How to measure the housing area when closing the house?

Measure the length and width of the floor in each room, multiply them to get the floor area, and then add them up. When measuring the wall area, the length and width are also measured to get the wall area and add it up. If there are windows or doors on the wall, you need to deduct the area of the window or wall. Finally, add the total floor area and the total wall area.

The formula for calculating the housing area is as follows: the building area is equal to the sum of the usable area and the pool area; The pool area of the house is equal to the construction area multiplied by the pool coefficient; The pool coefficient is equal to the pool total area divided by the total building area; And the usable area of the house is equal to the sum of all the space areas and the sum of the wall area of the house. Multiply the measured data by the length and width of each space to get the usable area.

What details should I pay attention to when handing over the house?

1, in the process of handing over the house, it is necessary to verify some basic information, such as the actual indoor area of the house is simply measured, the measured data needs to be consistent with the purchased area, and even if there is a difference, it cannot exceed the specified value, otherwise the buyer can claim losses from the developer or directly request to return the house.

2. Property buyers need to inform consumers of temporary conventions such as property fees when signing the purchase contract. In this way, when the house is handed over later, if the property fee increases and is inconsistent with the previous one, it is necessary to negotiate in time and produce the previous documents to ensure the legitimate interests of the individual.

3. In the process of handing over the house, it is necessary to check whether there are obvious quality problems in the house, or whether the actual area of the house is too different from that in the contract. This is not allowed to sign the handover procedures. Be sure to wait for the developer to handle it, and then sign the contract to avoid unnecessary trouble.