What is the bearing standard of cast-in-place floor slab?

When buying a house, in addition to paying attention to the scenery and facilities outside the community, there is another place that cannot be ignored: the floor. The thickness and bearing capacity of the floor determine the stability of the whole structure. Pay attention to the quality of cast-in-place floor when accepting new houses. The following small series will talk to you about the bearing problem of cast-in-place floor slab.

Many friends buy commercial housing, but they don't go to see it when the house is under construction, but I still want to share some related methods with you. The bearing capacity of the floor can be seen from the following aspects:

1, the diameter of the steel bar

As we all know, the thicker the steel bar diameter, the stronger the bearing capacity. Although you can't enter the construction site to build a house, you can see the steel bars when you are preparing to build a house outside, and the diameter of the steel bars can be seen at a glance. After seeing the diameter of the steel bar, everyone knows a little.

2, the thickness of the plate

The thickness of the plate indicates a strong bearing capacity. Thickness largely determines the strength of bearing capacity.

According to China's Code for Load of Building Structures, the cast-in-place floor slab has a live load of 2.0 kilonewtons per square meter, which is about 200 kilograms. When calculating the bearing capacity of floor slab, it should be calculated from the dimensions, density, thickness of cast-in-place floor slab and concrete grade. This can be handled by a professional house inspection team. After all, buying a house requires a family to live, and all aspects must be checked.

In fact, it is not only the acceptance after buying a house, but also the relevant knowledge. You can also ask when buying a house. The clearer the information about the house, the better.

When buying a house, you must look at the floor, and the property will charge the property fee after receiving the house. Don't worry at this time, check it first and pay the fee after confirmation. If there is any problem in the acceptance process, contact the developer immediately, especially if some floor surfaces do crack during the acceptance process. Be sure to check it well, otherwise it will take a lot of time to deal with these problems when decorating in the future.