Job Recruitment Website - Property management company - What is the compensation standard for attachments on Anyang national construction land?

What is the compensation standard for attachments on Anyang national construction land?

Compensation standard for attachments on national construction land in Anyang I. Residential buildings 1 and "24" brick-wood structures with lime mortar brick walls, wooden frames, wooden purlins, blue tile roofs, dry paved floors or hardened cement, and general wooden doors and windows. The compensation standard is 600 yuan/m2. 2. Brick-concrete structure: "24" brick wall, concrete ring beam, precast slab or cast-in-place top floor, ground dry paving or cement hardening, and general wooden doors and windows or plastic-steel aluminum alloy doors and windows are built with mixed mortar. The compensation standard is 780 yuan/m2. Brick-wood structure and brick-concrete structure, residential buildings with more than two floors (including two floors) are approved for construction; Balcony, corridor and outdoor stairs are calculated by half of the horizontal projection area; The standard height is 2.8 meters. 3. Basement: complete doors and windows, hardened ground cement and waterproof treatment. The compensation standard is 550 yuan/m2. The clear height exceeds 2.2 meters. 2. residence (bungalow) 1. Brick-wood structure: "24" brick wall made of lime mortar, wooden frame, wooden purlin, blue tile roof, dry floor or cement hardening, generally wooden doors and windows or plastic-steel aluminum alloy doors and windows. The compensation standard is 600 yuan/m2. 2. Brick-concrete structure: "24" brick wall, concrete ring beam, precast slab or cast-in-place top floor, ground dry paving or cement hardening, and general wooden doors and windows or plastic-steel aluminum alloy doors and windows are built with mixed mortar. The compensation standard is 650 yuan/m2. Remarks: 1, approved residential building; 2. Balcony and corridor are calculated by half area; 3. The standard height is 2.8 meters. Three. Housing for enterprises, aquaculture and agricultural production 1. Board house structure: regular color steel house (wall and roof are made of composite thermal insulation color steel plate), dry floor or hardened cement, plastic steel and aluminum alloy doors and windows. The compensation standard is 450 yuan/m2. 2. Brick-wood structure: "24" brick wall, wooden frame, wooden purlin, blue tile roof, ground dry paving or cement hardening, ordinary wooden doors and windows or plastic-steel aluminum alloy doors and windows. Compensation 500 yuan/m2. 3. Brick-concrete structure: "24" brick wall, concrete ring beam, precast slab or cast-in-place top floor, ground dry paving or cement hardening, and general wooden doors and windows or plastic-steel aluminum alloy doors and windows are built with mixed mortar. Compensation 550 yuan/m2. Remarks: 1, generally used in non-residential buildings such as production, warehouses, temporary houses and offices; 2, walls, ground hardening, interior and exterior wall painting, roofing waterproof, complete doors and windows, clear height of more than 2.8; 3. If the height of the factory building exceeds 4m (eaves height), the compensation 50 yuan/m2 shall be increased for each increase of 1m; 4, large equipment, materials and articles in the enterprise, according to the market price to give relocation expenses. Simple room 1. Simple structure: brick wall, asbestos tile and linoleum roof. Compensation 100— 150 yuan/m2. 2. Simple color steel structure: the compensation for single-layer color steel tile structure is 80- 100 yuan /m2. Brick wall (composite insulation color steel structure) color steel tile roof compensation 150—200 yuan /m2. 3. Brick-wood structure: "24" brick wall, wooden frame, tile roof and lime mortar masonry. Compensation 200-240 yuan /m2. 4. Masonry "24" brick wall, precast slab or cast-in-place roof with mixed mortar. Compensation 250-300 yuan /m2. Remarks: 1, the four walls are complete, the doors and windows are complete, the ground is hardened, and the clear height is above 2.8; 2. Livestock breeding houses refer to this standard; 3, combined with the old and new, the degree of perfection to determine the compensation standard. V shed 1. Simple shed: no wall, wood structure, straw mat ceiling and linoleum compensation 10—20 yuan /m2. If there is no wall, wood or steel frame column, the ceiling compensation is asbestos tile 20-40 yuan/m2; If there is no wall, the brick column and ceiling are asbestos tile 40-60 yuan/square meter; If there is no wall, the structure is made of wood or steel pipe, and the ceiling compensation is 60-80 yuan /m2 color steel tile. 2. Brick shed: two "24" brick walls with standard eaves height of 2.5m and asbestos shingles or linoleum as the ceiling. Compensation 100- 150 yuan /m2. "24" brick wall on three sides, with a standard eaves height of 2.5m, the