Job Recruitment Website - Recruitment portal - When did Shenzhen start to have subways?

When did Shenzhen start to have subways?

Shenzhen began to have a subway on February 28th, 2004.

Historical evolution of Shenzhen subway;

In April 2002, Shenzhen Metro held a preliminary design review meeting for the extension. The preliminary design of the extension of Shenzhen Metro 1 Line 1 passed the evaluation. The main line of the expansion project is 2.468 kilometers long, with two stations (OCT Station and Window of the World Station), with an additional investment of 967.6 million yuan, and the design standard of the first phase project is adopted.

On June 30th, 2003, the first phase of 165438+ subway was electrified.

On April 28th, 2004, the arrival ceremony of the first train of Shenzhen Metro was held in Zhuzilin Depot. On February 28th, 65438, the first phase of Shenzhen Metro was put into trial operation.

Service time

The first/last bus of Shenzhen Metro leaves from the departure stations of each line at 6:30/23:00 respectively (only the last bus from Qianwan Station to Huangbeiling Station of Metro Line 5 is at 23:03).

During the National Day, the subway operation time may be adjusted. At that time, passengers can pay attention to relevant announcements. For example, during the May 1 ST Labor Day in 20 17, the whole network implemented an extended working day chart and a holiday operation chart respectively, extending the operation time by 1 hour, and the operation time was from 6: 30 to 24: 00.

Baidu Encyclopedia-Shenzhen Metro