Job Recruitment Website - Property management company - Special emergency plan for flood accidents

Special emergency plan for flood accidents

Special Emergency Plan for Flood Accidents 1 In order to strengthen the campus safety of Star Hope School and establish and improve the safety responsibility system, this plan is formulated in accordance with the principle of "treating both the symptoms and the root causes first", paying attention to implementation, taking effective and concrete measures and timely handling.

I. Guiding ideology

Based on the principle of cherishing life and safety first, fully implement the requirements of county and city flood control work conferences, strictly grasp the weather and climate changes in flood season, and start this plan in time to ensure little or no loss when disasters come, providing a strong guarantee for the safety of teachers, students and schools.

Second, flood control measures

1. Pay close attention to the weather and climate change, master the weather forecast at any time, arrange the work, study and life of teachers and students reasonably, and be ready for emergencies at any time.

2. In case of rainstorm, the school should assign special personnel to guide students to and from school to prevent students from walking on their own. They must contact their parents before quitting. (Teachers in each class)

3, when the flood occurs, should immediately start the plan, command rescue commandos into the state of flood fighting and emergency rescue. (All male teachers)

4. In case of flood in the last class, the command group should reasonably guide the students to move to a safe place under unified command and take precautions against risks.

5. After the disaster, all teachers should focus on the safety of students and immediately enter the situation to ensure road traffic, communication, alarm, emergency rescue and maintenance.

Three. Leading group for flood control work

Team leader: Pipeline Jun (in charge)

Deputy Head: Guan Tengfei (Director of Political Education)

Members: Class teachers of each class.

Responsibilities of the leading group for flood control work:

Responsible for inspecting and supervising the flood control work of the school; According to the water situation, study and formulate flood control plans; Command the flood prevention and rescue team to carry out emergency rescue; Responsible for reporting the disaster situation and handling situation to the superior; Coordinate relevant departments to do a good job in rescue work; Do a good job in dealing with the aftermath.

Fourth, the specific division of responsibilities of personnel.

Pipeline Jun is responsible for arriving at the scene at the first time when the regional flood disaster exceeds the standard. Under the unified arrangement of the county party Committee and county government, the flood control headquarters of the Education Bureau and the central school, he started the flood control and flood fighting work plan, immediately reported the flood situation to the relevant departments and took the initiative to take effective measures.

Guan Tengfei is responsible for coordinating the rescue of the cooperative and village committees, organizing relevant personnel to maintain school order, strengthening security, and protecting the safety of teachers and students and educational assets from losses.

Che Sen and Yang are responsible for preparing for flood control in advance, delaying or advancing the school holiday time according to the flood situation, organizing students to take refuge in a safe place (playground), and organizing teachers or parents to escort students home when necessary.

Li Xuefeng and Guan Huashan are responsible for actively participating in and organizing drainage work, making good use of equipment and tools, and timely drainage.

Verb (abbreviation for verb) material and job security

1, schools should prepare enough shovels, woven bags, lighting tools, portable microphones, etc. And store them temporarily for use.

2, a comprehensive investigation of dangerous houses, toilets, dangerous walls, first of all, self-examination and rectification, at any time to accept the superior inspection, to eliminate hidden dangers in the bud, to ensure the safety of houses in flood season.

3. During the flood season, the school should strictly implement the 24-hour duty system during the flood season, establish a flood disaster reporting system and a recording system, and keep all teachers' communication telephones in a normal state at all times to facilitate the smooth transmission of floods.

Special emergency plan for flood accident 2 1, purpose

Respond to possible special natural disasters, ensure the normal treatment of urban sewage and ensure the safety of the company's property and personnel.

2. Scope of application

This scheme is suitable for the control process of sewage treatment during rainstorm and flood.

3. Responsibility

In order to strengthen the leadership of flood control emergency work, a leading group for flood control emergency work in the factory was established.

4, the flood season on duty

According to the warning level of rainstorm and flood, different administrative duty systems are arranged, and all relevant departments arrange emergency repair personnel to prepare for flood control and flood fighting. Those who are absent without reason will be held accountable. The leading group for flood control and emergency work should do a good job in logistics support according to different duty arrangements.

