Job Recruitment Website - Property management company - Notice of rectification of potential safety hazards

Notice of rectification of potential safety hazards

Notice of rectification of potential safety hazards (select 6 articles)

Potential safety hazards refer to various problems, defects, faults, signs, hidden dangers and other unsafe factors caused by human factors, material changes and environmental impacts in daily production processes or social activities. If they are not found, discovered and eliminated, it will disturb and affect the normal production process or social activities. This article is the Notice of Rectification of Potential Safety Hazards compiled by me for your reference only.

Selection of rectification notice for potential safety hazards 1

Mining companies:

On June 24th, 20__, the town government inspected the safety in production in the exploration and mining operation area of Group 4 of Yingshi Mine in Longtan Village. After on-site inspection, we found that your company has many security risks. The potential safety hazards and rectification opinions are hereby notified as follows, please make rectification seriously.

First, there are security risks.

1, safety knowledge propaganda is not in place, and warning signs and warning signs are not set in dangerous operation areas.

2. The safety production management system is not perfect, and there is no public safety management system and no safety production record in the operation area.

3. There are no safety warning signs and road signs in dangerous sections of the mining area; Workers' access roads are steep and there are no safety protection measures.

4. The reinforcement measures of the mining portal are not perfect, and there are hidden dangers of collapse; There are no safety protection measures in the temporary storage area, and there are hidden dangers of landslides.

5. The workers' living area is close to the mining area, and it is located at the mouth of the cave or downstream of the ravine, which lacks safety precautions and has potential safety hazards.

6. Workers' food hygiene conditions are poor, facilities are simple, and there are hidden dangers of food hygiene and safety.

7, mine fire prevention, flood control, safety production plan is not perfect.

Second, the rectification opinions

1, strengthen the publicity of safety production knowledge. Strengthen the daily safety education of workers. Improve workers' self-safety awareness through publicity.

2. Make fixed warning signs and safety slogans on construction sites, construction sites and roads to create an atmosphere of publicity and education on safety production.

3. Reinforce the holes and roads with potential safety hazards according to technical standards. Drainage ditch must be built above the hole to prevent landslide or collapse.

4. Improve workers' accommodation conditions. Outside the mining operation area, select safe areas and build workers' sheds to meet the basic safe accommodation conditions of workers (2 months rectification period).

5. Improve workers' dietary conditions and pay attention to food hygiene. Improve food poisoning prevention measures.

6, the establishment of production safety inspection log. Personnel in charge of production safety should insist on daily inspection of key areas, places and roads, and deal with hidden dangers in time.

7, adhere to the system of leadership shift well; Establish a registration system for workers entering and leaving wells.

8, improve the safety system, determine the full-time security officer, clear responsibilities, strengthen monitoring and inspection, and make safety production records.

9, improve the fire prevention, flood control, production safety and other related plans.

10, strengthen the guard management, and refuse irrelevant personnel to enter the mining operation area.

1 1. Handle relevant licensing procedures in time.

There are potential safety hazards and rectification opinions above. Please attach great importance to it, study it carefully, formulate rectification measures as soon as possible, and rectify it item by item. Except for item 4, all rectification opinions must be put in place before April 24, and the rectification situation will be reported to the town government.

Yingpan Town People's Government

June 24, 20_

Selected notices of rectification of potential safety hazards II

Xincheng Real Estate Development (Wuxi) Co., Ltd.:

I, with my ID number, signed the Commodity House Purchase and Sales Contract (ContractNo.: CPCB, hereinafter referred to as the "Contract") and signed it with your company on 200X. As the buyer, I purchased Block B of Shangjincheng, a real estate residential project developed by your company (hereinafter referred to as "the house"), and paid all the house price to your company in the form of down payment and bank loan for a term of X years. Your company failed to deliver the house that meets the statutory and agreed conditions within the contract period, that is, before April 30, 20__, which constitutes a serious breach of contract. We hereby send you a rectification notice within a time limit, and explain the reasons as follows:

1. The house delivered by your company does not meet the legal delivery conditions.

1. Your company refused to issue the house acceptance certificate of the residential project quality and the household acceptance record of the project completion.

Engineering Acceptance Record Form ",firstly, according to Article 2 of the Measures for the Administration of Quality Acceptance of Residential Engineering in Wuxi (Trial), the household acceptance of residential engineering quality refers to the special acceptance of the public parts of each household and unit project in accordance with the qualified construction drawing design documents, national engineering quality acceptance specifications, Jiangsu Province's" Control Standards for Common Quality Defects of Residential Engineering "and other relevant technical standards before the completion acceptance of the unit project. These Measures shall apply to the household acceptance, supervision and management of the quality of residential projects within the administrative area of this Municipality.

The fifth copy of "Residential Engineering Quality Acceptance Record" shall be handed over to the residents together with the "Residential Engineering Quality Guarantee" when the house is delivered.

However, your company failed to issue the household acceptance record of residential engineering quality.

