How to write the model essay of the house maintenance acceptance report?

The following is a detailed introduction to the model of house maintenance acceptance report:

The house maintenance acceptance report can be described in three parts. First, it can describe the scope of acceptance; Second, it can describe the standards of house maintenance and acceptance; Third, it can describe the acceptance record.

Model report on house maintenance and acceptance 1:

Project address: Designer: Project Manager: Party A:

Party B:

Instructions for use:

Party B entrusts the existing site to carry out on-site decoration construction. In order to ensure the smooth progress of the project quality, Party A and Party B * * have conducted on-site acceptance monitoring of this project, and the specific acceptance report is as follows:

A, auxiliary materials acceptance report:

Party A: Date, 20.

Party B: October 20th.

sun

Party A: Date, 20.

Party B: Date: 20.

Party A: Date, 20.

Party B: Date: 20.

Party A: Date, 20.

Party B: Date: 20.

Second, the project quality acceptance report:

1. Reconstruction category: demolition of walls, opening of holes, old walls and old floor tiles, and original entities required by design.

Fixed furniture and old water and electricity.

Party A: Date 20; Party B: 2 years1February 20th. Foundation engineering: new wall, light brick wall and gypsum board partition wall shall be built according to the design requirements.

Equal partition wall

Party A: Date 20; Party B: March 20th. Circuit reconstruction project: all circuits must wear PVC flame retardant tubes, height: switch.

1.35m, ordinary socket 0.3m, special socket according to the location of the site, all pipes are horizontal and vertical, and some pipes cannot wear yellow wax sleeve PVC flame retardant pipes or PVC corrugated pipes; Strong current and weak current pass through pipes respectively; Check the insulation value with a high voltage ohmmeter; Check whether the resistance is weak, and check before sealing the pipeline.

Party A: Date 20; Party B: April 20th, four years. Water pipe installation project: surface waterproofing agent for kitchen and bathroom is added with Huaxin 325 cement.

Brush the waterproof layer three times into a paste. The waterproof layer should be 300mm high on the wall, and the water pressure should be 0.8Mpa for 24 hours. Tiles can only be laid after the consent of Party A..

Party A: Date 20; Party B: 5. Woodworking project: on-site wooden furniture wardrobe. On-site fixed furniture should meet the requirements of the drawings.

Seek construction.

Party A: Date 20; Party B: June 20th, 2006. Paint project: roll 80 1 glue at the base of the wall, scrape putty powder at the bottom twice to make the wall

Roll-coat (or spray-coat) surface latex paint on both sides to ensure that the error is within 3 mm 4 m; Fixed furniture should be painted according to the requirements of drawings, with primer twice and topcoat five times. Party A: Date 20; Party B: 7. Installation works: installation of lamps, hardware, switch sockets, etc.

Party A: Date 20; Party B: August 20, 2008. Completion acceptance: site engineering cleaning, walls, floors, furniture, doors and windows, etc.

dustless

Party A: Date 20; Party B: Date: 20.

Three, engineering change and increase or decrease:

Fourth, the project delay change:

House maintenance acceptance report model essay 2:

Yunyang Central School: Yunyang Central School: Our original computer room, concierge and office have been built for nearly twenty years. Due to disrepair, the original computer room, concierge and office of our school have been built for nearly twenty years. Due to years of disrepair, there have been serious quality and safety hazards. There have been serious quality and safety hazards. The roof collapsed in 2000 and could not be used normally. One: The original computer room was demolished when the roof collapsed in 2008, and it can't be used normally. Two: some areas of the roof of the gatehouse with more rain this year leaked soil, and the wall was not firm. This year, some areas of the roof of the porter with more rain leaked soil, and the wall was not solid enough for people to live in. Can't live. Three: the roofs of offices, audio-visual classrooms and computer rooms also have a small amount of water seepage and rain leakage, but the roofs of offices, audio-visual classrooms and computer rooms also have a small amount of water seepage and rain leakage, so they should be used. Use. In view of the above-mentioned housing quality and safety problems, it is necessary to do the following repair and maintenance work in view of the above-mentioned housing quality and safety problems in our school: 1 Cover the roof of the original computer room and build a concrete surface. Transform it into a bungalow. Cover the roof of the original computer room and build a concrete surface. Transform it into a bungalow. Two: repair six areas with serious water leakage, such as offices and classrooms. Repair six areas with serious leakage, such as offices and classrooms. Now, I'd like to submit an application report for the maintenance of the gatehouse in our school. And hope to approve the application report for the maintenance of our school gate building.

Yunyang Zhongjie Primary School 2011-11-22

House maintenance acceptance report model essay 3:

About Baizhuang Spring Blossoming Community 19 Building 1 Unit 1 103 Room

Reports on serious housing quality problems

Wuhu Construction Engineering Quality Supervision Station:

I am the owner of Baizhuang Chunnuanhua Community/building KLOC-0/9/unit 1103. After the delivery of the house in June 2008, I renovated the house in June 2009, and found that the house had the following quality problems:

1, four windows in bedroom and master bedroom are leaking.

2. The gables on the west side of the master bedroom are leaking.

3, stair beam brick-concrete junction seepage.

4. The indoor clear height is insufficient, the roof is inclined, and the height difference between the two ends is 4cm.

5. The water seepage of the wire and tube penetrates into the main control box of the power supply, causing great security risks and often tripping for no reason.

6. The gables on the west side of thermocline ooze water.

7. The window of the study room on the thermocline is seriously seeping.

8. The glass top of thermocline platform is leaking.

The above problems were confirmed as building quality problems after on-site inspection by professional technicians of civil engineering in property management company. The development company organized personnel to repair the above problems and promised that all of them were qualified. However, after the renovation was completed and I moved in, some of the problems mentioned above were not repaired, and they were repaired five times, but none of them were in place. After I moved in, I spent a lot of time and manpower in the endless maintenance of the development company. The same question once or twice. I didn't see the maintenance effect and didn't solve the fundamental problem for myself.

After the rain, the following problems appeared again.

1, the glass top of the platform penetrated into the floor, causing a large area of wooden floor to bulge.

2. The bedroom floor bulges in a large area due to the glass seepage from the balcony ceiling.

3. Water seepage in the window of the study room leads to a large area of moldy wallpaper.

4. The floating window in the master bedroom oozes water, which leads to the moldy and bulging of the decorated window wood.

According to Article 6 of People's Republic of China (PRC) Contract Law and Wuhu Commodity House Quality Guarantee, I request:

1. The development company must organize personnel to repair the above problems as soon as possible, and make it clear that one-time maintenance is in place, and promise to take measures to protect furniture and other decorative products during maintenance.

2. The development company must bear the loss cost caused by house maintenance 100000.00 yuan (including rework cost, lost time, sanitation and cleaning cost, and house rental fee caused by inability to move in).

I hope that the leaders of the quality inspection station will take some time out of their busy schedules to solve the above problems fairly.

Baizhuang Spring Blossoms 19 Building 1 103 Unit 1 Room Owner: (Lu Jingjing)

20 10 July 13

The above is what Bian Xiao shared today, and I hope it will help everyone.