Job Recruitment Website - Recruitment portal - What are the specific operations of the high-speed web slitter?
What are the specific operations of the high-speed web slitter?
1. Turn on the electrical isolating switch (set in front of the electrical control cabinet), press the emergency stop reset and prepare for operation button, turn the machine (main console) with the key, and check whether the voltage (380V) and current are correct and stable.
2. Turn on the power switch of the hydraulic system (set on the main hydraulic drive frame) and check whether the oil level and pressure gauge display of the main hydraulic drive system are correct and stable.
3. Open the pneumatic cut-off valve (set on the intake pipe below the pneumatic control cabinet) and check whether the air pressure is correct (not less than 6.0bar) and stable.
Second, the setting control
1. Set the cutting menu according to the film type, thickness, length and width arranged in the cutting program.
2. Extract the corresponding BOPP membrane file from PDF.
3. Set the film winding length and width of corresponding specifications.
4. Select the corresponding winding station, adjust the roller arm and roller, and install the paper core with corresponding specifications.
3. Feeding, film piercing and pasting
1. Feeding: according to the requirements of the cutting scheme, the operating rules of the vehicle and the actual situation, hang the corresponding main coil on the aging frame, place it on the unwinding frame of the cutting machine according to the direction selected inside and outside the corona surface, clamp the steel core by the control button, and leave the steel core support arm and the vehicle.
2. Film piercing: When there is no film on the slitting machine, film piercing is required. Using the function keys of the film piercing device and the slitting machine, tie one end of the original film to the eye of the film piercing chain, and start the film piercing button to make the film evenly distributed on each roller along the direction of the slitting process.
3. Film splicing: When there is film on the slitting machine and the roll joint is changed, start the film splicing table to the working position with the vacuum film splicing table, manually flatten the film on the first traction roller of the slitting machine, start the upper vacuum pump to suck the film, make the film evenly adsorbed on the film splicing table, stick double-sided adhesive tape and cut off the excess film under the adhesive tape, flatten the film on the unwinding frame and start the lower vacuum pump to evenly adsorb the film, flatten the film, and join.
Fourth, the boot operation
1. Change the specification, put the paper core on the inner and outer winding arms, and notify all personnel to leave the machine and get ready for operation when the press roller is in the operation preparation state.
2. Set the anti-static bar on the main operating platform to automatic, turn it on for operation, and start the machine to run.
Verb (short for verb) cutting control
During the cutting operation, the cutting effect should be carefully monitored and observed, and the cutting speed, unwinding tension, contact pressure, arc roller, edge roller and leading edge should be properly adjusted and controlled.
Intransitive verb receiving material
1. When the machine stops running after winding the inner and outer ends, use the film unloading button to put the film on the prepared film unloading trolley, cut the film, and stick the film roll with sealant.
2. Use the chuck release button to release the chuck, and check whether each film core leaves the paper core. If one end is still stuck on the paper core, manually unload the film roll.
3. Make sure all films leave the chuck and put them on the trolley, then use the film loading button to raise the winding arm, install the corresponding paper core, and stick the films neatly on the paper core for the next cutting.
Seven, parking
1. When the film roll runs to the set length, the equipment will stop automatically.
2. During the operation of the equipment, if necessary, press the machine stop button to stop the operation.
3. When quick stop is needed, press the machine stop key for more than 2 seconds.
4. When there is an emergency such as equipment or man-made accident, press the emergency stop button to make an emergency stop.
Eight, matters needing attention
Before starting 1., ensure that the voltage, current and hydraulic equivalence are correct and stable.
2. Before the equipment is ready to run, all personnel must inform to leave the equipment before starting to run, so as to ensure personal safety.
3. When the slitting machine is running, it is forbidden to touch the running film roll or core by hand to avoid personal injury caused by hand involvement.
4. During the operation, it is forbidden to scratch and cut each core with a knife or a hard object. Xuchang hengyuan papermaking machinery co., ltd
- Previous article:The origin and history of human resources
- Next article:Quzhou tasty restaurant
- Related articles
- How much is the salary of Jiawang Nuon in Xuzhou?
- Batch 401 is unqualified and well-known brands have been on the list many times. You really should eat less of this snack.
- How to promote mobile game agents, and what methods are there?
- How about Jiangsu Shengguang Health Management Co., Ltd.
- How to get to Fuxing Motor-bicycle-fittings City from Guangzhou Railway Station?
- Tie or bow tie with double-breasted suit?
- Is Yunnan Guangsha Planning and Architectural Design Institute Co., Ltd. a state-owned enterprise?
- Responsibilities of Deputy General Manager of General Department
- Opening hours of Hubei Library 20 17
- Stunt blade supplement