Job Recruitment Website - Property management company - Verification period of Fujian electric energy meter
Verification period of Fujian electric energy meter
The verification period of Fujian electric energy meter is two years. For single-phase meters, the verification period should be determined according to the metrological verification regulations of the national technical supervision department. The inspection period of one-way meter for ordinary residents is about five years. For three-phase meters, the inspection period should also be determined according to the verification regulations of the national technical supervision department. The length of inspection period is directly related to the nature of power load and the amount of electricity used. The more important the load, the shorter the inspection period.
- Previous article:Why did the Li Ka-shing family sell assets in China and Hongkong?
- Next article:When does Fushun Fangda Shangcheng open?
- Related articles
- Does the community compensate for the property loss of the battery car?
- How about the property of Lun Jia Century Park in Anshan?
- What do you mean by specific target projects?
- I am in Zhong Da Bailu, Kunshan, close to the world. Which bus should I take to Suzhou Hanshan Temple? Please tell me the details. Thank you.
- Direction sign of residential property
- How to defend rights? How to build flue exhaust fans in residential storefronts will affect how residents upstairs defend their rights and dismantle them.
- Where is the address of Anyue Hengxin Rongting?
- What grade does Nanning Zhonghai Banshan No.1 Middle School belong to?
- Tianjin Yibang Building Decoration Engineering Co., Ltd. Recruitment information, what about Tianjin Yibang Building Decoration Engineering Co., Ltd.
- What is the ranking of CB Taihe Property?