During flood control and flood fighting, in order to ensure the smooth flow of information, relevant leaders and responsible persons must keep their mobile phones on for 24 hours.

During flood control and flood fighting, the specific duty arrangements are as follows:

In case of blue warning, be on duty according to the normal management system of our factory;

In case of yellow warning, in addition to the normal personnel on duty, the process laboratory department should have one person on duty on rest days and at night;

In the case of orange warning, except the normal personnel on duty on rest days and at night, the operation and maintenance personnel are on duty 1 person, and the flood control and flood fighting team is in place;

During the red warning period, all members of the flood control emergency team were on duty, and the flood control and flood fighting teams were in place.

5, management regulations

5. 1 preparation stage

5. 1.65438+

5. 1.2 Before the rainstorm and flood season come, the emergency repair personnel should repair and maintain all emergency repair equipment to make it in a good standby state.

5. 1.3 Before the arrival of rainstorm and flood, the equipment use department shall inspect the sewage treatment facilities under its jurisdiction to ensure that they are in good condition and have inspection records to check.

5. 1.4 it is necessary to know the weather change trend in time through the forecast of the meteorological station, and implement the flood control measures in time according to the requirements of the superior.

5. 1.5 Before the arrival of rainstorm and flood, all departments should close doors and windows and check whether there are potential safety hazards in indoor hanging objects and fixtures.

5. 1.6 Reserve necessary flood control and disaster relief materials and allocate them reasonably according to the principle of graded responsibility. Reserve a certain amount of emergency materials in key parts of flood control and flood control for emergency use.

5. 1.7 communication preparation, make full use of the internal telephone network and social communication public network in the factory to ensure that the flood control and flood fighting communication system is intact and smooth, and the command and dispatch instructions are transmitted in time.

5.2 Process control

5.2. 1 When there is a large amount of water in flood season and the water level of the collecting well is high, start all pumps to run.

5.2.2 The process laboratory adjusts the process operation plan in flood season according to the actual situation; Adjust the operation conditions in time during flood season, treat as much sewage as possible and reduce the discharge when the water quantity is large and the influent quality is weak, so as to ensure that the total effluent reaches the discharge standard.

5.2.3 During the flood season, the operation team will strengthen the inspection and monitoring of key equipment and parts such as inlet and outlet pumps, inlet and outlet gates of reaction tanks, power transformation and distribution stations, and keep records of equipment operation; When faults and other abnormal conditions are found, they should report to the equipment department or notify the leading group for flood control in time. Strengthen on-site inspection, especially structures, to prevent falling objects in windy weather.

5.2.4 Before the flood season, the machine maintenance class will arrange the inspection and maintenance of key production and operation equipment and substations, and do a good job of rain protection for outdoor equipment. And timely check the grounding situation of machinery and equipment in the whole plant, and timely rectify the facilities with potential safety hazards.

5.2.5 According to the weather forecast, organize operators to check all the equipment in advance to ensure that it is in good condition, and organize forces to dredge the rainwater pipes in the factory area to ensure smooth flow; Timely and effective release of early warning information.

5.2.6 In case of sudden rain, all posts should close the doors and windows to prevent rainwater from flowing in and affecting the equipment operation. The production operation team will increase the number of pumps and reduce the water level of the collecting well until it is full. When going out to patrol, be sure to work in pairs and pay attention to anti-skid. Substation personnel on duty should check whether the lightning protection device works in time; Factory maintenance team members and vehicles should be on call and ready to deal with unexpected accidents at any time.

5.2.7 If the instantaneous flow is too high and all structures are overloaded, you should immediately contact the superior department, and with the consent of the superior department, open the override valve of the primary sedimentation tank to discharge the sewage urgently, so as to ensure the normal operation of the structures and process production of the whole plant.

5.3 Emergency

5.3. 1 If the power outage process fails to operate normally, the personnel on duty should immediately report to the relevant leaders, and stick to their posts and wait for instructions from the leaders.

5.3.2 When rainstorm and flood cause property losses and casualties, the personnel on duty shall immediately report to the relevant leaders and carry out relevant rescue work within their functions and powers.

