bleeding, can bandage, can transfer the wounded, can handle emergency trauma.
(2) First aid methods:
1, we must race against time to give first aid to the falling wounded, immediately and quickly adopt cardiopulmonary resuscitation for rescue, and insist on continuous contact with the medical department as soon as possible, and strive for medical personnel to take over the treatment, and should not give up on-site rescue before the medical personnel take over the treatment.
2. If the injured person is conscious, he should lie flat on the spot and observe closely. Don't stand or walk for the time being.
;
- Previous article:Full text of Jiangsu Province's measures for the administration of property service charges
- Next article:This hotel is really warm.
- Related articles
- Address of Chengdu Telecom Company
- What's the telephone number of the marketing center of Rambo Bay Store in Texas Outlets?
- Is the printer an electronic device?
- How to take the train from Hangu District of Tianjin to Beijing Security Company and return to Hangu in one day?
- Where is Guangzhou China Resources Land Runyue?
- Can I refuse to pay the property fee if the shop leaks water?
- How about Tianjin Dongli Lake Vanke City?
- How to set up the organizational structure of property companies
- Do I need to register the rental contract?
- How to solve the problem of littering by owners?