Job Recruitment Website - Property management company - How long is the renovation period in Shanghai?

How long is the renovation period in Shanghai?

The renovation time in Shanghai is specified as 8: 00 am-12: 00 am and 2:00-6:00 pm from Monday to Friday.

The renovation time of Shanghai was determined according to the Environmental Noise Pollution Law of People's Republic of China (PRC). During 8: 00 a.m. to 12 a.m. and 2: 00 p.m. to 6: 00 p.m. on weekdays, 6: 00 p.m. to 6: 00 p.m., 6: 438+02 p.m. to 6: 08 p.m. and 6: 438+08 p.m. to 8: 00 the next day, it is forbidden to carry out decoration and other nuisance operations in completed residential buildings.

Precautions for decoration:

1. Decoration shall be carried out within the specified time. In case of special circumstances, it is necessary to explain the situation to the property statement and neighbors in time to avoid unnecessary contradictions.

2. Sound insulation measures should be taken during decoration, such as closing doors and windows and cutting off some sound sources.

1, before decoration, the base surface of the house must be cleaned before construction, especially the wall tiles and floor tiles paved must be cleaned before construction.

2. Please ask the decoration company to design the design drawings.

3, according to the use standard and proportion, use the specified label of cement and materials. According to the construction standard and proportion, the bonding slurry used between the ceramic tile and the base should be strictly mixed, and it is not allowed to change materials casually. The designated grade cement and bonding materials must be used.

4, before besmear brushs emulsioni paint, first check whether the scraping of the wall putty is even and smooth, and whether the grinding and roller coating are in place.

Waterproofing between bathroom and bathroom is also the key link of decoration. The usual practice is to block the floor drain before decorating the bathroom and put more than 5 cm of water to carry out the water spraying experiment. If there is water leakage, it is necessary to redo waterproofing; If there is no water leakage, pay attention to the ground laying during construction, do not damage the waterproof layer, and change the water supply and drainage and heating system without permission.