Secondly, the People's Republic of China (PRC) Urban Real Estate Management Law (Amendment) stipulates that the design and construction of real estate development projects must conform to the relevant national standards and norms. Real estate development projects can only be delivered after completion and acceptance. Article 17 of the Regulations on the Management of Urban Real Estate Development and Operation stipulates: "Real estate development projects can only be delivered for use after they are completed and accepted; Without acceptance or unqualified acceptance, it shall not be delivered for use; After the completion of a real estate development project, the real estate development enterprise shall submit an application for completion and acceptance to the real estate development department of the local people's government at or above the county level where the project is located. The competent department of real estate development shall, within 30 days from the date of receiving the application for completion and acceptance, organize relevant departments or units such as project quality supervision, planning, fire protection and civil air defense to conduct acceptance. Accept content related to public safety. " . On April 7, 20__, People's Republic of China (PRC) * * * and the Ministry of Construction issued Decree No.78, Interim Measures for the Administration of the Completion Acceptance and Filing of Housing Construction Projects and Municipal Infrastructure Projects.

Article 4 stipulates that "the construction unit shall file with the construction administrative department of the local people's government at or above the county level where the project is located in accordance with the provisions of these Measures within 15 days from the date when the project is completed and accepted", and Article 6 stipulates that "the filing organ shall sign the receipt of the completion acceptance filing documents submitted by the construction unit after the verification documents are complete". Accordingly, "commodity house acceptance" refers to the record form of project completion acceptance obtained through completion acceptance. Now your company refuses to show the acceptance certificate of the above-mentioned house, indicating that the house does not meet the delivery conditions, and the buyer has the right to refuse to accept the house.

2. The residential quality guarantee issued by your company is incomplete, lacking the completion acceptance time, the reply time of the quality warranty department and the reasonable service life of the project.

3. The instruction manual of residential buildings issued by your company is incomplete, lacking the rating of residential performance, especially in the content of energy-saving forms of residential buildings as part of the contract, lacking relevant data such as heat transfer coefficient and shading coefficient.

Article 8 of the contract stipulates: "The seller shall deliver the commodity house that meets the following conditions (that is, the commodity house has passed the acceptance) and conforms to the contract to the buyer before April 30, 20, in accordance with the relevant regulations of the state and local people's governments."

Article 11 of the contract stipulates: "After the commercial house meets the delivery conditions, the seller shall notify the buyer in writing to handle the delivery procedures. When both parties make acceptance and handover, the Seller shall present the supporting documents specified in Article 8 of this contract. If the seller fails to produce the supporting documents or the supporting documents are incomplete, the buyer has the right to refuse delivery, and the responsibility for overdue delivery shall be borne by the seller. "

According to the provisions of the above-mentioned laws and regulations and the stipulations of this contract, the buyer thinks that the buyer has the right to refuse to accept the house because your company failed to produce legal and agreed documents when delivering the house, and the liabilities for overdue delivery and breach of contract arising therefrom shall be borne by your company.

housing problem

1. See the annex for the quality standards and inspection results of the house inspection.

2. The air-conditioned seat cannot be installed.

3. There is insufficient sunshade for the external window. According to the relevant contents of the "Residential Instruction Manual" issued by your company, the sunshade form for the external window of residential energy saving is other. According to Article 35 of the Energy Conservation Law of People's Republic of China (PRC), the construction, design, construction and supervision units of construction projects shall abide by the building energy efficiency standards.

Construction projects that do not meet the building energy efficiency standards shall not be approved by the competent construction department; If construction has started, it shall be ordered to stop construction and make corrections within a time limit; Those that have been built shall not be sold or used.

The competent department of construction shall strengthen the supervision and inspection of the implementation of energy-saving standards for buildings under construction.

Article 36 When a real estate development enterprise sells a house, it shall clearly indicate to the purchaser the energy-saving measures of the house sold, the warranty period of the thermal insulation project and other information. , should be stated in the housing sales contract, quality guarantee and instructions for use, and be responsible for its authenticity and accuracy.

According to the "Implementation Opinions on Further Strengthening the Energy-saving Work of Civil Buildings in Our Province", Su Jianke [20 _ _] No.206.

(nineteen) energy-saving design must fully consider the factors such as architecture, structure, materials, equipment and environment, and carry out system optimization and technical integration. The location, layout, orientation, spacing and height of buildings should be planned and designed reasonably. We should actively promote the application of energy-saving doors and windows and insulating glass; Non-energy-saving glass curtain walls and windows are strictly prohibited; External shading measures must be taken for external windows to limit the use of convex windows; In addition to the above provisions, public buildings should also limit the area of the transparent central hall on the roof and reasonably design the indoor space and height.

