Job Recruitment Website - Recruitment portal - Please help me translate an article into English.
Please help me translate an article into English.
2, the enterprise implements the shareholding system, and the investment of overseas companies accounts for more than 55% of the shares; There are less than 45% domestic shares, and the domestic shares are joined by the relevant three parties according to the nature of equal shares. Each shareholder shall assume legal rights and obligations according to the shares and distribute profits according to the shares.
3. The enterprise shall set up a board of directors and a board of supervisors, whose composition is determined by the enterprise's regulations and legal powers.
4, the enterprise implements the full appointment system, according to the appointment system to work, receive wages and enjoy the corresponding treatment of enterprises. Shareholders (natural persons) will work according to the appointed position, receive wages at the last post of the enterprise and enjoy the corresponding treatment of the enterprise; If you don't work in the enterprise, you won't receive salary and enjoy the corresponding treatment in the enterprise.
5, the scope of business enterprise behavior
Development of electronic appliances (including lighting appliances and high-tech electronic technology products), production and sales.
6. The board of directors shall appoint a vice president, chief engineer and related key personnel.
7, commercial enterprise behavior strategy
1, the first stage: the production of products is mainly based on parts construction, and this stage is in terms of technology, equipment, personnel and social communication. Gradually reach maturity and harmony.
The second stage: in addition to continuing to produce products with parts structure, we will gradually develop and produce electronic city logistics machinery board by ourselves, so as to improve product quality, reduce costs and increase profits.
The third stage: strive to become a brand and pass relevant certification and ISO certification.
4. The business field is mainly leased.
Eight, commercial enterprise management plan
1, the first stage (6 months): small-scale production will be carried out after the trial production is qualified. (To produce 60,000 electronic energy-saving lamps every month) Gradually establish and improve various rules and regulations of the enterprise.
2. The second stage (June 6- 10/October): I mass-produced it. (Achieve monthly production of electronic energy-saving lamps100000)
The third stage: expanding product categories and categories, depending on market needs.
2007
Talk about cooperation and preparation in September.
10 to sign the contract for establishing a cooperative enterprise and draft the bidding enterprise documents; Investigate products, technologies, processes and equipment; Establish the board of directors and the board of supervisors, and determine the main managers; Invest a sum of money in.
Rent a place in November; Bidding for commercial enterprises; Invite a small number of architects; (accounting, assistant, procurement, technology) find a supplier to cooperate with colleagues; Local simple decoration according to production requirements; Product manufacturing; Order equipment; Draft a management document.
/kloc-prepare to host a commercial enterprise in October/February; Product production has been finalized, performance tested, and materials for small batch production are ordered; Draft a process document.
2008
1-February Installation equipment, commissioning and operation; Recruit advertising producers, do a good job and prepare for opening.
Conduct personnel training demonstrations and carry out post work; Customized packaging boxes and boxes; Trial production, assembly line management, small batch production (500), product aging, testing, quality inspection.
In April, the production process was adjusted and improved, and mass trial production was carried out; (the first production 10000 is 15 days), and the second half of production is 10000. If there is a problem with the quality of the supply, we should find a new partner and run it after mass production.
Officially produced in May, with a monthly production of 30,000.
The first batch of goods was exported in June.
If it goes well, the plan can be advanced by 0-2 months. I mainly consider that February is the Spring Festival, and there are some problems when I started business years ago: there are other expenses, and people recruited years ago may not be able to come after New Year's Day, and then they want to recruit and train again, but they can't produce because of lack of posts.
If there is no requirement from external companies, a cooperative factory building contract can be signed in September, equipment and production materials can be ordered in 10, and batch trial production can be carried out in 12.
- Previous article:Do you want to boil the flow single staining tube cells?
- Next article:How about Ziyang Dental Vocational College?
- Related articles
- How about Datang Wax Art Factory in Gangkou Town, Zhongshan City?
- Where does Jiaozuo sell Shikefeng corn controlled release fertilizer?
- How many buses can you take from Hong Kong Road to Xintang Vanke Plaza?
- Address and transportation of Air China Building in Inner Mongolia
- Can I learn the Danai course in 4 months?
- What is the number of applicants for the Anhui Provincial Water Resources Department in the first half of 2022?
- Song Min: The road to entrepreneurship begins in the cesspool.
- Which APP sells things and delivers them to me faster?
- Which province is Hulunbeier?
- Do you know the Hanlin building in Jinan, which has not yet opened? Do you have much room for promotion here?