5.4 Flood control and later flood control

5.4. 1 After the rainstorm and flood, the laboratory personnel should increase the frequency of water quality inspection in and out of the laboratory.

5.4.2 Repair the damage of equipment and facilities caused by rainstorm and flood, and ensure the normal operation of all equipment;

6. Rescue and disaster relief

After the occurrence of a major danger, the leading group for flood control and emergency work should quickly monitor and track according to the nature of the incident, and immediately contact the relevant departments.

The leading group for flood control and emergency work shall immediately put forward emergency treatment measures according to the specific circumstances and plans of the incident for the company or the relevant departments at higher levels or the local government to command and make decisions.

The leading group for flood control and emergency work should quickly mobilize the resources and strength of the department and provide technical support; Organize flood control and thunderstorm resistance personnel to quickly carry out on-site disposal or rescue work.

When dealing with major dangers, it is necessary to have unified command, division of responsibilities, carry out their duties, unite and cooperate, respond quickly, deal with them efficiently, and minimize losses.

7, safety protection and medical rescue

The leading group for flood control and emergency work should attach great importance to the safety of emergency personnel, and mobilize and reserve necessary protective equipment, disinfection drugs, standby power supply and necessary equipment for rescuing the wounded. So that it can be used at any time.

The entry and exit of rescue personnel shall be decided by the leading group for flood control and emergency work as appropriate. Before emergency personnel enter the threatened site, they should take protective measures to ensure their own safety.

The leading group for flood control and emergency work shall, according to the instructions of the local government and the higher-level leading institutions, issue a notice in time to prevent people and animals from entering dangerous areas.

8. Mobilization and participation of social forces

After the disaster occurs, the leading group for flood control emergency work can report to the local government for approval according to the nature and degree of harm of the incident, and implement emergency control on key areas and key parts to prevent the further expansion of the situation and its harm; When necessary, the local people's government can widely mobilize social forces to actively participate in handling emergencies.

9. The emergency is over

When the disaster situation is effectively controlled, the leading group for flood control and emergency work can announce the end of emergency response according to the actual situation.

Materials, equipment, means of transport, etc. In accordance with the provisions of the relevant emergency, it shall return to its original place in time after the end of the emergency. After the emergency disposal, it is necessary to restore the normal life, production and work order in time, repair the infrastructure damaged by water, and minimize the losses and impacts caused by emergencies.

Special emergency plan for flood accidents. The rainy season comes in the flood season. In order to ensure the safe drainage of residential quarters and underground garages, the parking safety of owners' vehicles, and the normal and orderly life order of owners, this emergency plan for flood control work is formulated according to the spirit of flood control work at all levels and the requirements of flood control work for many years, combined with the actual situation of XXXX residential quarters. I hope that the management personnel of our XXXX management office can perform their duties, give full play to the leadership ability of the management personnel, lead the employees of all departments, and do their best to do all the work during the flood control period.

First, the establishment of emergency leading group for flood control work

Team leader: XXX

Team members: XXX, XXX

Emergency rescue team: department heads, office personnel, engineering maintenance personnel, and all security personnel in the management office.

Second, flood control work responsibilities

1, conscientiously implement the spirit of the instructions of the municipal and district property on flood control and drainage, and fully command the flood control work of XXXX community. According to the personnel arrangement of the emergency leading group, all kinds of sudden disasters and accidents in the flood control work of XXXX residential area have been dealt with quickly, timely and effectively. Take effective measures, based on the community, adhere to self-protection and self-help, and ensure community safety in flood season.

2, prepare enough flood control materials, according to the danger, put forward the danger, emergency plan. Responsible for inspecting and supervising the implementation of flood control measures; Responsible for inspecting and supervising the preparation of flood control materials; Ensure the owner's normal life order and property safety, and put an end to the problems such as poor drainage in the sinking area of the community and water accumulation in the basement.

