Zhenjiang fire protection qualification handling process? Which organization is good for Zhenjiang fire protection qualification?

1. Zhenjiang fire protection qualification is divided into Grade I and Grade II. Six years of experience in handling Zhenjiang fire protection qualification to share relevant contents and knowledge.

Experience sharing of Zhenjiang fire qualification management

Second, there are many fire-fighting qualification institutions, and there is no best, only better. It is suggested to compare and choose from multiple angles.

Three. The basic conditions and requirements for the first-class qualification of fire control facilities are shared as follows.

1, enterprise assets

Net assets 10 million yuan or more.

2. Key personnel of the enterprise?

(1) There shall be at least 5 first-class registered construction engineers in mechanical and electrical engineering.

(2) The technical director has more than 10 years working experience in technical management of fire control facilities engineering construction, and has the senior title of engineering sequence; There are not less than 10 people with intermediate or above titles in HVAC, water supply and drainage, electrical and automation majors, and the majors are complete.

(3) There shall be no less than 20 construction site management personnel with certificates, and the builder, quality engineer, safety officer, material engineer and documenter shall be complete.

(4) There shall be no less than 30 skilled workers at or above the intermediate level who have passed the examination or training.

3, enterprise engineering performance

In recent five years, he has undertaken two fire control facilities projects with a single building area of over 40,000 square meters (each project includes automatic fire alarm system, automatic fire extinguishing system and smoke control and extraction system), and the project quality is qualified.