Job Recruitment Website - Property management company - Matters needing attention in property right registration in construction preparation
Matters needing attention in property right registration in construction preparation
First, the provisions before the registration of property rights:
Matters needing attention stipulated in the Measures for the Administration of Building Decoration are as follows:
1, in the process of architectural decoration design, it is necessary to take relevant measures to control all kinds of dust and waste generated in the construction process and reduce the pollution and harm to the environment on the premise of not affecting the normal life and work of residents and ensuring the personal safety of on-site personnel.
2. During the senior high school entrance examination and college entrance examination, except for emergency repairs, all decoration activities that can produce noise are prohibited.
Second, the matters needing attention before the registration of property rights:
1, to minimize all potential safety hazards that may cause accidents (such as unauthorized modification or addition); Do a good job in post-treatment to reduce the frequency of problems in property maintenance in the future.
2. Strictly abide by the Code for Building Decoration Construction Engineering and relevant laws and regulations. If personal injury or property loss is caused by decoration construction or other acts, the responsibility shall be borne by the decoration owner.
Three, the property right registration before the start of the code:
1. The owner shall not change the design appearance of the exterior of the house, any public facilities such as tube wells and the main structure of the building.
2. The owner shall not hang and install anything outside the window, and shall not place anything and build buildings in public areas.
3. The owner shall not affect the normal life and safety of other residents when decorating furniture and various electrical equipment.
4. The owner must carry out the construction within the specified construction time, and shall not let the noise generated by the construction affect the rest of the residents in the community (the general construction time is from 08: 00 am to 20: 00 pm).
- Related articles
- Huanggang Xishui Wanjing chu garden, where is it?
- Products, services and services of Tengzhou dry goods wholesale market
- How about Wulian Daye Forging Co., Ltd.?
- What is the price of ocean scenery in Zengcheng?
- What is the surrounding environment of Guo Mao Runyuan? Is life convenient?
- Water saving measures
- Which developer is Changsha Xiangjiang No.1?
- Research report on the history and present situation of Shen surname
- Is Yuncheng Economic Development Zone Xincheng Property Management Co., Ltd. a state-owned enterprise?
- Case site customer service work content