Three, flood control work requirements and measures

1, set up a leading group for flood control and a rescue team. Be specifically responsible for the flood control work of the residential area to ensure the flood control safety and the property of the owner from loss; Collect information such as rain and flood in time; Do a good job in flood prevention propaganda and improve the flood prevention awareness of all owners; Make sure there are no accidents. During flood control, it is necessary to ensure smooth communication, and flood control members and personnel on duty can make 24-hour telephone calls unblocked. The personnel on duty should stick to their posts, and it is forbidden to leave their posts or take off their posts. In case of heavy rain, managers, supervisors and security squad leaders at all levels must arrive at their posts, and office personnel should keep their mobile phones on.

2. Establish a safety responsibility system. The leaders of the management office will assign specific work in place, so that everyone in each area is directly responsible. The accountability system shall be implemented for those who fail to arrive on time and are not seriously responsible for the losses, and those who cause heavy losses shall be held accountable.

3. Contact work. The safety department should provide safety tips to car owners regularly, and establish a good parking order in the basement. Customer service personnel should know the communication contact information of all underground garage owners, notify the owners when necessary, and cooperate with safe evacuation. In case of heavy rain, we should pay close attention to the rain and the unobstructed roads in the community, and be prepared to contact all owners.

4, material preparation and the specific responsibilities of each department. According to the actual situation of XXXX community, we should strengthen the inspection of key parts; Clear division of labor among departments; Before, during and after the rain, there are special personnel responsible for monitoring; And formulate corresponding measures to eliminate risks; The following is a clear division of labor and responsibilities of each department:

Finance Department: Make every effort to protect the life and property safety of the Finance Department. In case of special circumstances, report to the superior immediately. At the same time, assist other departments in disaster relief work.

Public Business Department: When the flood comes, the customer service center should do a good job of reminding all owners. For several floors with relatively serious disasters, it is necessary to focus on recording flood information and call the owner to tell the details when necessary. If there is a distress call from the owner, the detailed address (floor number, unit number, room number and contact information) of the business owner shall be recorded in detail, and it shall be reported to the superior competent department immediately to apply for reinforcements.

Greening and cleaning department: do a good job in greening and vegetation protection and community cleaning during flood season. Take relevant measures to protect the growth of flowers and trees in bad weather. Do a good job in cleaning the community after the rain, and keep every corner of the community clean at all times. Let the living owners feel the fresh and natural environment, and make the living environment of the owners of the community better through our efforts. If there is water in the owner's house or warehouse, it is necessary to cooperate with the engineering department to help the owner do a good job of cleaning and drainage.

Engineering Department: Engineers should regularly check the hydropower equipment in the residential area, and appropriately increase the inspection frequency in flood season to ensure the normal use and safety of the equipment. Check the smoothness and emergency use of all drainage pipes. When the danger occurs, the relief materials include:

1) Emergency lights should have enough power for night use.

2) There are many sandbags. Placing sandbags at the entrance of low-lying areas can intercept water and prevent upstream rainwater from gathering in low-lying areas and causing danger. There are several floors in the residential area, such as A 1, A3, A5, C 1, which are prone to water accumulation, so we should pay close attention to the water accumulation situation. After the disaster, the sandbags should be moved to the hidden area immediately, and the protection work should be done to avoid affecting the next use.

3) Prepare five shovels and five steel bars with hooks, dredge the sewer if necessary, or directly open the manhole cover, so as to speed up the rainwater flow into the sewer and prevent the rainwater from rushing into the garage or warehouse with low terrain. After the disaster, the manhole cover should be put back immediately to avoid danger.

4) Drainage equipment, drainage pump and drainage pipe should be placed in a convenient place, and the working condition of the equipment should be checked regularly. When some pipes are not well drained, the accumulated water in this area should be drained to other well-drained areas by the drainage pump. Clean it after use and store it well.

Security department: do a good job of security in flood season. If you call for help or reinforcements, you should rush to the scene at the first time to do a good job in rescue and security. In case of special circumstances, it shall immediately report to the superior competent department to help the owner solve the problem at a critical moment.

Fourth, start the corresponding plan according to different situations.

(a) the first plan:

When the Meteorological Observatory issued a rainstorm warning, all members of the leading group for flood control work were in place. Timely summarize flood control information and report customs, water conditions and rain conditions. Office staff should be on duty according to their respective responsibilities, further check and implement various flood control emergency measures, set up flood control teams and implement emergency materials.