To sum up, the buyer believes that your company's failure to deliver the house that meets the contractual conditions and legal conditions before April 30, 20__ has constituted overdue. Therefore, the buyer has the right to reject the house that does not meet the delivery conditions, and ask your company to rectify the non-conforming part within a time limit. What can be rectified must be rectified, such as external shading, and what cannot be rectified must be replaced by other means (such as cash or other compensation). From May 1 20__, your company will rectify the above problems within 60 days. After the rectification is completed, you need to issue a written notice to the buyer stating that the rectification is completed and stamp your official seal. The delay in delivery caused by this shall be borne by the seller. Compensation will be charged according to legal norms, contracts and actual delivery dates. The property fee shall be calculated from the date of actual delivery. According to the principle and spirit of fairness, justice and openness of the law, I hope that the seller will fulfill the obligations and responsibilities stipulated in the law and contract with a positive attitude, excellent service awareness and professional quality, and properly solve the problem; Party B reserves the right to use all legal means to safeguard its rights and interests; All losses caused by the seller's inaction, negative behavior and illegal behavior shall be borne by the seller.

Hereby inform!

Buyer: (signature)

May x, 20__ _

Selected notices on rectification of potential safety hazards Part III

Unit:

After investigation and inspection of your company's production safety, your company has the following problems:

In order to ensure safety, your unit is required to rectify all hidden dangers in place before, and report the rectification situation to the town safety Committee in writing. Otherwise, you will apply to the relevant law enforcement departments to make an administrative penalty decision on your unit, and investigate the responsibilities of relevant personnel according to the relevant laws and regulations of the Safety Production Law.

Inspector's signature: signature of the person in charge of the inspected unit:

date month year

Notice of rectification of potential safety hazards selected 4

Company:

On, Gaojiaying Town People's Government expressed its concern about your company in this area.

The field of safety production inspection. After on-site inspection, we found that your company has many security risks. The potential safety hazards and rectification opinions are hereby notified as follows, please make rectification seriously.

First, there are security risks.

1, safety knowledge propaganda is not in place, and warning signs and warning signs are not set in dangerous operation areas.

2. The safety production management system is not perfect, and there is no public safety management system and no safety production record in the operation area.

3. There are no safety warning signs and road signs in dangerous sections of the mining area; Workers' access roads are steep and there are no safety protection measures.

4. The reinforcement measures of the mining portal are not perfect, and there are hidden dangers of collapse; There are no safety protection measures in the temporary storage area, and there are hidden dangers of landslides.

5. The workers' living area is close to the mining area, and it is located at the mouth of the cave or downstream of the ravine, which lacks safety precautions and has potential safety hazards.

6. Workers' food hygiene conditions are poor, facilities are simple, and there are hidden dangers of food hygiene and safety.

7, mine fire prevention, flood control, safety production plan is not perfect.

Second, the rectification opinions

1, strengthen the publicity of safety production knowledge. Strengthen the daily safety education of workers. Improve workers' self-safety awareness through publicity.

2. Make fixed warning signs and safety slogans on construction sites, construction sites and roads to create an atmosphere of publicity and education on safety production.

3. Reinforce the holes and roads with potential safety hazards according to technical standards. Drainage ditch must be built above the hole to prevent landslide or collapse.

4. Improve workers' accommodation conditions. Outside the mining operation area, select safe areas and build workers' sheds to meet the basic safe accommodation conditions of workers (2 months rectification period).

5. Improve workers' dietary conditions and pay attention to food hygiene. Improve food poisoning prevention measures.

6, the establishment of production safety inspection log. Personnel in charge of production safety should insist on daily inspection of key areas, places and roads, and deal with hidden dangers in time.

7, adhere to the system of leadership shift well; Establish a registration system for workers entering and leaving wells.

8, improve the safety system, determine the full-time security officer, clear responsibilities, strengthen monitoring and inspection, and make safety production records.

9, improve the fire prevention, flood control, production safety and other related plans.

10, strengthen the guard management, and refuse irrelevant personnel to enter the mining operation area.

1 1. Handle relevant licensing procedures in time.

There are potential safety hazards and rectification opinions above. Please attach great importance to it, study it carefully, formulate rectification measures as soon as possible, and rectify it item by item. Except for item 4, all rectification opinions must be put in place a few days ago and reported to the town government.

Gaojiaying Town People's Government

20__ year x month x day

Notice of rectification of potential safety hazards selected 5

_ _ Workshop (_ _ Department):

On-site inspection by personnel organized by the company found that your workshop (department) has the following potential safety hazards:

1. The fire extinguisher failed to report to the company and was replaced.

2. Individual employees failed to wear labor protection articles as required.

3, three lathe workers in the job, not strictly implement the post operation procedures. Now you are required to immediately organize personnel to rectify the above security risks, and report to the company's safety production management office, and the company will arrange personnel to conduct a review. Inspector (signature):

Person in charge of the inspected workshop (department) (signature):

Book the sun and moon years ago.

Selection of rectification notice for potential safety hazards 6

Notice of rectification of property within a time limit

Company x:

According to the relevant regulations of Property Management Co., Ltd., the Property Management Center conducted supervision and inspection on your company's site on, and found that your company has the following major (general) hidden dangers. Please complete the rectification within _ _ x days after receiving this notice, and send the rectification to the property management center for acceptance within _ _ x days.

Property Management Center

20 1x year x month _ _