Job Recruitment Website - Property management company - 202 1 What are the management measures for interior decoration of residential buildings?

202 1 What are the management measures for interior decoration of residential buildings?

As follows:

Fifth residential interior decoration activities prohibit the following acts:

(a) without the consent of the original design unit or the design unit with corresponding qualification grade, changing the main body and load-bearing structure of the building without authorization;

(2) Changing rooms or balconies without waterproof requirements into bathrooms and kitchens;

(3) expanding the original size of doors and windows of the load-bearing wall and removing the brick-concrete wall connected with the balcony;

(four) damage to the original energy-saving facilities of the house, reducing the energy-saving effect;

(five) other acts that affect the safety of building structure and use.

Tenth decoration enterprises must be in accordance with the mandatory construction standards and other technical standards, and shall not cut corners to ensure the quality of decoration projects.

Eleventh decoration enterprises engaged in residential interior decoration activities, should abide by the construction safety operation rules, take necessary safety protection and fire control measures in accordance with the provisions, and shall not use naked fire and welding operations without authorization to ensure the safety of operators and surrounding houses and property.

Twelfth decoration, decoration enterprises engaged in residential interior decoration activities, shall not occupy public space, shall not damage public parts and facilities.

How to determine the acceptance period of residential interior decoration management method 202 1?

Under normal use conditions, the minimum warranty period for residential interior decoration works is two years, and the leakage prevention for kitchens, bathrooms and external walls with waterproof requirements is five years. The warranty period is calculated from the date when the residential interior decoration project is completed and accepted. The specific time needs to consult the property management company.

According to People's Republic of China (PRC) * * * and Management Measures for Interior Decoration of Residential Buildings (Ministry of Construction Order [2002]No. 1 10), it is necessary to sign a residential decoration service management agreement with the property management company before decoration, and the agreement will include the time allowed for decoration.