(2) The second plan:

When the rainstorm strikes or the relevant departments issue an emergency alarm, the leading group for flood control will immediately hold an emergency meeting or make emergency arrangements. The property office should take flood control as the primary task.

(3) The third plan:

In case of sudden rainstorm, the rescue team quickly organizes personnel to check and dredge the drainage pipeline in time to ensure smooth drainage; Monitor the water accumulation in the community and basement, report the disaster situation in time, and organize enough temporary drainage equipment for forced drainage when necessary. Ensure the owner's normal life order and property safety.

The above groups and departments should fulfill their duties and spend the flood season safely to ensure the safety of the owner's life and property and public property. The more critical it is, the more organized and disciplined we should be. Be brave in critical moments and fearless in times of crisis. Always put the interests of the owners first. It is our unshirkable responsibility to reassure the head office leaders and satisfy the owners.

Special Emergency Plan for Flood Accidents 4 I. Purpose

In order to protect the life safety of employees, ensure the life and property safety of engineers when the rainy season comes, ensure the normal construction of the construction site, and control the losses to a minimum, the emergency plan for flood control in rainy season of XXX engineering project department is formulated according to the spirit of relevant flood control documents of the state, province, city and county.

Second, organization.

XXXX project department rainy season flood control emergency leading group:

Team leader: XXX, deputy team leader: XXXX, team member: The leading group for flood control and emergency rescue in rainy season of XXXX Engineering Project Department is located in the project office.

Contact information of third-party rescue:

Emergency telephone 120, alarm telephone 1 10, and fire alarm telephone 1 19.

Third, the basic principles

The flood control work adheres to the principle of "safety first, constant vigilance, prevention first and all-out rescue", actively formulates and implements flood control plans, strengthens drainage measures, scaffolding reinforcement and electrical equipment management inspection, and strengthens weather forecast collection to prevent problems before they happen.

1), XXX is responsible for on-site guidance and coordination of various departments.

2), XXX is responsible for tracking and checking the construction and finished product protection of each operation surface.

3), XXX is responsible for the construction site safety management, to do a good job in rainy summer construction safety education.

4), XXX is responsible for the reasonable stacking of site materials, waterproof and moistureproof, maintenance of various mechanical equipment and preparation of flood control equipment.

5), XXX is responsible for the temporary electricity, equipment and tools for insulation inspection, to prevent wire peeling, leakage, etc.

Four, material preparation:

According to the specific situation of the project department, prepare equipment and materials for flood control. Prepare water pump, water pipe, tarpaulin, shovel, etc. Sufficient rain-proof equipment must be prepared and the required equipment must be kept in good condition.

No. Material Name Unit Quantity Remarks

1 raincoat rain pants cover 50

Two pairs of rain boots are 50 pounds.

3 water pumping station 5

4 cement bags, each 1000

5 Shovel handle 100

Verb (abbreviation of verb) technical guarantee measures:

1, strengthen the inspection of temporary facilities and temporary electricity facilities on the construction site, rectify or replace them in time if they do not meet the standards, and check whether the wires are aging, broken skin and deteriorated. All wires are forbidden to mop the floor or connect with metal equipment. The switch box is forbidden to touch the ground, and rainproof measures are taken to prevent rain and leakage. Neutral wire or grounding must be intact and effective. All kinds of small mobile devices are strictly forbidden to rain, and should be put into storage or covered in time.

2, should do a good job of windproof before the storm, after the rain to timely check the operating surface, outer shelf, and eliminate the danger, operating surface to take corresponding anti-skid measures.

3, stones, sand and other materials, piled up in the special area of the site, special areas should fully do a good job of drainage, to prevent rain erosion.

4. The bottom of the cement in the on-site cement storage warehouse shall be padded and paved with linoleum, and the stacking height shall not exceed 10 package. Thoroughly check the waterproofing of the cement silo roof, save for a rainy day, and prevent the cement from being damaged by rainwater leakage.

5, scaffolding, tower crane and other equipment should conduct a comprehensive inspection before the arrival of the rain period, eliminate hidden dangers, and often check its safety situation, prevent the foundation from sinking, and check whether the lightning protection measures are complete and good, and whether the grounding resistance meets the requirements; Aerial work should be avoided in thunderstorm days, windproof facilities should be made before the storm comes, and the danger should be checked and eliminated in time after the rain.