ceiling is made of color steel or precast cement board, and the compensation is 150—200 yuan /m2. Six, the gate 1, general gate, 3.3 meters high, two doorposts, general plaster, single and double steel gate, the compensation is 1000-2000 yuan/seat. 2. Door, 4m high, double doorposts, precast slab (or beam), ceramic tile facing, double steel door, compensation of 3000 yuan/seat. 3. Door, 4.6 meters high, with two doorposts, with prefabricated panels (or beams) on it, antique or European style, ceramic tile facing, double steel doors, compensation of 4,000 yuan/seat. Remarks: Including door, head and post compensation. Seven. Wall soil wall: 30 yuan /m2. Brick enclosure: "12" brick enclosure compensation 35 yuan /m2. "24" brick fence compensation 80 yuan /m2. "37" Brick Enclosure Compensation 100 Yuan/m2. Remarks: Manual trenching, 300mm Sanqi lime-soil cushion and 50 # mixed mortar masonry. Eight, hardened ground (building) 1, steel slag ground compensation 5 yuan/square meter. 2. Floor compensation 20 yuan/m2. 3. The ground compensation fee is 40 yuan/m2. 4. Floor slab (without reinforcement) compensation 180 yuan /m3. 200 yuan /m3 compensation for concrete floor slab (with reinforcement). Remarks: Plain soil compaction, concrete cushion, cement mortar surface or brick pavement. Nine, simple livestock and poultry house 1, brick wall low wall, asbestos tile ceiling compensation for 100 yuan/square meter. 2. 75 yuan /m2 compensation for the open-air ring on the wall. Remarks: Simple breeding cowshed, pigsty, sheepfold, chicken house, duck house, etc. Ten, simple toilet 1, brick masonry compensation 500 yuan/seat ... 2. Earth wall or dry foundation compensation 300 yuan/Taiwan. Eleven, biogas digesters 1, ordinary household biogas digesters compensation for 250 yuan /m3. 2, large and medium-sized tunnel compensation for 340 yuan /m3. 3. Large and medium-sized compensation 800 yuan /m3 for tunnel medium-temperature fermentation. 4. Medium-temperature fermentation compensation for large and medium-sized aboveground straw is 3400 yuan /m3. Remarks: Construction shall be carried out according to specifications and standards. Twelve, reservoir, septic tank brick, stone compensation for 100 yuan/cubic meter. Remarks: Calculated according to actual volume. Thirteen. Water well 1, motor well: well depth is less than 50m, reinforced concrete well compensation 130 yuan /m ... well depth is 50- 100 m, reinforced concrete shaft compensation 160 yuan/m. Well depth 1 00-150m, reinforced concrete shaft compensation 250 yuan/m .. well depth150-200m, reinforced concrete shaft compensation 400 yuan/m ... When the well depth exceeds 200m, reinforced concrete shaft compensation 500 yuan/m .. Remarks:1m. 2, reinforced concrete shaft, pipe diameter of 0.3-0.6 meters; 3. Scrapping shall be compensated by 30% of the formal well; 4. There are supporting facilities such as water pump and power distribution in the well. 5. Compensation for 600 yuan/eye by hydraulic well. Remarks: compensation with pressurized water machine. 14. aqueduct 1, brick, stone and concrete aqueduct: 1 m2 (including 1 m2) section compensation 200 yuan/m. Compensation for cross-sectional area of more than 0.5 square meters 1 square meters 150 yuan/meter. Compensation of 80 yuan/m for sections below 0.5 square meters. Cement furrow compensation 50 yuan/meter. 2. Compensation of soil canal 10 yuan/meter. Fifteen, buried pipeline 1, plastic, PVC water pipe compensation 25 yuan/meter. 2, cast iron water pipe diameter of 65438 plus or minus 0 inches below the compensation for 50 yuan/meter. 65 yuan/meter compensation for more than one inch. 3. Cement pipe compensation refers to channel compensation. 16. Greenhouse 1, single shed: energy-saving greenhouse compensation 1 10 yuan/m2. Glass greenhouse compensation 90 yuan /m2. 55 yuan /m2 compensation for ordinary greenhouses. Compensation 35 yuan /m2 for greenhouse with steel tube structure. 30 yuan /m2 compensation for cement structure greenhouse. Compensation for bamboo and wood greenhouses 10 yuan /m2. Small arch shed compensation 5 yuan /m2. 2. Multi-span shed: Automation can only compensate 600 yuan /m2 of standard shed. Automatic standard steel pipe greenhouse compensation 240 yuan /m2. 17. Spray and drip irrigation facilities 1, drip irrigation facilities: 5000 yuan/mu. 2. Drip facilities: 3,000 yuan/mu. 18. Fish ponds and ponds 1. Fish pond: compensation for earthen pond 10 yuan /m2. Soil pond+seepage control compensation 36 yuan /m2. Compensation for seepage control and slope protection 48 yuan /m2. 2. Fish pond: brick+plastering+seepage control compensation 60 yuan /m2. Brick+tile+seepage control compensation 70 yuan /m2. 19. Power and communication facilities: 1. Electricity for production and living: 220 volts for domestic use and 380 volts for production use. 2. Power transformation and distribution facilities should be compensated according to the facts. 