Job Recruitment Website - Property management company - What is the general process of decorating a house?

What is the general process of decorating a house?

The general steps of decorating a house are as follows:

1. design: when decorating, you must first determine a project, customize one or several suitable schemes, and choose the grade you can bear. The planning and design process needs reasonable layout, appropriate allocation of funds, and don't let the later construction reuse labor and materials.

2. Materials: After the decoration scheme is completed, materials will be selected according to the design. Try to be cautious in the process of selecting materials, and don't buy some products without brands, so as not to encounter parallel imports.

3. Determine the price and sign the contract: After determining the approximate cost of design planning and materials, you can contact some decorators. You should consult some professionals first, find a reliable decorator and sign a contract with him.

4. Total budget: On the basis of design and asking price, budget the expenses of the whole decoration process together with the decorator, including design expenses, material expenses and construction expenses.

5. Time preparation: After all, decoration is a big expense. It is necessary to leave enough time in advance to put the design, materials, asking price and budget in place. The more fully prepared in the early stage, the faster the decoration can be.

Extended data

Matters needing attention in winter decoration of residence

1, control the indoor temperature

In winter in the north, the temperature will drop sharply, which is a fatal blow to the decoration. Low temperature, especially accompanied by strong wind, will affect the shrinkage and moisture volatilization of building materials. Taking wall paint and wood as examples, the sudden drop of temperature will make the interface between paint and wood shrink sharply, leading to various cracking phenomena.

In winter construction, we must control the room temperature. When cold air comes, close the window in time, and when the indoor temperature is close to the outdoor temperature, properly open the window for ventilation.

2. Let the main material stand up

The main materials used in decoration, especially wood, should be prepared in advance and kept indoors with heating equipment for 3 to 5 days as far as possible, so that the water will volatilize due to temperature changes and avoid deformation after decoration.

The sand should be carefully screened, and there should be no ice. Some antifreeze can be properly added according to the actual construction requirements. Cement can't be constructed in the open air, so it should be antifreeze. Wall tiles and floor tiles must be laid under the condition of adapting to indoor temperature.

3, wood early sealing paint

When decorating in winter, be careful not to pile the decoration materials on the heating equipment, so as to avoid their uneven heating and deformation. For some wood, sealing paint should be made as soon as possible, which can not only prevent pollution, but also reduce the loss of water.

4. Aerial reconnaissance

Decoration in heating season, dry air and poor indoor ventilation. The formaldehyde, benzene and other harmful substances in decoration materials volatilize a lot, and the concentration is easily exceeded. You should do an aerial test before boarding the plane, so that you know what you are doing.

Baidu Encyclopedia-House Decoration-Decoration Steps

Baidu encyclopedia-decoration