Steps and processes of house decoration
First, the early stage
Determine the designers and construction team.
Measure and size the room.
Handle relevant formalities, such as property approval, construction permit, etc.
Sign a contract to define the renovation plan, budget and time plan.
Second, the hard loading stage
Wall reconstruction, including wall demolition, wall building, wall covering, etc.
Hydropower transformation, including the re-layout and construction of hydropower lines, determining the position and wiring of sockets, switches, lamps, etc.
Waterproof treatment, including the waterproof construction of kitchen and bathroom, balcony and other places that need waterproofing.
Woodworking and bricklaying, including carpentry and bricklaying, etc.
Painting works, including the basic treatment of wall surface, coating latex paint, etc.
Third, the installation stage.
Ceiling installation, lamps installation.
Install water pipes, sanitary ware, etc.
Install hardware, hanging cabinets, etc.
Install floor, skirting board, etc.
Install curtain rails, window decorations, etc.
Other installation work, such as TV background wall, decorative painting, etc.
Fourth, the soft-fitting stage.
Clean up and remove the previous decoration garbage.
Install or move into household appliances, and arrange home soft decoration according to personal preference or soft decoration scheme.
Other soft decoration work, such as decoration, adjustment of furniture position, etc.
Verb (abbreviation for verb) ventilation and acceptance stage
Open the window to ventilate the house until the wood products such as paint and cabinets are dry.
Decoration project acceptance, check the quality and effect of water and electricity lines, walls and floors.
Keep it clean and tidy to ensure the hygiene and safety of the decoration site.
Provide relevant materials and warranty cards, and provide after-sales service for decoration projects.
The above are the general steps and processes of house decoration, and the specific steps and processes may be different due to personal needs and actual conditions. It is suggested to fully communicate and negotiate with designers and construction personnel before decoration, formulate detailed decoration scheme and budget, and carry out construction and management in strict accordance with the scheme to ensure the quality and progress of decoration to meet expectations.
- Previous article:According to the law, the roof doors of residential areas are not allowed to be locked.
- Next article:What exactly is Rongyu Garden?
- Related articles
- Which building is Yue Hui Apartment in Lengshuitan District of Yongzhou City?
- Where is Green County, Jindi Century City, Shijiazhuang?
- Who should bear the public lighting in the community, the owner or the property management company? Does the property management fee we pay include public lighting?
- What is the average house price of Taorantingyuan Community in Guangzhou Huajing New Town?
- Which company is the developer of Hengshui Yongyu Fengjing?
- Where is the address of Dehong Joy Sunshine Castle?
- How to do a good job in enterprise management
- Where is the address of Impression Jianghu in Zhaoshan, Zhong Jian, Xiangtan?
- When will the delivery be made in Longwan, Zhongxin Peninsula, Meishan?
- What is the price of Country Garden Jiangshan in Wulong, Chongqing?