3. Telephone and network cable: fixed telephone and broadband compensation 158 yuan/Taiwan. Twenty, power and communication facilities 1, and the compensation for limited TV is 100 yuan/household. 2. Cement pole: the height is 8 8- 10/0m, and the compensation is 300 yuan/root. Height 1 1- 15m, compensation 400 yuan/root. 3. Wooden poles: compensation 150 yuan/root. 4. Embedding: 3-50 yuan/meter. 5. Tower: According to the actual compensation. 6. Pipeline: 90 yuan/meter/pipe hole. 7. Pipeline well: 2500 yuan/well. 2 1. Gas supply by natural gas pipeline: 2,500 yuan/meter. Twenty-two, air conditioning 1, window machine: 100 yuan/set. 2. Split and cabinet type: 200 yuan/Department. Twenty-three, heating radiator: 50 yuan/group. 24. Water facilities 1, set: 100 yuan/set. 2. Well table: the compensation for DN 15-DN40 is 1000- 1350 yuan/seat. 3. Buried pipeline: DN25-DN63 compensation 40-200 yuan/meter. Twenty-five, a set of solar energy 100-200 yuan. 26. Oil-water tank 1, steel tank: 30-50 tons capacity compensation of 3000 yuan. /kloc-capacity compensation below 0/0 ton 1500 yuan. 2. Plastic cans, etc. : compensation for simple water storage tank and drying tank 100-300 yuan. Twenty-seven Safety net reinforcement: 50 yuan /m2. Twenty-eight, the chimney diameter of 20-40 cm compensation is 500- 1000 yuan, and the diameter of 40-80 cm compensation is 1000-2000 yuan. The bottom diameter is 3 meters and the compensation is 8000 yuan. 29. The bottom diameter of the water tower is 3m, and the compensation is 15000 yuan. 30. The compensation for one tomb and one coffin is 2000 yuan/seat. 3 1. Timber forests such as poplar, willow, locust, elm, paulownia, Ailanthus altissima and Azadirachta indica (including sporadic trees). The compensation of DBH below 5cm (including 5cm) is 6 yuan/plant, that of 6- 10cm is 12 yuan/plant, and that of DBH is 165438+. 21-25cm DBH compensation 120 yuan/plant, 26-30cm DBH compensation 180 yuan/plant, and more than 3 1 cm DBH compensation 300 yuan/plant. 32. Sporadic fruit trees, such as apple trees, peach trees, plum trees, apricot trees, pear trees, cherry trees, grape trees, jujube trees, hawthorn trees, persimmon trees and walnut trees. : compensation for ground diameter below 2cm 10 yuan/plant, 2.1-4cm compensation for 20 yuan/plant, and 4. 1. 8. 1- 10 cm diameter compensation 250 yuan/plant, 10 cm diameter compensation 350 yuan/plant. 33. Number of shrubs per pier 10-20: 30 yuan/pier. Thirty-four, economic forest according to the documents formulated by the Provincial Forestry Department. Thirty-five, the main afforestation tree species of seedlings (timber forest and economic forest tree species) 1, seedling height (cm) (below 200 cm): 3000 yuan/mu for less than 80 cm, 4000 yuan/mu for 80- 150 cm, 65438. 2. Meter diameter (cm):1.8-2cm, and the compensation is 6000 yuan/mu. 3. (Seedling height is more than 200 cm): 2-3.5 cm compensation is 8000 yuan/mu, 3.5-5 cm compensation 10000 yuan/mu, and 5 cm compensation 15000 yuan/mu. Thirty-six, nursery landscaping tree species and flowers 1, seedling height (cm) (below150cm): 5000 yuan/mu for shrub and flower tree species under 50, 6000 yuan/mu for woody landscaping tree species under 50- 100 cm, and1mu for woody landscaping tree species. 2. Seedling height and diameter (cm) 150cm or more: 2-3 cm compensation for shrub flowers 10000 yuan/mu, 3-4 cm compensation for woody landscaping trees 12000 yuan/mu, and 4-6 cm compensation for woody landscaping trees1mu. 37. Compensation standard for house decoration (decoration) 1, first class: high-grade parquet floors and granite are used inside the house. , the wall is decorated with dado or soft bag, and all roof decorations are compensated 100-200 yuan /m2. 2. Second class: the interior of the house is high-grade floor tiles, and the compensation for general parquet floor, ceiling or other decoration is 60- 150 yuan /m2. 3. Third-class: the interior of the house is common floor tile terrazzo, and the compensation for 888 wall or other painted wall is 20-80 yuan /m2. Thirty-eight, moving subsidies for the demolition of residential or enterprise buildings with batch construction procedures, calculated according to the housing construction area, 10 yuan/square meter. Thirty-six, temporary resettlement subsidy (transition fee) demolition of residential buildings with batch construction procedures, calculated according to the housing construction area, 10 yuan/square meter. Thirty-nine, the relocation bonus for the demolition of houses with batch construction procedures is calculated according to the building construction area 100 yuan/square meter. Forty, non-residential production and business suspension subsidies for the demolition of houses that are being produced and operated with batch construction procedures, resulting in production and business suspension, calculated according to the building construction area, 200 yuan/square meter.