6, mechanical and electrical equipment should take rain, flood control measures, installation of grounding safety devices, power lines should be well insulated, should have perfect protection to zero.

7, the personnel on duty should listen to and record the weather forecast in time, and do a good job of prevention in time.

8, to strictly implement the 24-hour duty system, when there is a flood or disaster, immediately report to the superior leadership. And take effective measures when reporting.

9. The mobile phone of flood control team members must be turned on 24 hours a day.

Six, production self-help recovery measures and procedures

1, after the emergency rescue, organize the construction personnel to save themselves in production immediately. The first is to investigate and eliminate dangerous situations and hidden dangers.

2, continue to observe the danger, and get in touch with the local flood control and flood fighting units, to provide a reliable basis for the resumption of production, and at the same time get the support and assistance of the local flood control and flood fighting units.

3. For the damaged facilities, a repair plan and preventive measures for re-distress should be formulated, and construction and production can be resumed only after the approval of relevant departments and the implementation of repair and rectification.

Special emergency plan for flood accidents 5 I. Basic situation of water conservancy around our school

Our school is behind the railway station, and the opening of Tuzhuang Railway Bridge is the only way for our school. The steep terrain, many vehicles, perennial water in the cave, waist-deep in the rainy season, pose a great threat to teachers and some students. In addition, there is a reservoir in the west of Tuzhuang village where our school is located, which is unguarded. Children often go there to take a bath, which can easily cause drowning accidents, which is a great safety hazard for our students. The school buildings in our school are old and disrepair, and there are cracks in the house, as well as potential safety hazards.

Second, the guiding ideology and measures of flood control work

The guiding ideology of flood control work is to put flood control work in an important position. Adhere to the principle of "safety first, prevention first". Flood control measures: ① implement the leadership responsibility system for flood control and the principle of "unified command, division of responsibilities and active guidance"; (2) It is forbidden to jam and pile up sundries in flood season; ③ Keep flood control roads unblocked.

Three. Leading group for flood control work

Team leader: Song Jun

Deputy Team Leaders: Zhang Yang and Yang Hui.

Members: Li Hongmin, Pan Guihua, Wang Xiuying and Feng Yujiao of the headquarters: The task is to organize emergency rescue and the safe transfer of teachers and students, report the development of the disaster to the superior in time, and coordinate with the logistics headquarters to arrange emergency rescue personnel and flood control materials.

Commander: Song Jun.

There are two groups:

Technical personnel group: the task is to master the local customs, rain and water conditions. Pay close attention to weather changes and the development of flood danger, be a good staff officer and provide emergency decision-making plans.

Team leader: Zhang Yang

Members: Feng Yujiao, Gu Jia.

Rescue team: the task is to rescue and report the danger to the commander in chief in time.

Team leader: Zhang Yang

Members: Xu Baosheng, Yang Hui

Logistics headquarters: responsible for organizing, coordinating and ensuring the supply of flood control materials. Pan Guihua is in charge.

Four, in the face of disasters and dangers of emergency action plan

In case of rainy day, send teacher Feng Yujiao to the south bridge entrance first, and then let the students go after making sure there is no danger for teachers and students to pass. If you can't pass safely, arrange teachers and students to choose other routes; Establish a student contact network, notify parents to pick up and drop off, or make other arrangements to ensure the safety of teachers and students.

Safety education should be given to students in summer vacation and holidays, and they should be warned not to play and swim in reservoirs and other places. If they go, they must be accompanied by an adult.

When a dangerous situation may occur, relevant personnel should strengthen their duty and patrol, and report to their superiors and village committees.

In case of distress, organize emergency rescue quickly and report to the Education Bureau and the campus in time.

Basic points of flood control and emergency rescue:

1, the school prepares sandbags, stones and other materials for emergency use.

2. After all-out rescue fails, teachers and students should be quickly transferred according to the development of danger, and the rescue team is responsible for organizing and directing the transfer. The principle to be followed when transferring: Go up high and move to a place where there is no river nearby.